Original source · versioned page text
22-05-23 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
Original PDF page 29, section 1. The text section number identifies this passage in the reader.
22 May 2023
BIORETENTION BASIN MAINTENANCE CHECKLIST
Inspection Frequency 1 to 6 Monthly Date of Inspection
Location
Description
Asset ID
Site Visit by
Inspection Items Y N Actions Required (Details)
Sediment accumulation at inflow points?
Litter within basin?
Erosion at inlet or other key structures?
Traffic damage present?
Evidence of waste dumping?
Vegetation condition satisfactory (health,
weeds etc)?
Watering of vegetation required?
Replanting required?
Mowing required?
Clogging of drainage points (sediment or
debris)?
Evidence of ponding?
Damage/Vandalism to structures present?
Surface clogging visible?
Filling of surface required?
Drainage System inspected?
Resetting of system required?
Excellence with Economy in Engineering 9
https://mpncnetau.sharepoint.com/sites/administration/shared documents/7000-7999/7700-
7799/7700/reports/22-05-23 operational management and maintenance plan_issue a.docx`
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.