                                                                                          2008/746



      In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
11.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
12.   Access to the site for all construction and associated works is to be from Allambie Rise.
      Access to the development site is not permitted from Park Road.
13.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by Council’s CEO or his nominee.
14.   All signage, including that for safety during construction, shall be in accordance with the
      Manual of Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act.
15.   Safe pedestrian access in the vicinity of the project shall be maintained at all times. If footpath
      / road closures are necessary to carry out construction works, Council’s Construction
      Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
16.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing C03/C Council’s CEO, may request further
      controls to be installed should approved measures be inefficient.
17.   Because of the nature of the terrain, the stormwater drainage line shall be inspected by closed
      circuit television (CCTV) at the completion of all works and immediately prior to acceptance
      ‘On Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of
      this inspection.
      A report of the CCTV inspection, including photographic records (which includes photos &
      video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
      approval. Any defects or substandard works shall be recorded and accurately illustrated on
      the drainage plan showing the location of the defect(s).
      Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
      applicants expense with a further CCTV inspection arranged once the rectification works have
      been completed.
      To this extent all CCTV inspections, including any additional inspections necessary following
      defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
      incurred by Council in reviewing the CCTV inspection results shall also be borne by the
      applicant.
18.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
      of satisfactory “As Constructed” records shall be submitted to Council.
      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
      level and type of all services and structures. All of which shall be submitted to Council for
      checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
      are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
      Engineering Design Standards – Roads, Drainage and Earthworks”.
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.


                                                                                       Page 3 of 7

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000746.001 [As Published].pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.