Original source · versioned page text
22-05-23 Operational Management and Maintenance Plan_Issue A
Plans and drawings: the text below has words only, no drawings.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
P
COM
5.4
SW 6
COMP
W
5 .4
5.4
P
COM
COMP
P
SW
P
S
CO
MP
EXISTING
LEGEND PROPOSED
COM 5.8 CO
M
SW
SW COMP W
T
5.2 P PROPERTY BOUNDARY
COM S SW
E
SW COMP MP EASEMENT BOUNDARY
MSPW CO
COMP
P O E
E COM 5.6 COMP C 5.00 CONTOUR 5.00
COMP
SW
MP SW
COMP
S
5.4 W MP BUILDING
CO T
5.2
CO P
COM
MP MP CONCRETE
5.2 CO
E
SW 5.4 SW CO E MP
P MP 5.4 CO EDGE OF BITUMEN
E
COM CO
MP
S MP KERB
SW E CO P
W CO T
P 5.4 C OM KERB AND CHANNEL
COM MP E OMP
COMP
SW
P
OM
CO C
C
SW S 5.2 KERB RAMP
MP
5.2
MP
5.2
E
COM
P JOIN TO EXISTING SUB
COSOIL CO CO T
MP MP
5.2 W
CO
P
DRAIN W COM ROOFWATER CONNECTION RWD
5.0
SW T P
SW S P T P ECOM 5
COM
P
5.4 P COM
W W C OM
5.2 COM CO MPT
MP M STORM WATER STRUCTURE NUMBER HW2/22
CO
SW CO
W
P
5.0
5C.2O S
MP
COM E
C OMP 5.2 P TT P W T MP STORM WATER MAIN
COM REMOVE EXISTINGECO FIELD
5.0
E
SW 5.4 5.4
T
5.4
W W WATER MAIN W
E
S
T
INLET ANDMP
REDUNDANT
5
P
CO
COM
COM E
CO CO S SEWER MAIN S
W
P P
5.2
MP
COM
TT UPSTREAM LINE C
CO
SW MP OM
5
4
T E
EXISTING5. FIELD INLET 5.2S LINE OF SAW CUT
W
5.6
MP
COM
P TT W P LINE OF SAW CUT
5.4
COM
PROPOSED EXTERNAL
E
P W
JOINE NEATLY TO EXISTING
COM
P
TO BE REMOVED TT
C T SUBSOIL DRAIN
KERB OMP
5.6 T E FOOTPATH TO CONNECT INTO
T
W
S T 5.4
P
COM
EXISTING CONCRETE PATH CO CO T TELECOMMUNICATIONS
C OM
W E
5.8 5.6 COM TT P MP W MP
5.0
REMOVE EXISTING NEATLY O/H ELECTRICITY
N
E
. 2 T W
P
S 5 T
16 No
SW
CO
COMP
U/G ELECTRICITY
SW COM E E
5.6 STORMWATER PIPE P
COMP E
E
COM
W
M
B1
TP T
P
5 .4
SW
6.0
6 COMP
PIN NEW MEDIAN ON
TT EXISTING m INTERNAL HYDRAULICS See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.