Original source · versioned page text
SCG 0469 - CD Issue 1 - 14.04.2025
1.61
WM
73
1.
1.39
1.41
89°56'10"
28.768 1.61
up
BM: Nail in Kerb
RL: 1.565
1.55
1.41
1.46
177°08'10"
22.983
2 RESIDENTIAL
22.934
358°33'
SP129049 DEVELOPMENT
8 FFL
1.81
665m²
1.56
1.44
1.39
1.42
1.46
1.55
up
Emt D 1.76
WM
SP129048
1.63
29.335 1.76
1.43
1.47
1.56
269°57'10" 1.62
Emt F WM
WM1.62
IL:-0.32
SP129049
Emt A
SP315577
S MH:
LL2.86
10.10 Roof 9.80 Roof THIS DRAWING AND ASSOCIATED DETAILS
Gutt 9.07
MUST BE READ IN CONJUNCTION WITH
CP THE NOTES CONTAINED ON 0469-CN.
Issue:
SCG HOLDINGS PTY LTD T/A
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 68 669 675 790
Title:
PLUMBING ARTICULATION:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.