Skip to the record
Beware of cheap imitations.

Original source · versioned page text

22-05-23 Operational Management and Maintenance Plan_Issue A

of 31

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

BIORETENTION SYSTEM CONSTRUCTION & ESTABLISHMENT SIGN-OFF FORMS

Asset |.D.

System location:

DANo.

ee

 

Civil drawing no.

Landscape drawing no.

Area: Catchment Area (ha):

 

Bioretention Area (ha):

 

ROLE/STAKEHOLDER COMPANY

 

CONTACT NAME CONTACT DETAILS

 

 

Developer

Site superintendent (civil)

 

 

Site superintendent
(landscape)

 

Bioretention designer

 

Civil engineer

 

Landscape architect

 

Civil contractor

 

Landscape contractor

 

Council compliance officer

CHECKLIST OF SIGN-OFF FORMS

SIGN-OFF FORM DATE COMPLETED

NAME OF
SIGNATORY & ROLE SIGNATURE
(E.G. SUPERINTENDENT)

 

Pre-Start Meeting

 

Form A — Earthworks &
Functional Structures

 

Form B — Under-Drainage

Form C — Bioretention Media

Form D — Finished Levels

Form E — Coarse Sediment
Forebay

Form F — Protective
Measures

Form G — Landscape
Installation

Form H — Landscape
Establishment

 

 

 

elines € Walel bygesign 109

 
Log in to download the original file

22-05-23 Operational Management and Maintenance Plan_Issue A.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.