OPERATIONAL MANAGEMENT
AND MAINTENANCE PLAN
Noosa Health Precinct
Eenie Creek Road Noosaville
Prepared By:
MPN CONSULTING PTY LTD
Level 5
39 Sherwood Road
Toowong
Queensland
4066 • Australia
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of sections 2 to 10 (of 31)
Section 2
22 May 2023
REVISION STATUS
MPN Reference No: 7700
Client: Trident Property
Site Address: 36-40 Hofmann Drive, Noosaville
Report Title: Operational Management & Maintenance Plan
DOCUMENT CONTROL
Version Date Author Reviewer Approved RPEQ
Issue A 22/05/2023 Lachlan Lachlan Stephenson 16903
Stephenson
Excellence with Economy in Engineering 1
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 3
22 May 2023
Table of Contents
1 INTRODUCTION 3
2 CONSTRUCTION PHASE 3
3 OPERATIONAL PHASE 4
3.1.1 Bioretention Basin....................................................................................................................................... 4
Table of Tables
Table 1 - General recommended program of inspection and maintenance – Bioretention Basin 5
Table of Appendices
Appendix 1 MPN Plans 6
Appendix 2 Bioretention Basin Construction Checklists and Forms 7
Appendix 3 Bioretention Basin Maintenance Checklist 8
Excellence with Economy in Engineering 2
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 4
22 May 2023 1 INTRODUCTION The following Maintenance Plan addresses the inspection and maintenance procedures to be undertaken for the on-site stormwater quality improvement devices during the construction and operational phases of the project. During the construction phase and maintenance period, the Developer shall be responsible for the monitoring and maintenance of the bioretention basins on site. Thereafter, the site manager shall be responsible for ongoing monitoring and maintenance. All maintenance and amendments necessary to achieve and/or maintain the required treatment performance must be recorded and appropriate steps taken to inform those responsible of any required actions. Layout plans and details of the proposed stormwater quality treatment devices and rainwater tank are attached in Appendix 1. For further details of the development’s stormwater quality treatment devices, refer to the Stormwater Management Plan prepared by MPN Consulting. 2 CONSTRUCTION PHASE Bioretention basin construction shall be undertaken in accordance with the Healthy Waterways Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands Version 1.1 April 2010. Filter media in the bioretention basin is only to be installed once the “Construction” Stage involving the Civil Works required to create the land forms associated with the development and installation of the services. Once this has been completed, the construction of the functional elements of the bioretention basin can be commenced as part of the early landscaping works prior to the “Building Phase” of the development. During the “Building Phase” of the development, a protective layer shall be placed over the filter media. This protective layer consists of a geofabric layer with 25mm topsoil and a turf layer, with silt fences around the boundary of the basin. After completion of the “Building Phase”, the geofabric and turf are to be removed with the filter media reprofiled and planted in accordance with the proposed landscape design. The above protection method is consistent with Option 1 detailed in the Construction and Establishment Guidelines. Bioretention basin construction inspection checklists and sign off forms from the Construction and Establishment Guidelines are attached in Appendix 2. Excellence with Economy in Engineering 3 https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700- 7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 5
22 May 2023
3 OPERATIONAL PHASE
3.1.1 Bioretention Basin
3.1.1.1 General
Vegetation in the bioretention basin plays a key role in maintaining the porosity of the filter media
and a strong healthy growth of vegetation is critical to its performance. The establishment of
plants after the construction phase and ongoing maintenance is therefore a fundamental part of
the operation of the entire device.
Overflow pits require careful monitoring, as these are prone to scour and a build-up of sediment,
debris and gross pollutants. Debris can block outlets and can be unsightly. Inspection and removal
of debris should be undertaken regularly and debris should be removed whenever it is observed
on-site.
3.1.1.2 Maintenance Program
Maintenance of the bioretention basin would involve the following activities:
• Removal of sediment where it is smothering the bioretention basin vegetation;
• Manual removal and management of invasive seeds. Note herbicides should not be used as
they would contaminate the downstream receiving waters;
• Debris removal in the bioretention basin and adjoining areas;
• Repair any damage to the profile as a result of scour, rill erosion or vehicle damage by
replacement of appropriate fill (to match onsite soil) and revegetation;
• Till the bioretention basin surface, or remove the surface layer, if there is evidence of
clogging;
• Regularly water the basin vegetation until plants are established and actively growing;
• Fertilising of plants with environmentally friendly products;
• Removal of plants that have died and replacement with plants of equivalent size and
species as detailed in the Landscape Architect’s planting schedule;
• Pruning to remove dead or diseased vegetation material and to stimulate growth;
• Vegetation pest monitoring and control; and
• Inspection and repair of the subsoil drainage system.
Table 1 below sets out the recommended frequency for inspections and maintenance of
bioretention basins during the Operational Phase. Note the Schedule is a guideline only. Routine
clean out and maintenance should be scheduled based on the outcome of routine inspections.
Excellence with Economy in Engineering 4
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 6
22 May 2023
Schedule of Site Visits
Purpose of Visit Frequency J F M A M J J A S O N D
Routine Inspection Monthly √ √ √ √ √ √ √ √ √ √ √ √
Annual Inspection Yearly √
Routine Maintenance Twice Yearly √ √
Routine Clean-Out of
Every Two Years √
Sediment
Table 1 - General recommended program of inspection and maintenance – Bioretention Basin
For additional information and guidance on how to undertake maintenance activities, refer to the
Healthy Waterways: Maintaining Vegetated Stormwater Assets Version 1 February 2012.
A bioretention basin inspection and maintenance checklist from the Maintaining Vegetated Assets
Guideline is attached in Appendix 3.
3.1.1.3 Watering
Time of year and the climate will determine the frequency of watering. However, during
establishment, regular watering is essential for plants. Successfully establishing plants is
dependent on the frequency of watering, which in turn is dependent on rainfall, the maturity of the
plant stock and the water-holding capacity of the soil. The following watering program is generally
adequate but should be adjusted to suit site conditions:
• Week 1 – 6 5 visits per week
• Week 7 – 10 3 visits per week
• Week 11 – 12 2 visits per week
In the absence of rain, it is recommended that each plant receives 2.5 – 5.0 litres of water per week
during the first six weeks (40mm of watering per week during establishment).
After the initial four-month period, watering may still be required, particularly during the first
winter or dry period. Watering requirements for healthy vegetation can be determined by ongoing
inspections.
Excellence with Economy in Engineering 5
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 7
22 May 2023
Appendix 1
MPN Plans
Excellence with Economy in Engineering 6
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
Section 8
P
COM
5.4
SW 6
COMP
W
5 .4
5.4
P
COM
COMP
P
SW
P
S
CO
MP
EXISTING
LEGEND PROPOSED
COM 5.8 CO
M
SW
SW COMP W
T
5.2 P PROPERTY BOUNDARY
COM S SW
E
SW COMP MP EASEMENT BOUNDARY
MSPW CO
COMP
P O E
E COM 5.6 COMP C 5.00 CONTOUR 5.00
COMP
SW
MP SW
COMP
S
5.4 W MP BUILDING
CO T
5.2
CO P
COM
MP MP CONCRETE
5.2 CO
E
SW 5.4 SW CO E MP
P MP 5.4 CO EDGE OF BITUMEN
E
COM CO
MP
S MP KERB
SW E CO P
W CO T
P 5.4 C OM KERB AND CHANNEL
COM MP E OMP
COMP
SW
P
OM
CO C
C
SW S 5.2 KERB RAMP
MP
5.2
MP
5.2
E
COM
P JOIN TO EXISTING SUB
COSOIL CO CO T
MP MP
5.2 W
CO
P
DRAIN W COM ROOFWATER CONNECTION RWD
5.0
SW T P
SW S P T P ECOM 5
COM
P
5.4 P COM
W W C OM
5.2 COM CO MPT
MP M STORM WATER STRUCTURE NUMBER HW2/22
CO
SW CO
W
P
5.0
5C.2O S
MP
COM E
C OMP 5.2 P TT P W T MP STORM WATER MAIN
COM REMOVE EXISTINGECO FIELD
5.0
E
SW 5.4 5.4
T
5.4
W W WATER MAIN W
E
S
T
INLET ANDMP
REDUNDANT
5
P
CO
COM
COM E
CO CO S SEWER MAIN S
W
P P
5.2
MP
COM
TT UPSTREAM LINE C
CO
SW MP OM
5
4
T E
EXISTING5. FIELD INLET 5.2S LINE OF SAW CUT
W
5.6
MP
COM
P TT W P LINE OF SAW CUT
5.4
COM
PROPOSED EXTERNAL
E
P W
JOINE NEATLY TO EXISTING
COM
P
TO BE REMOVED TT
C T SUBSOIL DRAIN
KERB OMP
5.6 T E FOOTPATH TO CONNECT INTO
T
W
S T 5.4
P
COM
EXISTING CONCRETE PATH CO CO T TELECOMMUNICATIONS
C OM
W E
5.8 5.6 COM TT P MP W MP
5.0
REMOVE EXISTING NEATLY O/H ELECTRICITY
N
E
. 2 T W
P
S 5 T
16 No
SW
CO
COMP
U/G ELECTRICITY
SW COM E E
5.6 STORMWATER PIPE P
COMP E
E
COM
W
M
B1
TP T
P
5 .4
SW
6.0
6 COMP
PIN NEW MEDIAN ON
TT EXISTING m INTERNAL HYDRAULICS Section 9
W
.25
W
S
5.8
W CU
T
FI1/5
SW
EXTERNAL STORMWATER CO
COM
COMP 5.8 TP W BOLLARDS L 5 B1 B1 W CO
EXISTING STORMWATER
SW EXISTING SLAB REFER DETAIL O F SA COM
TT P R 5.2
LINE CONNECTION POINT MP MP
LINE TO BE
W COMP SW
5.2
COMP
CO
6
JOIN NEATLY TO EXISTING DWG No CP.2.01 COM S T
(COMPILED DATA)
E
W
MP
COMP REMOVED m RECONSTRUCT STRUCTURE ALL
P
.20
TT W 5.4
6.0 T
W
KERB 5.8 S TT E
5 CO EXISTING WATER
COMP
COM TW E B1 5.6 RL MH7/1 T MP W COM COMP W
5.4
RE
6
S TT PW E B1 X IL 4.75SW
X 0 X X
SW
X SW
X X
SW
X IL
SW4.630 SW
X X X SW
X X
SW
300Ø
XSW
X SW
X X
SW
X SW
X IL 4.45
X
SW0 X 4.6 5.0 COM P (COMPILED DATA)
T W
RL 4.8
E P T 5.0
COMP
X LL 4.6
6.0
4.8
B2 EXISTING SEWER
5.6
5.
T A
SW
E X
COMPW
21m RET
W
CO W
S X 5.4 4.4
T MP COMP S
SW
T W E 5.2 COM (COMPILED DATA)
COMP
X ET
5.8 COMP S S S S S S WAL 4.8 P
8/1 L
X R
5.0
TT S
EX. HW
5.6
W E
SW PROPOSED EASEMENT
S S S
4.6
S S
MH6/1
EXISTING STRUTURE TO T W X 5.6
S E
TT X S RET 4.4 EXISTING ELECTRICITY
COMP
E LL
COMP T X S
BOUNDARY S S WA COMP COMP E
BE REMOVED REFER T W
E 5.8 S S
5.8 OMP
S T E X5.8 X X B2 S S S 5.6 S WSA
5.2
RELTL RET (COMPILED DATA)
LANDSCAPE ARCHITECT C
COMP T W S S 5 S 5.0
S RET 55..20 4.8 4.6 S
E 5.8 4.8
S T T W S S S DETENTION TANK 4.4 RET WALL RETAINING WALL RET WALL
S
4.8
E
S EXISTING EASEMENT PROVIDE SCOUR PROTECTION WRAET
5.8
DRAWINGS
6.0
COMP
6.0 COMP TW
S S S LL
S
E
ONE. REFER TO WALL WRAELTL PRECAST PANEL WALL
4.8
T TT W
S
COMP
S S TT E 5.6 AT HEADWALL OUTLET REFER RET
COMP T TT W W E PROPOSED SW.2.01 FOR DETAILS DWG SW.2.02 FOR DETAILS.
T W TT W
TWS 5.8
5.0 TOP OF BATTER
B2
E
0m BOUNDARY 5.4
5.6
E
SWW
S E FACE OF BATTER
SL
S
E
EXISTING FIELD INLET 150 HEAVY DUTY 5.2
S
FI1/3 5.4
GRATED DRAIN WITH TOE OF BATTER
5.8
TO BE REMOVED
WALL
5.8 GD1/9 150Ø OUTLET INTO SWALE DRAIN
FI3/7
5.6
FI2/7 5.8BIO BASIN
SWW
5.6 EXISTING STORMWATER
SL
S
5.8 B2
B1
X X X
5.6
SL 5.60m TO BE REMOVED
RET
TK4/7
5m
5.8 CONCRETE
USE FABRICATED BEND
SWW
5.8
DOWNTURN WITH
S
5.8
FOR RETAINING WALL DETAIL ER1 PUMP GENERATOR GUARD RAIL REFER
WALL
5.4
BIORETENTION
ROOMBASIN 2 5.6
REFER DWG No CP.2.01 m WITH 2m² OF FILTER AREA. CP.2.01 FOR DETAILS
5 .65 LOW FLOW ROOFWATER
SL
5.8
MSB REFER TO SW.2.01 FOR
MAJOR FLOW
REFER HYDRAULIB GD3/6 TNK5/1
5.8
EOT
RET
DETAILS.
FACILITIES
DRAWINGS ROOFWATER
PLANTER BOX REFER DETENTION TANK
CONNECTION TO
STRUCTURAL
TENANCY 2 DWG FOR TWO. REFER TO
600 x 600 GRATED FI1/7 DETENTION TANK COMMS VACUUM
WALL
FI2/6 DETAILS
RET
PLANT
RET
SW.2.01 FOR DETAILS
5.8
WALL
WALL
OUTLET PIT TENANCY 1
5.8
6.2 TRANSITION FROM
6
0 5 10 12.5
UPRIGHT KERB TO MAJOR FLOW
BIORETENTION BASIN 1 WITH
RET
WALL
WALL
SL 5.60 FLUSH KERB OVER STAIR CONNECTION TO ROOFWATER
m
RET
RET
100m² OF FILTER AREA. REFER PUMP ROOM FSL 5.80m SCALE 1:250 (A1) 1:500 (A3)
2m LONG STRIP 1.0m CONNECTION TO
TO SW.2.01 FOR DETAILS.
DETENTION TANK
BIO FILTER
DRAIN WITH 150Ø
SL 5.65m
WALL
225 WIDE HEELSAFE CONSULTANT: MPN CONSULTING PTY LTD
RET
RET
WALL
WALL
PVC PIPE CONNECT
TO FI2/7
TRENCH GRATE CONTACT: LACHLAN STEPHENSON
FALLING CENTRALLY (RPEQ Section 10
16903)
PROPOSED SOUTH BUILDING
WALL
RET
WALL
6.4
RET
RET
FALL FOOTPATH TOWARDS TENANCY 3 FOR PRECAST PANEL WALL TELEPHONE: (07) 3335 4595
BIO RETAINING WALL 1% PROPOSED NORTH BUILDING GROUND FSL 5.70m DETAIL REFER
WALL
STRUCTURAL DRAWINGS 06.04.23
CO GROUND FSL 5.80m LEVEL 1 FSL 10.07m DATE
SL 5.65m
LEVEL 1 FSL 10.07m
RET
PROVIDE SCOUR PROTECTION
FI1/6 END1/2 NOTES:
5.8
AT HEADWALL OUTLET REFER .4 2m HIGH FLOW ROOFWATER
W9
WALL
LOW FLOW ROOFWATER DWG SW.2.02 FOR DETAILS. CONNECTION 300 DIA.IL 4.97 1. KERB TO BE IN ACCORDANCE WITH NOOSA SHIRE COUNCIL
TO
REFER HYDRAULIC STANDARD DRAWING RS-080. D 07.06.23 FOR APPROVAL DG LS
DRAWINGS TO
W END1/1 FI3/1 2. FOOTPATH TO BE IN ACCORDANCE WITH NOOSA SHIRE
C 9.05.23 FOR APPROVAL DG LS
9.4
RET
2m COUNCIL STANDARD DRAWING RS-065.
MH2/1 FI4/1
5.8
6.2
3. KERB RAMPS ARE TO BE IN ACCORDANCE WITH NOOSA SHIRE B 21.04.23 BA ISSUE DG LS
TO
8m
6.0
6.6
FOR RETAINING WALL COUNCIL STANDARD DRAWING NSD-9006E.
5.7 A
6.4
06.04.23 PRELIMINARY ISSUE BT LS
W
SL 2 m
6.4
DETAIL REFER DETAIL DWG 9.4
9.4
HIGH FLOW 4. SUBSOIL DRAIN CLEAN OUTS ARE TO CONSTRUCTED IN ISSUE DATE AMENDMENT BY APP
W
2m
6.6
CP.2.01 TO ROOFWATER ACCORDANCE WITH NOOSA SHIRE COUNCIL STANDARD
6.0 GROUND LEVEL FIELD DRAWING SD1116, AND PLACED AT 60m MAXIMUM CENTRES. COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED
CONNECTION INLET TO CAPTURE HIGH FLOW ROOFWATER
WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION OF MPN
6.8
6.0
300 DIA IL 5.02 5.8 5.8 5. ALL STORMWATER GULLY PITS SHALL BE IN ACCORDANCE CONSULTING PTY LIMITED 2018 ©
6.2
VOID RAINFALL CONNECTION FOR LEVEL 1 WITH NOOSA SHIRE COUNCIL STANDARD DRAWING DS-060.
6.6
CARPARK U.N.O.
6. ALL STORMWATER MANHOLES SHALL BE IN ACCORDANCE
FOR PRECAST PANEL WALL PLANTER BOX REFER WITH NOOSA SHIRE COUNCIL STANDARD DRAWING DS-010 ABN: 39 062 191 799 P: 61 7 3335 4555
DETAIL REFER FOR INACCESSIBLE VOID 39 Sherwood Road, Toowong, Qld, 4066 E: [email protected]
STRUCTURAL DWG FOR U.N.O.
STRUCTURAL DRAWINGS PERIMETER RETAINING
DETAILS 7. CONTRACTOR TO ENSURE ALL RETAINING WALL AGG DRAINS CLIENT:
WALLS REFER
NOT FOR CONSTRUCTION
TO BE CONNECTED TO THE CLOSEST STORMWATER PIT.
6.8
STRUCTURAL DRAWINGS
8. ALL DOCUMENTED STORMWATER PIPES HAVE BEEN TRIDENT GROUP HOLDINGS PTY LTD
5.8
DESIGNED FOR OPERATIONAL LOADS ONLY. CONTRACTOR TO
6.8 6.0 6.4 6.0
PROTECT STORMWATER INFRASTRUCTURE FROM HOFMANN DRIVE
6.2
6.4
CONSTRUCTION LOADS. NOOSA HEALTH PRECINCT
6.6
6.4
6.8
6.2
7 9. CONTRACTOR TO CONFIRM EXISTING SERVICE
7.0 7.0 HOFMANN DRIVE, NOOSAVILLE
7.2 7
INFRASTRUCTURE LEVEL AND LOCATION PRIOR TO
QLD 4566
7.2
CONSTRUCTION.
7.6 7.4
6.2
6.8 6.6
7.4 6
7.8
10. CONTRACTOR TO CONFIRM THE LEVEL AND LOCATION OF ALL
7 6.6 6.0 6.4
CONNECTIONS PRIOR TO LAYING ANY UPSTREAM CIVIL WORKS PLAN
STORMWATER PIPES.
FOR KERB UPSTAND
DETAIL REFER DESIGN: BT DRAWN: BT SCALES: AS SHOWN
STRUCTURAL DRAWINGS FOR PRECAST PANEL WALL APPRD: LS
CHKD: LS DATE: APR '23
DETAIL REFER
STRUCTURAL DRAWINGS mpn JOB DRAWING No. REV
7700 CP.1.01 D
FOR APPROVAL