Original source · versioned page text
Approved Document OPW18-0342.01 Environment Management Plan Stage 2_Grasstree Court July 2021 (1)
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFIGURE B2 [OCR of page images] gths are in Metres. rou . Level Datum Locality — g E Project AHD (derived) NOOSA HEADS OWTN)CGS || sunrise Beach RL & AC Project [HorzortalDatum/Werision [Scare (aa) | Surveyor brafea PI MGA 1:1000_| HG BJ Surveyors - anners - . cep pe Horizontal Co Ordinate System | Date Surveyed Date Drafted Development Consultants Staking for rehabilitation areas T/ & 72 ARBITRARY 21/11/2018 | 26/11/2018 1 in part of Lot | on SP239726 Level Origi Sunshine Coast * Toowoomba * Western Downs evel Origin www.downes.com.au A.C.N. 010 841 639 OPM 138558 FIGURE B2 RL 15.009m
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.