08/0175 - Response to information request [As Published] · 132008.175

of 93

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

i

   
   
    
  
   
    
 

    

Councif's Reference: 2008/175 ~.-

OurReference: OO475L12NG: .
Our Project Planner. Nadine.Gorton | la OO

oO . consulting @
. . : pty Itd
town planners +
3” March 2009 urban designers
Chief Executive Officer
Sunshine Coast tRegionel Council:
Po Box 144 “TR ao
; TEWANTING 4568 | ves
4 Sat

Attention: Land Use Section - Kerri Coyle

Dear Kerri

 

RE: -RESPONSETO INFORMATION: REQUEST :
APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL. ‘CHANGE OF USE FOR A
MULTIPLE DWELLING (22:UNITS) AT SERENITY CLOSE, NOOSA HEADS, DESCRIBED
AS PART OF LOT 603 ON SP188270 (PROPOSED LOT9) PARISH OF WEYBA, CBD
SETTLERS COVE PTY LTD

cen ee

| refer to the above development application and i in particular to the request for additional information issued
by the Sunshine Coast Regional Council dated 10” April 2006.

This request listed twenty-six (26) items that Council considers it requires in order to. complete its
assessment of the above application. The applicant has decided to respond to all of these items.as detailed . ~
below: Oy Lo,

LANDUSE a a a Oo ,

ftem 1: A site survey indicating the building footprints.”

A ticant's Resp onse :
The applicant has. provided a revised A3 booklet which provides updated architectural plans. Page 67

of this booklet provides a plan of the site including Contours, existing trees and the overall roof form of
the building. Page'62 provides a plan illustrating the basement configuration whilst page 63 Provides
a plan of the upper level.

 
  

 

item 2: a a ' Si g pe ety areas of vegetation to be retained.
- 5 ve . we
licant’s Re onse: * * a

Page 67’of the, revised booklet indicates the’ existing ‘vegetation to be removed. ‘Additional, detail, ‘of. 7
existing trees located on site is provided by Plan No 050908 prepared by Ken Hick and Associates. *
is o a
The site-v was ‘seléctively. cleared in accordance with the conditions of approval for the Reconfi guration ve
of a Lot approval - 23118 DA. Existing trees on ‘site are to remain until the Operational Works —
approvals a are: granted for the Landscaping and Earthworks associated with the unit development.

The remaining "existing ‘vegetation on site has been: ‘deteirnined to be of no real significance. As. part of any
future applications ‘for Operational Works - Landscaping the reinstatement of specific species deemed
important to. this site will be detailed. Consideration will’ also be given to the preservation of any trees not
directly affected by construction works at the time of this: application.

 
 

   

GYMPIE OFFICE -

SUNSHINE COAST OFFICE. * **. . .
1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q 4567, ; 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE'Q 4570 x :
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 ope * TELEPHONE 07 54827440 - FACSIMILE 07 54824952 | ae

[email protected] com oF a mail@martooconsutting. com -

    
Full text of the other 92 pages

Page 2

 

The impact of the proposal on thé existing vegetation is similar 18 ‘that approved by the existing development
approval 23119 DA over the site. Both 23199 DA and the current proposal include a significant basement
that requires excavation which is similar to the approved building + form approved on Lots 3 to 6. The current
application proposes no significant changes to the approved floor level (23119 DA) between Lots 8 & 9,
which render the fetention of remnant trees along this horthem boundary impractical.

oe “Bo >
tem 3: “Bing élevations to include reduced levels (RLs) to roofiines.

Applicant's Response: * : ;
The revised booklet prepared by DBI provides plans. ‘that indicate building elevations with reduced
levels. we)

 

ttem 4: of Confirmation that  bilding does not éxceed d building height in metres.

Applicant's Response: °

The revised booklet prepared by: DBI provides plans ‘that indicate the building as complying with the '
Noosa Plan i in. relation: to ‘height.

   

ftem 5: A drawing indicating the footprint of the proposed development overlaid with that of the
é, previous approval. ° .

Applicant's Response:>. . . S

Page 68 of ‘the revised. booklet prepared ‘by DBI provides "plans: ‘that’ ‘indicate ‘the footprint of the

proposed building over the previously: approved development. approval: As indicated by. this plan the

proposed building is generally located in similar aréas’to that previously ‘approved: It is’ noted that the #

northern building has been moved further riorth coiriciding with changes'to the arrangement of the lot.

This configuration provides opportunities for greater separation between the units. as well as a

+

reduction in the impact.of the building form through the reduced areas of the first floor. oe
: me “
ftem 6: * Amendment of: the colour palate to enhance integration of the development: with the
, . vegetated setting. os . , a

ea revised ‘booklet: peared by. pal provides ‘a ‘colour. paiate (82) that: is, ‘sympathetic to the
surroundings. : rye ty 4 : :

ag
, ' ‘ . \

 

item: 7: boas “wniten details of the disabled access provisions.

: Applicant’s Response’ * “ :

The’ Noosa ‘Plan: does.:not detail any specific requirements. in relation | to disabled, access for unit
developments. ‘The: proposed development will comply with relevant legislation regarding..disabled
‘access: +

    

: oe ee
a
ope applicant has. provi two disabled cafparking spaces which are. detailed on pages 62 ‘and 63 :
the DBI booklet.“One- ‘space is provided in ‘the’ basement level with the other near the front ‘driveway: e
access. The. nore trai ig engineer has. advised that thése disabled spaces comply w wi ‘Australian - Q,

  
     

Applicant's Response:

The’ applicant indicates that rainwater will be. 2 harvested into 2 x 23,000 litre stormwater harvesting
tanks for the purposes of irrigating the landscape areas. Further details will be provided as part of
future applications. ‘for Operational works.

   

Page 3

 

@ Page3 . i _* x
m ed eo “
item 10: Provide confirmation of the proposals consistency with the management plans for the site.
Applicant’s Response: , ove
This development application , seeks approval for 22 Units over the site in a slightly different
configuration to units approved under 23119 DA. 23119 DA was approved for 22 units over the site in
a four storey building with basement carparking. This application was approved subject to a range of
conditions and the applicant is willing to accept similar conditions i in this regard.
taf OT ey t

It is also noted that the conditions of the Reconfiguration of a Lot approval (23118 DA) listed a number
of management. plans that. were to relate to the design, construction and operational phases of the
development. Most. of these plans relate to the overall development of the site with conditions
detailing that the operational works applications are to: ‘comply with the relevant Management Plans.

 

Applicant's jg leceate ye
The applicant's. traffic engineer has reviewed the plans and indicates that the proposed: ramp is 7.0
metres wide. _Refer, to Dianne Hayes Traffic Engineering Report Dated June 2008.

item 12: Amend plans to indicate turning areas at the end of carparking aisles.

Applicant's Response: -

The applicant's: traffic efigineer Dianne : Hayes ‘has. reviewed the [proposal and advises. that the

carparking layout i is ‘acceptable. Refer to Dianne’ Hayes Traffic: Engineering Report: Dated: June 2008.
ote ath . "Dk . * at nt mo ‘ -

tem 13: __ Indicate on the plans the tuming paths for vehicles at the intersection at the base of. the

me at the entry. .

Applicant's

The applicants. traffic engineer Dianne Hayes has reviewed the proposal and advises that the ramp ~ My

entry and aisle width comply with Australian Standards. Refer to Dianne Hayes Traffic Engineering

Report Dated June 2008.

ftem, 14: Indicate sight lines at the aisle and ramp intersection. ' vs LO : vs
Applicant's Response: .
The applicant's. traffic ,engineer Dianne’ ‘Hayes has reviewed. the proposal’ and advises that ‘sight
distances are adequate for the proposed: development. Refer to Dianne Hayes Traffic Engineering : a
Report Dated: June 2008. . . oy

 

,

at!

item 15: - Indicate Sight lines for reversing from the disabled carspace. 7
Applicant's Response:

The .applicant's traffic.engineer Dianne Hayes has reviewed the proposal and advises that sight
distances are adequate.: Refer to Dianne Hayes Trafic Engineering Report Dated June 2008. ©

 
   
   

item 1 ee ee rovick dimensions forcarparking sisies, ramp and carspaces.
Applican 's Response: ’ : fa a ;
Amended, plans have. been prepared and are: ‘included in'the DBI booktet. These ametided. plans ~ " ww He
detail dimensions for the’ aisles, ramp and carspaces. . Refer to Dianne Hayes Traffic: Engineering ° ve
Report Dated June 2008."4. - wy ,

   

    

. *Indicate. on :the plans the grade of access ramp and provide detail on the available,

7, ™+sheadroom, . a. :
Applicant's Response: on: ‘ : co
Amended plans’ have been: Prepared and are inéluded in the DBI booklet. These amended plans ‘
detail dimensioris. for the. aisles, ramp and carspaces. Refer to Dianne Hayes Traffic Engineering
Report Dated June 2008.” .

   

Page 4

wee

. The applicant. will comply with relevant Council policies in this regard.

 

. we -
ey “+ a.
@ Pages ‘ z. . - ”
. er
a .

 

ftam 18: Indicate the location of service and delivery \ vehicles parking.

Applicant's Responge:’

Amended plans have beén prepared and are included i in the DBI booklet. Refer to Dianne Hayes
Traffic Engineering Report Dated June 2008. :

ttem 19: Access criveway traverses existing water and sewer mains. Provide details on proposed
vertical clearances.

Applicant's Response: St ay

The applicant Has provided additional plans that details the vertical clearances of existing services in

" relation to the access driveway Refer additional pages DBI - 74 to 77._

 

item 20: ” Provide preliminary ‘stormwater disposal desin
Applicant’s Response: “| “*
In accordance with the conditions of the Reconfiguration of a Lot approval (23118 DA) a stormwater
management plan’specific to the proposal will be lodged as part of a future application for Operational
Works - Earthworks and Drainage. The reconfiguration conditions indicate that any Operational Works
applications will be. required to comply with the Stormwater and Water Quality Management Plan.

cy 4
Council has previously taken the approach for eulrolinaling: \ots (3:to 6) of conditioning the approvals to
require submission, of Operational works applications with regard: to stormwater. The. Applicant: is
willing to accept a condition in this regard.

item 21: Provide drawings that clearly indicate locations of all infrastructure on site.
I *s Response: . 7
Plans prepared by Ken Hicks and Associates numbered 050908 details the location of the existing :

sewer lines around the boundaries of the site.

item 22: . Provide along section of prepased finished surface level along line of existing sewer
Applicant’s Response:.,

Amended:plans have been’ prepared and are included i in the additional pages 74077. ‘Itis noted that
the buildings are well clear of the sewer line.

 

wot

Item 23: — - Provide cross sections of finished levels across easement and walkway. ,

Applicant’s Response:
Amended plans have been prepared and are included in the additional pages 74 to 77: :
. oe “ys ‘ ‘ va
ey Ry,
item'24: ° ‘Landscaping to comply with Noosa guidelines.

Applicant’s Response:

® t aot
ve ated

oa . “, . . ote , *
ftem 25; °* . . Waste Management Plan. mo %,
Applicant's Response: ‘
The applicant.has’ indicated that the buildings will’ be served by garbage and recyclable waste chutés.” *
on each level. ‘These’ will discharge into waste bins within the basement area which will be emptied = -r«.,
periodically at the: street by either Council waste management services or an approved contractor:

   
  

Sufficient room has been.afforded within the basement area for bin storage such that the bins may be (B
rotated, replaces and/or,stored between and during street servicing. The process of bin rotation and eR
the arrangement for collection will be the responsibilty. of a dedicated manager in accordance with the / Mos

  

Community: Management Statement

wae

  

Page 5

   

© Pages oy

   

a 8

The supply of this addi onal information completes the applicant's response to Council's above request for
additional information in relation'to this development application. Would you please provide us with a copy
of the relevant adjoining owners so we can commence public advertising of the application.

he ee .

    

Nadine Gorton
Senior Planner’ : ~:

Martoo Consulting Pty:Ltd
* ree

 

Ene:

DBI Booklet and additional plans 74 to 77 - 6 Copies
Traffic Engineering Report prepared by DM Hayes - June 2008 - 6 Copies
Ken Hicks and Associates .- Survey Plan -.6 Copies .

 

*:

 

 

Page 6

CONTENTS

|
|
|

 

1.0 APPLICATION DETAIL 1 6.0 DEVELOPMENT SUMMARY 9.0 ARCHITECTURAL DRAWINGS
1.1 application details & consultants 3 6.1 development summary 30 9.1 lower ground level - site plan 62
6.2 development summary 31 9.2 ground level - site plan 63
2.0 EXECUTIVE SUMMARY 5 9.3 level 2- site plan 64
2.1 executive summary 7.0 LANDSCAPE INTENT 9.4 level 3 - site plan 685
7 ‘ 7.1 landscape masterplan 34 9.5 level 4 - site plan 66
3.0 LOCATION & CONTEXT 7.2 landscape intent statement 35 9.6 survey & builcling heights detail - site plan 67
3.1 context 10 7.5 recreational precinct 36 9.5 proposed development overlaid ae
3.2 location 7.6 forecourt precinct 37 with previous existing approval 6a
11 7.7 design analysis 38 9.6 typical unit‘layout 2a, 3-3 & 2h 69
4.0 PLANNING & URBAN ANALYSIS 7.8 pools and water features 39 9,7 typical unit layout - 3A, 38-2, 3B 70
4.1 settlers cove masterplan 14 7.9 materials and finishes 40 9.8 typical unit layout - 3C lower & upper 71
4.2 current approval 15 7.10 materials and finishes 41 9.9 sections A-A & B-B 72
4.3 current approval 16 7.11 planting and species 42 9.10 section c-c 73
4.4 current approval 17 7.12 planting and species 43 9.11 site plan 7A
4.5 precinct and height analysis 18 7,13 planting and species 44 9.12 long cross section 75
4.6 circulation & connectivity 19 7.14 planting and species 45 9.13 section 4 76
: 9.14 section 2} 77
5.0 SITE ANALYSIS 8.0 ARCHITECTURAL INTENT 9.15 disabled access 78
5.1 site photo - serenity close facing north east 22 8.1 Concept layout design 50 9.16 elevations 80
5.2 site panorama 8.2 architectural intent statement 54 9.17 elevations 81
5.3. site view - facing south east 24 8.3 materials and finishes 52 |
5.4 site photo - view facing north west 25 8.4 colour samples © _ +53 |
5.5 constraints and opportunities 26 8.5 3d perspectives-massing siucies BA |
5.6 cross sections 27 3.8 3d perspectives massing sivcies 55

|

   

Page 7

=
=
fo,

 

 

000'911S5
V ONICGIING

 

 

 

\
\ a
D s °
!
° Y 9;
‘Y anftty 44
° ,
%
oe ff °
“eo / °
& 5
Oy 4
7
000° 15S Ws
ae
s ~~
s ~

ae ~S

WSDL ssjy ; sO
~
<

 

 

 

 

 

 

4SO19 ALINSYSAS

 

site plan

9.14

ve

Page 8

 

 

 

 

 

 

~ 7 taser tss* WATT ONOND aIAO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sou iss” Z TAM

 

 

 

 

ors”

|
|
~ | sone ass” CAT
|
|

 

 

 

ass 77

 

ASYONNGG A181d0bd

 

 

9.12 long cross section

Ne)
~

 

Page 9

 

 

  

 

INIT WALVAWUOLS 028I

OP, wee

 

 

 

ey OSU TSS TIAITONTOSD SINT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

H1¥d ONILSIX4 ll TON

~~ ~~ OT : a
— a 77 77 7-7 ~_ - NOW TSS | HAT an
- 77 a 7-7 — > ~ ous TAIT
oe B_ _ _-& Bo _
3 3 oue TSS ETT

= 2
. S
! =
| 2
77 a 77 — > TSS
t
{ ay aces
ro -- -- -—- — —SHsS*- -— —— - -— ——

 

 

9.13 ssection 1

Oo

Page 10

9.14 section 2

My
~~

 

 

INIT Y3M4S
°

AL

 

 

 

 

avou

gui

HLVd ONIESIXI

AWONNOG A1Yad0ud

 

 

INIW3S¥3 |

ne

 

 

i AVM JANG 31 34NOI

 

 

met

Page 11

 

 

 

 

 

S|
“hy

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

i" Nf i . or] ee _ J oF or ow | so =
" . = oe = PO oH rd oF 7, oe
808090 a I ’ ; a ae ee ce =
, ‘pus "ON Bun oe oo feo ave oe oun ae ‘oor ee oye OE ot of oF om 10__ | neranomuis oF oe oe. fe <3
ue puauy n_Sujeoig os [oa [v0 are. 74 +h } oof oa 4 ie — o o< | of] #0 =
* 0aZ4 ayo oF oF tO x70 Ee. i . oe on 7 > TF or om 1 ie
b NPIS oe Tos [vo 270 ore, t oe ea ae sions oH oe joa | =
os_[ oe | ro ae a8 os | oa | +o
f S42us J 90 JON 420us os [ex [re [me fre oe ea ee tee &
i woneoeorooeopooe ald 49;nduoy or os | co BaRHD id oe oe ee aa a oF er |e ah
5 of | oe [10 are ae oe} 4 te an. = ve fos |e mr
t spe Pre fmf | | . a fee [eee Pe see Pe =
ib or oe ZZ SERAAD Et oF ot eo Eo vat oF ow bad
~ oe os | eo wo ez, I = os | zo 0 a oF 7 0
o_[ os | vo are ee of oe 4 fe SS ores |
oe oo | eo ssawa eee of OZ 7, ar0 ca 22 oe £2
oe | ee _[e sSmadiD oer \ MUW ONISTA ® wo oe Poe Te > oF oe pow | co
oF oe O_ | oarmons eee oF oF 70 = ow [oce | 90
os | or] re rr nae Wa ’ ot ce 4} fe = or] oe]
<= os ad TESA 5 Boe oF oF 1. cz a on 28 ad
os [oe [ve ra we os | oe] 20
oe oe fo ne iz | of oe cx]
or [oe | co ao ore oe poe fe
or | o_o 20 = | oe [oa | eo
ov [oe | vo a0 er o [| os |
oe | 09 | #0 Tisiere ae i oe [os | ve
or [0 | ee 36 zs or | oz | +o
S220N or oe we YD oe ‘ on oe 20
wO7e71 e00 | a UADay or [oz | eo ro ne or [oe | eo
oe oe | eo 00 Tee oe | o¢_| ro
7% 830 pekanuns, o_ [oz | re 20 ze o fe |
Cae ie ne z ow foe | +o
a7 ove paubisaq or oe zo ao oF 1 os om no
oe [oe Tsar ear er _ [ow | vo
oe fos [vo ne oor oe [oa | co
of ce [10 20 Zo or pow | ro
oe fos] ro ae 30, or pow |
os_ fo | aro oor or | ov | co
f or_| ce | zo a0 ror oe | ow | co
oe fo _| ve are Tar oe bow | co
oe | oe | co rc ear or [oe | eo
Ronpuny feer  A oe Ton vo 7. wor oe | oa} oo
Squaupuauy oe] ce |_ro EZ) oor or [oa] te
oe | oe Jeo “aro oe or [oe] vo
oof oe | se oe oe oe | ew | ce
oe [os | +o resaave 2 orca _| eo
oe | o [to] sssuana oer or [oa |
oo [os | co 0 eer _ or oe] ze
or [or | vo 20 rere oe [oa] eo
oo [ow [eo | saseuas ne SE or foo] eo
os oo EZ UVEASLS. es vind ~ oe Oe oF
SUSBNIONA - Salvi} +e eet 992e0eet---——-N ote
or [oe | ro sszeua> on os | oa | ro
54UDZINSUOD pazopossy oF oo £0 xr oe oe ow 20
orf ea | co | teseeas oe os | o4 | eo
oe oc | ro] sasacan za oe [ow | re
or foe | <0 ra ae or | oa | 0
or [oz | ro Ec ow or pee | ro
or fo. | re ae. va ov fox | zo
or fos | co ae 7 oe [oa | 0
or | oe | co | sesewaa om oe [oa | ro
Aé a a $700 m o [ea | ro
wth ; or few | re sem on or |e | eo
 |6-% $101 G3S0d0ud | |=—p=t= | om te = fests
é or | os |_o we ei oz [ce | ro
+ USAO NVId oe [ow | so | tema 77 or [ea _] 70
ewes I OF On 1 v0 a oF oor zo
% | NOMLYIISILNIG) JIWL | | ees [ae aaa
+ aoafoug o__| os | ro #0 7 os [ow | ro
hf oof eae reer pee ts
oe oa | vo | ermanuis | az on fea |<
: oem | co | xermonus [er oe | oa | 0
oe | o« | 0 Fz oh or | os | ro
oe | oe [zo 20 om oa [oa | so
on] oe | ro | saree om oe oe | ee.
i oe [oa | to rae |e LL oa pox pre
of [oz | zo 270 om oe | on | ro
os | oa | co | xwvecowazs | on oe [on | te
off os | zo TENE oa oo [ea | co
GUVANOG Jdv9 ||P ete be ee Pe ees [es
~ oo OL no ISHN oe oe oe re
quan of ca | ro | vevacomars [ror oa [coe | 0
os fea | co Ec oar oe on | re
orf om [eo sasusa = on pow | ro
orf ce feo 70 oe ae
os [ow [vo ae a 4 oe [ow | co
ee os_| 0 70 oe ! oe Toe Teo re a of oe |
oF oe <0 xV0 o iy oor Oe fo ro st Of oe Zz
“STR "S71 J997E PHROQ, oF om Zz 0 oe t 9 oe oot 20 SSIbAAP wt om om re
SBLYROSSY HORS oe os 1 0 ce a sO or | on | re SSHUAAD © oa os Te
(Aang) agcggv'g ‘vesuEH eog Of oF zo 70 a ‘ oF oo 1o ree = oF Oar To
Sov $1 bua 400 Of oF re Fic im of oa #0 SSHAD Lx oo. om Fo
‘SUNOD WL tery CH ‘ oF oor 7 SSH4GA2 oF —
Fava “sLee tenes momuy oe} ee ae = wa or | oe | S5I0aAD e [pemae Jere oe peter
swouzai oot eee Sar at of | oe | ro] sesame we
orf oe | eo] semueas aH oe [ow | ro_| roenme | a
- po wos sa aRUDNESWDUINS LOUEIAD ea os ow || ses = a [ow fw
veg (eee ero a earl oe oo | 7a raw rams ee oa [on_|_90
Sle Eves Lol 104 or oo + XOG RSNe ae oF oor ce
rvaz Seve (ol woud \ a ee paste
™ SSH s1DPkysO0.0F) of on re zz on on 12
* thous BL GF { of fon | so | sssmuio © os | oz | <o
BeoOANDOOUT oF om £o $SIGcAP or or oF Zz
of [ew | so | ssxamua = oa [on | so
5 SUANNYId NMOL a ae os fee_[ eo
oo [ea | zo = Z
om SHOAHAHOS ONLLINSNOD (816108 da} oF Om ro S87? ~ of Om 1
" e9rttdne oF oe to SEPA? a oF oor eo
: os} ow | ro me. me oa [oa | ve
. BaLVIOOSSV GNV @® i (1) ce fos Te we 7 os ce
¢ Wsd | or foe | ro | mu 2 oe [on | 20.
S¥9IY Udy steps pee | pete te
EJ . j or on +o rowre a oe on eo
fe] = A oe oF iz wo « oF 7 Zz
ey fad Fs i o fos | ro ASANTE. e oe [ew | ro
a = 1 oF ow eo SSHbAD é oF Oo £0
ees ee -{ os oa | We 2 oo_[ew | #0
el Fy | of fe [| Tears, ¢ on [oo | ee
= = { oF oo 1 i o OF oF 2.
SS = J 4 oe | os | ne, f os | oz | ee
= u orf oe |e _ | eed z on | os_| 10
i =| tL eos re] ae 7 of |e
, = i a I ee Sr D9 ee ed)
V. J

 

 

 

 

 

Page 12

BuNnidgaiinouv

?

 

 

Sooner LY)

 

 

 

 

SNNEDETZAT TAMECREN G Men

DINE

@eeeesgscveeedeedgee eee ee

Page 13

Page 14

CONTENTS

  

1.0 APPLICATION DETAIL 1 6.0 DEVELOPMENT SUMMARY 9.0 ARCHITECTURAL DRAWINGS
1.1 application details & consultants 3 6.1 development surmmary 30 9.1 lower ground level - site olan B2
6.2 development summary 31 9.2 ground level - site plan 63

2.0 EXECUTIVE SUMMARY 5 9.3 level 2- siie plan 64

2.1 executive summary 7.0 LANDSCAPE INTENT 9.4 level 3 - site plan 65
7 7.1 landscape masterplan 34 9.6 level 4 - site plan 66

3.0 LOCATION & CONTEXT 7.2 landscape intent statement 35 G.6 survey & building heights deiall - site plan 57

3.1 context 10 7.5 recreational precinct 36 8.5 proposed developmen overlaid

3.2 location 7.6 forecourt precinct 37 with previous existing approval 63
a 7.7 design analysis 38 9.6 typical unit layout 2a, 3b-3 & 2b 69

4.0 PLANNING & URBAN ANALYSIS 7.8 pools and water features 39 9.7 typical unit layout - 3A, 3B-2, 3B 70

4.1 settlers cove masterplan 14 7.9 materials and finishes 40 9.8 typical unit layout - 8C lower & upper 7\

4.2 current approval 15 7.10 materials and finishes 41 9.9 sections A-A & B-B 72

4.3 current approval 16 7.11 planting and species 42 9.10 section c-c 73

4.4 current approval 17 7.12 planting and species 43 9.11 disabled access 74

4.5 precinct and height analysis 18 7.13 planting and species dd 9.12 elevations 76

4.6 circulation & connectivity 19 7.14 planting and species 45 9.12 slevations 77

5.0 SITE ANALYSIS 8.0 ARCHITECTURAL INTENT

5.1 site photo - serenity close facing north east 22 8.1 Concept layout design 50

5.2 site panorama 8.2 architectural intent statement 51

5.3 site view - facing south east 24 8.3 materials and finishes 52

5.4 site photo - view facing north west 25 8.4 colour samples 53

5.5 constraints and opportunities 26 8.5 3d ves massing studies 54

5.6 cross sections er 8.5 3d perspectives massing studies 55

 

[Roo Tani bye asst 5)

Page 15

Page 16

 

S INWL=

 

 

 

 

NOVO Tc

 

 

 

 

 

 

 

Page 17

ne
a a)
De Te ae

 

 

 

 

hme ee yweyanaah ben
PO ICterstr iti riser i tiyeater iy

 

Page 18

Application Details Anc Consultants

Client / Applicant:

Site Description:

Site Area

Application Details

Consultants

Cape Bouvard Investments Pty Lid

Serenity Cove

Settlers Cove

Noosa Heads QLD

Lots 9 on Lot 4, SP 100064, Parish of Weyba
Approval 2005 = (6 534m?)

Current = (6 664m°)

Proposed = (6 032m®)

Code Accessible Development Application for a Material Change Of Use

Architecture & Urban Design:

Architecture: DBi Design

Contact: Ewalcl De Weerd (07) 5539 9788
Statutory Planning: Martoo Consulting

Contact: Nadine Gorton (07) 5455 5425
Landscape Design: DBI Design

Contact: Scott Godfredson —_ (07) 5539 9788

w

Sjue]|NsSuos 9 sjlejep uoHNeoidde 1-1

Sills Cove

 

Page 19

Page 20

 

 

 

 

 

AAWAANIS SANLNO=

 

 

O'G

Page 21

@eeoeeeaenvenvev00000202000000000808808880 8

/

 
   

Page 22

EXECUTE SUMMARY

The subject site (0.66 ha) forms part of the Seitlers Cove masterplanned community. with an outstanding location and size. providing opportunity
for a high class residential development.

 

Settlers Cove is centrally located in Noosa Heads and a future boardwalk along the creek will allow people to access the beach, public transport
or Hastings Street within 10 minute watk.

The proposed development is on lot 9 which slopes steeply towards the park with southern views of Noosa Shores, wetlands and clistant
hinterland.

The Proposal includes 22 apartments with a mix of large 2 and 3 bedroom units and 2 penthouses.
All car parking is accommodated in basements with few short term visitor spaces at grade near the main entry.
Visitors to Settlers Cove will arrive via Banksia Avenue with lot 9 on the “cul de sac” of serenity close.

Main access to the site is from Serenity Close with a grand arrival fore court and porte cochere with water features and strong visual axes
between reception, over reflection ponds, resort pool and landscape feature in park.

The architectural treatment will be consistent and en extension of the proposed 5 star resort hotel but respond and fit within the current Settlers
Cove Masterplan and residential built form.

Height limit is 4 storeys and a low site cover of below 25% allow for opportunities to improve existing vegetation with high class landscaped
recreational facilities and connectivity with park, streetscape and wetland.

The development consists of 2 buildings 4 storeys in height and focus on achieving north-south aspect and cross flow ventilation

NI

AYVAINAS SAILNDAX3

 

Page 23

Page 24

 

LXSINOO NOUWOO™

 

 

 

 

Page 25

 

 

 

 

oO
~

3.1 context

 

Page 26

  

-

- 3.2 location

   
    

 

LOT, 9 RESIDENTIALFAPARTMENTS

ny

Shits Cove

-
oO
au
w
Se
ann

 

 

 

Page 27

Page 28

 

 

 

 

4.0

 

- oo tae
tet
oo 3 ete petted hha
et “sagt Sad Mikey EE aE
TR eee eae

fe

 

 

PLANNING & URBAN ANALYSIS

vn ot oe et et et et oe Ot Se Se Oe St SS Se Se Se SO Se SS Se se se

Page 29

SMTA ESL Lea aNaN ele]! oh FS

ee ee ee re ee eee

WD LY)

 

: Nee

ALLar
a3sod0ud

4.1 settlers cove masterplan

 

eeeeoeoevoeveeveneaneveveoenee0e020e00200008088 08088868 @
+
_-

Page 30

vo
Se
aa
v
\
\
\
\
&
we \
m oA
= 2
x Vom
bh \
z B
% Ss
Ss YZ,
SS Do
& ‘Se
N
R oe
‘
\
\
\
\
1 \
i \
j \
i

2859
02.66.1627

5330m?

 

 

(TOTAL)

   

(6534m?)

NOLLDBLOHd SAVMUELWM ONY
NOLWASISNOD HOI ZONES NIAO SYNGE _

   

 

       
   
    
  

9 on SP 100064
sh of Wewba

 

nD
OO

Loca wn Noosa Council

 

  
 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
  

elle

9002

. HET

PROPOSED APARTMENTS)

 

       
  
  
   

sfl-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Landscaping subject
to further application under
‘operational works’ Landscaping
to be in accordance with NSC
landscaping guidelines 25/05/95
‘Coastal Beachfront Areas’

  
  
  
 

NOOSA SHIRE COUNCII.
LANS APPROVED

kidd
a @)

designers

SIGNATURE:.... SA Maw

  
     
   
   

70 Quka Sveai
Sunshine Beach QLD 4567

PO Box 252
Noose Heads QLD 4567

Telephone 07 5447 5633
Facamio 07 5447 5833

intogiuddeo. com.au:
wre BI0800.COMT,
Ta ommeg ss whe
reas iemeginctcn eh
Ereroces Orearga &
Repoe
Continacton w caret
wh at ecark SAA
CA Cones & snared
(ng By ta 1975 b os
wronded

erty «8 éemenulons on

 

Projeca
PROPOSED NEW
UNIT DEVELOPMENT

Loceton
LOT $ SERENITY CLOSE
NOOSA HEADS

Crem
SETTLERS COVE
cus
SITE PLAN 1:250

Scme ate
1:250@A2: OCT 04
Brawn By

NIL

0215.09.SKO2A

Vetller tbo

—
on

jeAoidde yuan Zip

Page 31

 

  
             

PELE! | SR CER ro

                     

 

 

Vv0HS'60°S120
on Syed

tN
4a ume

70 190 Z2v@002:1
mo -—s

     

ao

NVId 1339
vem

AOD SUSTLLSS
wa

SGV3H VSOON
3S079 ALINSHAS 6 107
297)

ANSWdO13A30 UNM
M3N O3S80d0ud
eens

  

aymulvd ONIHRNVAW SOM WE oe
° 1 a Dene TTT UBiiiasog Medan ee
Eee ay XI VF we -

     

acy NE

      

 

 

 

HINA ee

~
a
N
an

Seay juayyoeag jelseoD,
-4 Sersorsz seunapin6 Buydeospue)
OSN YH BoUEpICae ul aq oO}
- Burdeospuey syiom jeuogesado,
Japun uoneodde sayyny 0}
-8 »__algns Guidesspue) aageaspuy

, (13037)
“NW1d 40013 TWOIdAL
o 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

thuaperd 98 0 vagenc, pamaeny
1005 Gt NW,

Diansaion

 

 

 

 

 

 

 

 

 

 

 

 

 

    

ete

 

 

STAT VED
toge os phone
Have mee

1 onap 24 woolen
‘agen 4 pe

ma per iheee
fey oe hat A
saat 9 OA EE
0 noma huey

oe
mast ria toe

 

 

 

—

ACNE

 

 

 

 

Toit

yt

$4
eT

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AACE

 

 

 

 

 

 

 

 

 

 

 

+t :
th OM SEF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ene SOV eet 9
z,pes600-“~-—" aX

 

 

 

 

 

 

 

 

 

 

CCS crrg 20 opuREDEY
C095 Los 20 euauama,

 

 

 

 

4959 TO EpeoH S00
ee)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.3 current approval

2967 CID wees eurysung
wang eng of

 

 

ssousisap
CE re”

p ey > ape pew

“WINADD TaiRy WsGON :
. i

 

 

Ot

 

Page 32

  

= 4.4 current approval

  

OC

LOT,9 RESIDENTIALFAPARTMENTS

oe eee Ae ney

  
 
 

  

8 <<

¢ 5 188 5 9 = om

me eel, i 2-22 i s g

Ree oe See EEl es geze i eee se yb

z §| 5/55/§ = £288 BG bor} ao 2 }

~ Bal Hindt Ge le y2 babies 2 2

# lf 2 t HE Hae 3 z 2 a oe fs St 3

SSleElER ISIE] Fabp URS EESTUEEE Z g 2] HeEiS8ib39 a8isiS
8
be 3
zeg 2
Pa Ve
ae
ree

z g
I I
iad

War

 
   

 

 

NORTH ELEVATION...

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EAST ELEVATION...

 

 

 

 

 

@eeaeeoeeoeeaodeaeengoaoeeaeneoneeeaeneeaee@ee@e@e eee ee o's

Page 33

 

Mig
Ey]
Ne AV t ne

Beye Noy]

Cres

 

Si saps ORS NEL AMES) hPa EEA hog be

aN
ia

 

Seed

4.5 precinct and height analysis

co
—

Page 34

  

2 4.6 circulation & connectivity

  
 

LOT, 9 RESIDENTIALTAPARTMENTS

Sitters Cour

pedestrian circulation

c
g
=
g
3
2
S
L
&
s
2
=
o
>
i
I

 

 

 

@eeeoeeoeoeoeaeoneea4eaeeneedceeeesge1odgd@e~0ean@eaedee eee eo 6 6 ee

Page 35

Page 36

 

SISAIWNY SLIS

 

 

 

 

Page 37

 

7

‘wt

5.1 site photo - serenity close facing north east

 

 

 

eecoeoeoevoevenden0e0en0e0e20200080000080808888888 8 8 OC
NA
N

Page 38

5.2 site panorama - view along fire break trail and wetland

ee

 

SINSW Lava pVIINIGISSY 6107

 

 

 

 

@eeeeoeeeedeea@eaeeesngeaedeeeeeeeoeeee@e@ee@ee@e@e0e 60 e's

Page 39

 

 

 

N 5.3 site view - facing south east

Page 40

5.4 site photo - view facing north west

 

Ww
MN

SINSWLdVdVVILNSGISSY 6107

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@eocoogooeogcodod@ege@eodoqocedoedcoddododced@geaoaoed0od0doeddoedgedgdg0dddsd Ord

Page 41

i
re

 

fs

n ~ ty

2 8 5 ee

< € & et a

s g z 5 ae

7° 3B g & S a

So @ G& a =z 3 nia

e=-e? 2 ° > oe

ec s . ey

oD CG x < ie:
seas 2 Eos & e

>» — 8S a % = #8 ® Re

= D+ =~ o a 2 S a Fe

c C = GB € = g g = al

o 2 2 2 35 ¢ Q 3 gz £ & e
= 9 & S +5 6 2 z= ° g = = Sr:
$ 823225 2 8B § 4» #8 x
e232 f52 € FS ee Bg EB .
ao © $ e 3 & 5 @ 5 8 g§ 2 8g Ht
2 ®B qo 7- = 2 c © a Q 6 g > g 2
68 @ Pepe E& o¢ o a 5S e i
$ 2-8 s aa £ © z

= 2 € 8 Ss 8 5 6 6S oS 2 2 2 & fe
G6 © 6 < oO < 3s a = 2 & a = a & sl
5 =o» & & E

6 4 5 GB BF D PH Beaddau&u£=a@s a5
fH

hee

Bae:

 

 

Cita RS ia XR S AES
cinerea

ae

 

 

 

Bono coates

 

ENS ener ee

ners
ana

ert

RETIRE ENT

Vellrs Cow

Osea

P< eee aeapa des RES

& 5.5 constraints and opportunities

Page 42

 

 

5.6 cross sections

~
—N

 

 

 

AUVONNOG ALUIOWd TCS

 

|
|
fo.

WWELIS U9

  

 

 

   

id

|

AMVONNOG A143d0

 

 

 

¥V¥ NOLLO3S

@©®eeeoeoeoaeeeaseaodeodeee eee ee eeeeelel 8 8 8 8 ee

Page 43

Page 44

 

 

ACTA Vs LNSWNdO IAS

 

 

 

 

 

 

 

 

Page 45

w
oO

AseWWWNS JUBWCOJsASsp 1°79

  
         
  
  
    

  
   

SITE SUMMARY
29/01/2008 Development Application

uperseded Planning Scheme
(IPA-ised) Proposed Scheme

Setbacks

Building Separation Buildings seperated by 1.5m + 0.5|Compliant
per storey 7m

Length of Wall Walls to limited to 15m in length
Carparking No cover parking to be located
between frontage and build
Landscaping 6m Landscaping setback
2m to visitor parking
20% of site to be deeply planted

ee =

Population Density 250persons / hectare Compliant
250 x 0.66 = 165 persons 72 Persons

Road Frontage:
6m - 1 to 2 storeys
10m - 3 to 4 storeys

Side:
Half building height

6m Setback to Landscape Buffer
Zone

Non Compliant

Part of building A,
projecting 1m into setback
zone

 
 
 
  
 
 
 

  
  
  
 

  
   
      
 
   
    
 

    
 

Non Compliant
Part of Building B
basement and bbq pavilion,
projecting 1m into setback

 
       

 

 

    
     

     

   
   
    

Max population x 40 - not
exceeding 13,600sqm in any
building

a
Landscaped Open Population x 14 Compliant
Space 165 x 14 = 2,310sqm 5,000sqm
Building Height 4 Storeys, 15m max

Carparking 1.5 cars per unit Compliant
22 Units total = 33 cars
reqd - 43 Cars provided

Compliant
Max GFA = 6600
GFA - 4,400sqm

Gross Floor Area

   
   
 
     
  
 

  

  

Compliant
1,445 sqm or 22% of total
site area

   

Page 46

 

 

SLINAWLYVdVgIVILNAGISSY 6 LOT

°DEDYO

>
o
oO
Cc
Cc
E
a)
Yn
~
c
oO
E
Qa
2
o
>
o
OD
N
©

-
oO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

€£ vz 6 pasinboy [2}01

GLX GLX S1BD

49 c% OL 9 AyIsueg 9 Sjuewyedy

uoeindod | e303 | wage | wiqz JLIS YOd IWLOL

92 vL OL v 12301 qng

0 0 0 Wed Jed 9% sjuewpedy J@A87 PUNDIS JEMO7

Zeb v v sjuewpedy|  |@A8] PUNDIT /| |@Ae7

VL v z zZ sjuawpedy Z |eAe7

vib v Zz Zz sjuswpedy € eAe7

99 z zZ sjuewpedy p |@A07]
WLOL | WHde | WuaZ

uonejndodg sjuewyedy| eaiy esp Buipjing J9A97

@ SNIGTINGa

9'P7e 8 9 Z 12301 qns

er Zz 0 Zz weg JED F sjuswyedy Puno /L |eAe7

99 Z Zz sjuawpedy Z |@A97

9°9 zZ Zz sjuswpedy € J@A07

99 z z sjuawpedy p |@A07

TvLOL | wuge | WugZz _

uoneindog sjuswpedy| esisy jeasp Buipjing [aAe7

V ONICTING

ONIATING

 

 

 

uoyea|ddy juawidojeneq

g00z-Auenuer-62|
@AOD S13]H}9S 6 07

XIN LNSAINdOTSAAG

@@e@20@@e@0@20e0@@e@e@e@eeeeoeleleeeoel el eoeleoelee ee ee 8 oe 8 oe 8 8 e's

Page 47

Page 48

 

INSLN Ad VOSONW

 

 

 

 

Page 49

@,; e@eeeneevoeveaedne0oedeeeoendenoenoe2e0e02e20202808280808 8080 8

x ge" /
* Se .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

st
oO

7.1 landsgaépe masterplan

7
7
‘

 

Page 50

ao
on

Ge

The Settlers Cove Lot 9 design intent is to reinforce a sense of sanctuary with relaxed leisure opportunities whilst acknowledging the sites prominent
location ancl ecological sensitivity close to the heart of Noosa.

A lanceolate leaf shaped pool, cascading water feature. barbeque facilities, entertaining terrace and flowing bands of various plant communities
create a sense of space that is varied in scale and form. The promotion of key vistas. pedestrian links and placement of sculptural artwork establish
clear points of reference. Outdoor living spaces are orientated to take advantage of the views, solar aspect and to complement the adjoining internal
spaces.

Clean lines with state of the art finishes, materials and lighting effects are intended to produce a contemporary and stimulating environment that
caters for the sophisticated tastes of patrons and residents while encouraging recreational, social and communal activities. These materials intend
to complement the buildings finishes. blurring the spatial divide from inside to out. A combination of semi-permeable screening panels, solid
masonry elements, strategic changes in levels and carefully selected planting profiles will be used to control visual connection between the public
and private residential reaims.

JUSUd}e}S JUd]U edeospue}

Bands of vegetation consisting of endemic plant communities define edges and emphasises connectivity to the broader context. The differing plant
communities form patterns on the landscape, mimicking the rhythms of ocean while changing through the seasons to create spatial and visual
variety.

The patterns of plant communities provide a unique educational opportunity by creatively showcasing a palette of endemic Noosa flora. Contextually
appropriate species have been selected in response to the sites coastal location to fill niche roles within the landscape. A variety of trees and shrubs
spatially define areas providing screening, visual interest and shading whilst contributing to the amenity of the precinct.

Best practice ESD principles will be implemented including stormwater harvesting and the use of native plants with low water requirements. Solar
and wind access will be controlled through appropriately positioned screens, baffles, shelter elements and plantings. The use of solar heating, pool
backwash collection and treatment along with energy efficient external lighting will showcase ESD technologies.

Velllers Crowe
é _ Coss eS 9 RESIDENTIAL eas eS) ]

Page 51

esceenev000e0e00008080080008088808808808888 888 8

juaLUcoaASp

Hulolpe 0} UONOBULIOD BNI} BIQISSOq *
Luddy °

@SINOOQUDD |OOg *

eds

spueg AUNWWOD JURY UEPUQ *
cuuey 9 sures °
$]O0g aBunig SAU *

eBjoBleg YIM dluey wed veg JueLIaseEg
Bunsansely JayeM WwO}S

JUOLUPBOL] JOJEM LUJOIS PeoeOL

00g dey

AQQgo7

Buyueld anyesy pesiey

aunyee- serena Aug

UOAe O8

Ayu 6uipying

Orn Oo tT OY C

ov 6 ON OSD

- NN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.5 recreational precinct

oO
oo)

Page 52

 

 

 

7.6 forecourt precinct

NM
oD

 

 

 

 

 

"MEAN OGM

h° Lb 8 OL SO] O} UOHOBULIOD aIIqSSOg
~ WwAr

* @SINOQUOD jOOg

* spueg ANUNULUOD JURIg OLUEPUQ

sseooy dwey

SS800Y SUIRIS

BjOhuad YIM GlueY wed JO JUeWEaseEg
HEA ONAN

jOo0g deq

Aqqo7

Hunurg snes y pasiey

Pod IrweAK AnUD

  

ooo oo ogooogooeoogodooooaooooeoeoocagagaeaoeoaoo0g000 0 Oofed

Page 53

 

 

SUONBOO| SyUB} Isa~ueY Jayemulres Ey

BUOZ JUBLUILS] JBTEMULLIOS FG

i

@eeeoeoeeeenegeeeses @

 

 

SUuOaISIAOJd sseooR paqesip ueid aoeds uado ayeauid

 

      

LNSWLSVEVAVIINAGiSay 6110

—_s Fe re ee rey ne eee

00¢°6 Ty :esunoouO= jood OF
OOS'O! Ty 120881 9 Bole UOnRaOeiAUAB
O00'P lL TH 11849) Anus gy

(pli L> sdlueu / apes6 UO) ssaooe pajqesip <€--

S[BAg] UOSMyeq IY EWS] YIM UONOSUUCD EJ wubsoogo’s=eae je10) [

7.7 design analysis

co
oD

Page 54

  

OD >
«  ?.8 pools and water features

   
  

 

aA aa ee a aaa

 

Sirs Cee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@eeee@eae0edeecdeadneoesdee0e00000000008008000600 08

Page 55

eeoeeaos@eaeenennvueeneaoean0e20e20e02808080880808086 8

/

   
  
 

= 7.9 materjals and finishes

“
s
¢

Page 56

HARDSCAPE PALETTE

f APPLICATION: STREETSCAPE

   
 

MATERIAL: INSITU OXIDE SL 1) PEG IONCRETE
E FINISH: BROOM

COLOUR: TO MATCH E4iStT St REETSCAPE

SIZE: SUA 41

APPLICATION: HOTEL. Pout oN OS LPSE VE Hee

MATERIAL: NSITU OCDE TO Uo USEG LD ONCRETE j ™~

FINISH: BPOOM =
oO

~f COLOUR: TO FUTURE se LECTION
} SIZE: NA

APPLICATION: HOTEL / POOL CONCOURSE
pa MATERIAL: PRECAST CONCRETE PAVERS
48 FINISH: HONED

COLOUR: TO FUTURE SELECTION

2@ SIZE: 400 X 400MM

i APPLICATION: HOTEL
3 MATERIAL: PORPH YAY COBBLESTONE
FINISH: NATURAL
H COLOUR: NATURAL
SIZE: 200 X 200MM

soysiuly PUE syeueTeu

  

APPLICATION: POOL FENCE
MATERIAL: METALWORK FENCE
FINISH: POWDERCOATED
COLOUR: BLACK

SIZE: 12COMM HIGH

i) APPLICATION: SCREEN FENCE

: MATERIAL: TIMBER BATTENS / METALWORK
iE FINISH: NATURAL & POWDERCOATED

ff COLOUR: NATURAL TIMBER / BLACK METAL
# SIZE: 1500 - 1800MM HIGH

APPLICATION: FEATURE WALLS
MATERIAL: PORPHYAY STONE CLAD BLOCK
FINISH: WALLS

% COLOUR: NATURAL

# SIZE: NATURAL

i VARIES - 1800M MAX.

APPLICATION: GENERAL WALLS er = ARE =
MATERIAL: RENDERED BLOCK WALLS
FINISH: PAINTED RENDER
COLOUR: TO MATCH BUILDING ee
SIZE: VARIES 1800MM MAX. uJ a _ PETTITTE TL SSS) A

ee
eC Lea
ly APPLICATION: GENERAL SIGNAGE f a" A i on ' } mh
MATERIAL: TO MATCH ARCHITECTURAL DETAIL , OE oat tn oa
FINISH: TO MATCH ARCHITECTURAL DETAIL - , ’
f COLOUR: TO MATCH ARCHITECTURAL DETAIL
- I SIZE: VARIES

APPLICATION: BRIDGE BOARDWALK & LOOK IGT
MATERIAL: STEEL 3 TIMBER

FINISH: GALVANIZED & OiLc

COLOUR: NATURAL STEEL AND TIMBER
SIZE: VARIES

 

CUA a ala Aa

 

Page 57

eeeoaosvseaeeneaeeo0000080000080088688688 80 8

/

 

S | 7.11 planting and species

¢
/
7

Page 58

 

 

 

wy
&
5
oO
Q
no
U
Cc
©
D
Cc
=
c
&
a
NN
N

oD
t

SALWLISN SNONAL
VSOGON SIdd1OSI
ValadS¥ VINHVYS
VSONIDISNY VAINNYS
GNV1LAM

SN3ONVOS VILHASEIH
V3OVIOIA VIDYUSSNI0YVH
SY¥3SWIND

VaAOVES0SH VIOIA

IHACHY TNE VOd

ddS VHONVINGT

OCASHAANT WAWeH3dSOLd371
ddS W3ATNAJED

ddS VTISNVIG

Vaan ANITAGYOO

WO LY INONNG3d WANED
SNAOSAONVID SNLOWEOddVO
ddS WANHO3718

VSOTNNidS VISMNVSE

8NGOY VISHNVG

VATNYAVS VINIdIW

SNQIN WNINDIdSV
SHAAOOGNNOHYD / SANYHS

SIWHLSNY YNOLSIAN
SVYONVX3TV XINZOHDOLNOHO8Y
SW1Vd

WNSOS10 WAIDAZAS
SNIHOLOFAL SANVONWd
VIAXSNSNONIND YOANIW IAW
SNSOVALL SNSSISIH

WINGNSd VIINdYVH

SALW INOLSY SNdwVOO3V13
IWW3AdOOO VAHLVAD
SACGIOIGHVIVNY SISKOINYEND
VONWIS YNISVNSVO
VNOSIND3ALNI VISNVE
WINWAY VISHNVS
VNOSILISINOS VNIdeNSVYOOTIY
SAVEOLLI YNIdWNSYOOTIY
HIS YNANOY

S33uL

 

 

 

 

 

 

 

 

 

 

 

 

ooododgqoqoooeoqjeodoedgjoecoaeoeoeloclcmlcmjococlc~CMOCCOCCOocCcCOCCCC Aa Coo 0 Co lots

Page 59

f
oa

rte

samods pue Buyuryd

  

Each planting band is a community of Noosa endemic plants. A planting
band is made up of a grove of trees or palms, shrubs and groundcovers that
are seen in the natural environment of Noosa along with varying mulch to
accentuate the band. The bands are large enough to work as revegetation
but vary enough to evoke a unique character as viewed from above in the

development and provide a point of difference from the ground.

 

Page 60

   

Cabbage Palm Brush Box Coast Honeysuckle

    

   

        

   

    

Livistona australis Lophostemon confertus Banksia integrifolia
4
8)
m
m
no
Zamia Palm Grass Tree Sticky Hop Bush Midyim
Macrozamia tucida Xanthorrhoea johnsonii Dodonea viscosa Austromyrtus dulcis
‘= as i ; 2
a
Cc
QO
on
Coast Honeysuckle Mat Rush
Banksia integrifolia Lomandra longifolia
a Q
D
o
CS
6
8
<
m
aw
wn
<
c
Oo
rt

 

DED?

LL

saioads pue Bunueld pi =

 

Page 61

BANDS OF VEGETATION SHOWCASING A PALETTE OF ENDEMIC
NOOSA FLORA, DEFINE EDGES AND EMPHASISES CONNECTIVITY
TO THE BROADER CONTEXT.

>THE DIFFERING PLANT COMMUNITIES FORM PATTERNS ON THE LANDSCAPE, MIMIOKING THE RHYTHMS OF OCEAN
WHILE CHANGING THROUGH THE SEASONS TO CREATE SPATIAL AND VISUAL VARIETY.

 

 

 

 

 

 

 

 

an

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 62

    

47

tllers Gove

BGS NAL ange

    

- CON

 

 

 

 

 

 

Page 63

Page 64

 

 

 

INALN) Wd LOsd HHO

 

 

 

 

Page 65

Le

  
   
     
    

(Xe RS

ACCESS

  

SOLAR

    

a

perrreres
Ae GUUS eee ae ee

  
   
  

PRES aaue

BS 84 Concept layout design

Page 66

oO
—

The topography of the site has impact on the design concept. with a steep fall form north to south and strong connection with park.
The key design objectives are:
Building to address the street and providing an entry or arrival point for visitors.

To break the mass and built form, providing two buildings out with a strong axes and visual connection between and from fore court and arrival platform, over
recreational facilities and pool area, towards the park.

All apartments to be “ambidextrous”, retaining views to the park but also face within north, providing solar aspect and cross flow ventilation. The apartments
don't turn their back to the community but rather address the streetscape and activate the edges.

JUBW9}EIS JUS]U! JeINOSTIYOIe Z'g

The buildings step down and follow the natural topography of the site.

°

* Building B is anchored through physical connection to the land with combination of “base” and “frame”.

¢ The penthouse or “top” are skilfully introduced into top floor of the building.

* Building A “cantilever” and float over the “park” with the rear connected to the ground with only a 3 storey built form facing the street.

The landscape relates to the built form and is integrated within and around the architecture.

     

Veter Crowe
é CSPOGES I AGREED RESIDENTIALFAPARTMENTS, ]

 

Page 67

 

SYSANOVSN3SYOS GALVOO HAGMOd

 

Wiad,

SN33Y0S WNININN IV

 

‘AQVHSNNS/AOWAlYd,

Ssv1D

 

SAIAVELSNIVE,

TIWM 49014 GNV ALAaYONOO G3Y30NAY

 

‘SVG YO SWVUS.

QuVvO8 G3aYy30NA3y YO SSV1D

 

THUAN LHOIMLHSI1,

WNININATY GALVOOUSAOMOd

 

SONINMY,

ONILABHS WLAN

 

JOO ONILVONS,

 

L

Tivlad daWvus ?
JOOY GNOSYO109

8.3 materials and finishes

N
wo

Page 68

 

8.4 colour samples

oO
-

 

SLNAWLYVAVgIVILNAGISSY 6107

ODED)

WONVE

 

 

 

 

s
OLOH¢ ALIS

 

ssv19

v

dVOTYVONS

   

   

Vdvl 37Enoa

 

é

O1LOHd JLIS
eS SS

HSV 378N0G

 

 

 

 

 

 

 

 

 

L

OLOHd ALIS

 

 

 

 

 

 

 

 

eeeeeoeoeoe0e0e0ee0e0e0@e0e0e@e ee ee eoeeelelelcetlcaelelcel ele 8 ee

Page 69

 

 

 

 

 

od perspectives massing studies

~
3.

a:
o.0

 

t
Ww

Page 70

 

 

 

 

 

 

 

q studies

1

Speaclives Mass

ef pel

SS

 

 

Page 71

fede EE CLONE ISEI NP k ecard

Stee rer eee ee ee re Sayeed

 
 

ca
ay

ny

 

gery

erence imac

ef

lt

«

@©e2e@0200000868088088 0
‘8 iwchifectura

Page 72

adichitecttual reference imagery

57

 

5

 

* [ae Fe ee ANNES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

&

eeeooeoecoeeedcdodoedoedodedsocoedcdco9eoqo0qono0cedcoqoedcgdcdcdedgcde#d

Page 73

  
  

 

 

    

eens er eee
SS Re ney re ee ee Se

 

 

Lad aseiate er ahieae

B architectural reference imagery

Page 74

  

59

aichilectural reference inmvadery

 
 
  

 

ed Sle a lead Sd

Sitters Cove

 

 

 

 

 

 

 

 

 

@eeeeeoeqgeeee@edcgcecodoo0odcedcedc@gedcdcQqoeQqodeoedge@qgdgddadded sd”

Page 75

  
   
   
  

   
 

let, ‘yt
& eye , 3
oor vee at o

: ore
hey + oa ’ ry

 

Page 76

 

SUNM Val

 

 

 

 

 

 

 

 

WYNLOSLIHOHY

Page 77

           

 

 

 

ee HH f
4 MW
7
L f /

 

9.1 lower ground level - site plan

N
oO

Page 78

© 8.2 qround level - site plan

        
 
 
      

 

 
  

    

; e\ ° UA o NS . SM

~* KS “og > .
eS NX a s 5 ™,

Yo \ Ke ab

Page 79

    
   
 
    

NN
NN

/)

z
fa
’ oO
Zz
ao
2 N
a ‘
‘.
‘
‘
aa SN
™ ~
™~,
NN

SERENITY CLOSE

o G3 level 2. site plan

Page 80

L—O 3 si
© Gol level 3 site plan

  

SERENITY CLOSE

@e@e0@00@006006€6€08@8@eeeeee@egeeeeee@e ee ee ée e8 @ 8 6

Page 81

 

& 9.5 teveld — site plan

Page 82

to OG.) survey & building beights detail - site plan

 

 

 

 

c / ? , ; / , f f
Se s , : é i Q ¢ €
APPROX 16,00 0 ABOVE NGL,

ih
73
/
TOP OF STRUCTURE -Ri 23.30

{,

S NHOSY”

TOP OFGTRUCTURE-Rt 26 30
APPROX WkQ0'm ABOVE NG

\ bi

 

I RTL S S : SS S

“ALI
-APRAOX ace 265 .

 

 

 

Hapée Struct
fp
TOP OF STROCTURE-RL 2550

/

SERENITY CLOSE.

!

APPROX 1.50.0 ABOVE NGL

/
3
< &
.

TOP OF STRUCTURE-RU78.00

Akl
=

Sf Toe oF stRuCiunE-AL
APPROX 1290 m ABONE NOL [77

OF STRUCTURE 80H S
AAP RROX 5 739)
~&

ay
< TOP OF $1 "
JF” —~| APPROX 13460 m A

/

re,
J, ;

ix

Wy

/

 

Lf
LD) vg /

,

Page 83

IT IS MORE EXPOSED AND LEGIBLE

ACCESS AND ARRIVAL MOVED TO NORTH
FOR VISITOR ARRIVING AT SITE

  

ALLOW FOR VISUAL AND PEDESTRIAN
CONNECTION TO OPEN SPACE AND PARt

BUILDING FORM REDUCED
TO 2 DETACHED BUILDINGS.

        

,

TO FACE MORE TOWARDS NORTH
INTERNAL LAYOUT AMENDED WITH

PROPOSED BUILDING ROTATED
LIVING AREAS TO FACE NORTH

8 9.9 propased development overlaid with previous existing approval

   
  
         
   

1
SOLES a0

 

™

INDARY
mN

E +2806;
2
ms

Page 84

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mt
ma
i! |
bl
! bit atl E
“UIVIN A
z
I ENS
3 NING KITCHEN
~ 1
+
+

 

UNIT TYPE 2A
SCALE -1:100

INTERNAL BALCONY| TOTAL
160.8 sqm 4.0 sqm| 194.8 sqm

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INTERNAL | TERRACE TOTAL
139.2 sqm| 27.0sqm | 166.2 sqm

 

es
UNIT TYPE 2B
SCALE -1:100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

st
3 ENS. © WIR J IkITCHE!
z sc
ENTRY
1
~ | BATH
| BED 39 BED 2
1
I
+ |

 

UNIT TYPE 3A
SCALE -1:100

INTERNAL BALCONY TOTAL
199.3 sqm 345 sqm| 233.8 sqm

eer os kgs La

SCALE + Hee

    
 

130

 

69

WARY pes pe neds,

Page 85

 

=
=
<

We

oe ge

q

Bt

Bald J

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT TYPE 3B
SCALE -1:100

INTERNAL | BALCONY/S | TOTAL
195.1 sqm| 47.1 sqm| 242.2 sqm

 

 

ate

 

Bet

 

me

 

aH wit

 

@

UNIT TYPE 38-2
SCALE -1:100

INTERNAL | BALCONY] TOTAL
194.9sqm| 469sqm| 241.8 sqm

AB

  
  

 

t = +

ae se if

 

KITCHEN

ett

ant

 

 

 

 

(6 \_UNIT TYPE 38-3
\ ) SCALE -1:100

INTERNAL | BALCONY] TOTAL
194.9sqm | 46.9sqm| 241.8 sqm

eer 3 tgs

SCARE He

Page 86

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

t
( | ) SCALE -1: 100

sm

 

 

  

 

UNIT TYPE 3¢ LOWER

INTERNAL | BALCONY] TOTAL
57.6 sqm 31.2 sqm{ 88.8 sqm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT TYPE 3D

 

 

 

 

 

 

BED 2] BED 3

@

 

INTERNAL | BALCONY | TOTAL

 

SCALE -1:100

223.5sqm| 40.3 sqm | 263.8 sqm

wast

 

x

 

 

 

 

 

 

 

 

 

 

BED 3 [BED 2

QI

 

(10, _ UNIT TYPE 3
Ey, SCALE -1:100

(8 \\_UNIT TYPE 3¢ UPPER
ay, SCALE -1:100

INTERNAL| BALCONY TOTAL
163.3 sqm 11.6 sqm | 174.9 sqm

iS] L'DRY |

Ww
mn

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INTERNAL | BALCONY TOTAL
223.3 sqm 40.3sqm | 263.6 sqm
ast z a
SCALE + HHR¢

 

 

 

 

 

 

 

5

 

74

INOAR] WUN peoilay

Oe

=
3
OS

 

Page 87

 

 

2 GAIT wT ~~

 

 

 

 

 

 

 

am: 1- TS
9- GNOILIIS

 

 

 

 

 

 

 

 

a.9 sactions A-A & B-B

Nw
m

Page 88

Selon ©

ede

o
MN

 

5045,

W130 340) WIdAL

Ob IWS

 

 

ANDAIS¥] ONOTY 301 ONNOYD TYUNL YN

LI
at

 

 

 

 

 

 

 

WOILYAY)XZ
S01NRX]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0521 IS
TIA9T LNIWIS¥O YO TV 130 380)

   

 

      

  

‘SUMO DAEYTOAO fad
(ee un 3a oe 30

SUNT SMPTIAO WG
069.18 AUTO 30

       

mm

ts
on

ed

Page 89

e427,

ee

4y %

soy € 2g see

 

 

005.01 1SS

 

 

1s

 

OO be VIS
3d ¥ SONY 1 13437 CNNOYD YIMO1

“yh 4 Oe ° .
> “ 9 EN °
Bs Ss
7 °
7 “ X °
x “
SO °
?

’ S
4

f 400560155 \‘
“ 100d

  

4 Nip x. y

 

 

 

 

 

 

 

 

 

oO
oO
005 01185 LS
qd q
263 ‘ . , + f <
6101 oe a 5
§ 9
° A Ll
\. . S / q \
O we ‘ \
NS 1 Suv dd) W30NVL LL
/ SwaVddy) &
098 WwW ° Se W aa & j q
° ~ «(AR »\ \ NaWasva
3 . ie CRO Wt : x
; < He * “ ONDYVd LINN A
gor x NY AN a rad ~ ‘ SY
ae o * ‘ ‘ on
oo ° 3 \\ ig ‘ “

6 , ‘
° LX]VIA TARTS

GNNOYD WORX TIAVYL ‘SS
JO HIVd 3181989) )¥

  

9.11 clisabled access

st
N

Page 90

Page 91

unos

you

EVOOSS'

EVOOSC't

 

 

 

BASE a IE le ele Kon b

naam BORE et

elevations

Ole

QL

 

Page 92

 

7?

alummium shutters .
2, rendered masonary - _ e980 _
3. vertical timber detail
4. glass balustracle (clear}
5. stone cladding 11 23.0 level 4
6. colorbond roof | Tess. oo lor Beet Bom fl
7. tinted glass _ _ 1120.0 level 3_
8. composite timber cladding

17.0 level 2

rl 14.0 ground

 

1:250@A3 east

rl 29.0

 

rl 23.0 level 4
rl 20.0 level 3
117.0 level 2

14.0 ground

 

 

1:250@A3 west

19e@ee@euvueeveeeeeveeveeaevneednvneneeenu8ee ee 0800 6 DV.

Sites Cove

PR MES aie)

   

Page 93

 

t61 7 5539 9788
per | £61 7 5539 9760
e [email protected]

DBI Design Pty Ltd ACN 087 951 007
Level 1, 9 Trickett St PO Box 888 Surfers Paradise Queensland 4217 Australia

DBI References

Note: Reference images included in this presentation are
intended for in-house discussions only. DBI Design does not
claim authorship or intend to adopt architectural character.
These images have been sourced from various publications.

 

 

@e@ee0oaee0oae4a4@aeees80d0enge0dsveedeoendeoee8d 80 ee0 @ A.

  

Used in these records

About this file

File size
9.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0175 - Response to information request [As Published].pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.