Skip to the record
Every meeting, every word.

Council archive · source document

Approved Plans - MCU22/0196 & OPW22/0295

of 20

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (11.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

     Notes:
     - Place the rootball on a firm base.
     - Thoroughly water the root ball immediately after planting.                                                               Notes:                                                                                                           Notes:
     - Cultivate sides of excavated hole 50mm deep.                                                                             - Place the rootball on a firm base.                                                                             - Place the rootball on a firmed base to achieve required FSL.
     - Do not disturb kerb, road pavement or road side drainage works.                                                          - Thoroughly water the root ball immediately after planting.                                                     - Thoroughly water the root ball immediately after planting.
     - Tease out roots on side of rootball when planting.                                                                       - Cultivate sides of excavated hole 50mm deep.                                                                   - Number of stakes will vary with pot size. Refer plant schedule.
     - Ensure top of rootball is not buried; expose and set flush with finished level.                                          - Do not disturb kerb, road pavement or road side drainage works.                                                - Cultivate sides of excavated hole 50mm.
                                                                                                                                - Tease out roots on side of rootball when planting.
                                                                                           Set soil level at top of             - Ensure top of rootball is not buried; expose and set flush with finished level.
                                                                                           rootball (at flare of trunk)

                                                                                           Pull away mulch
                                                                                           from base of plant
                                                                                                                                                                                                                                                                                                                                                                                                90mm∅ capped slotted pipe
     50x50x2400 HW Timber stake:                                                           Form mulch berm                                                                                                                                       Hardwood Stake:
                                                                                                                                                                                                                                                                                                                                                                                                75mm below top of planter
     Place 600mm into the ground. Do                                                       to the perimeter of                                                                                                                                   25x25x90mm Place 600mm
                                                                                                                                                                                                                                                                                                                                                                                                connected to drainage system
     not place through rootball. Secure                                                    the rootball                                                                                                                                          into the ground. Do not
                                                                                                                                                                                                                                                                                                                                                                                                per Hydraulic Engineer
     with hessian ties by looping in a                                                                                          Hardwood stake: Place 600mm                                                                                      place through rootball.                                                            River stone to
     figure eight pattern.                                                                                                      into the ground. Do not place                                                                                    Secure with ties by looping                                                        top of pipe
                                                                                                                                through rootball. Secure with                                                                                    in a figure eight pattern.                                                                                                                     Mulch
                                                                                                                                ties by looping in a figure eight                                                                                                                                                                                                                               - refer to plans for organic or
                                                                                           Distance to local                                                                                                                                     Mulch: Pull away from                                                                                                                          inorganic locations
     Raise plant 20-30mm above                                                                                                  pattern.
                                                                                           authority                                                                                                                                             base of plant.
     top of kerb.
                                                                                           requirments                          Raise plant 50mm above
                                                                                                                                finished surface level.                                                                                          Form an earthen basin                                                                                                                          Podium soil
     Do not excavate




                                                                                                                                                                                                                                                                                                                                                                             varies
                                                                                                                                Mulch: Pull away from base                                                                                       around base of plant.                                                                                                                          - refer to Specification
     within 50mm of
     edge restraint or                                                                                                          of plant.
     pavement.                                                                                100                               Form an earthen basin                                                                                                                                                                                                                                           Geotextile fabric
                                                                                                     Top of Kerb                around base of plant.
                  FSL                                                                                                                                                                                                                            Topsoil blend
                                                                                                                                                                                                                                                                                                                                                                                                30mm Atlantis drainage cell
                                                                                                                                                                                                                                                 Fertiliser: Do not allow                                                                                                                       or similar approved
                                                                                                                                                                                                                                                 contact with roots.
                          50
                                       300




                                                                                                                                Topsoil blend                                                                                                                                                                                                                                                   Topping slab - If required.
                                                                                                 2




                                                                                                                                                                                                                    min 300
                                                                                                                                                                                                                                                 Water retention additive                                                                                                                       Depth varies to achieve falls
     Topsoil blend             1                                                             1                                                                                                                                                                                                                                                                                                  to drain.
                                                                                                                                Water retention additive
                                   1                                                                                                                                                                                                                                                                                                                                                            Waterproofing and protection
                                                                                                                                Fertiliser: Do not allow                                                        1
     Bio-degradable Geo-fabric                                                                                                                                                                                                                                                                                                                                                                  - to Architect's Specification.
     Water retention
                                                                                                                                fertiliser to come in
                                                                                                                                contact with roots.
                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                        3 140-300mm PLANTING                                                                                                                    Podium / basement slab
                                                                                                                                                                                                                                                     CD-200 1:10@A1, 1:20@A3
     additive                                                                                                                                                                                                                                                                                                                                                                                   - refer Engineer's detail.
                                                                                                                                                                                width (w)
     100mm drainage gravel in                                                                                                   10 - 20mm Drainage gravel
                                                                                                                                                                                  2xw
     heavy or poor draining soils.                                                               Connect drainage gravel                                                                                                                                                                                                                                   4 PODIUM PLANTER
                                                                                                 to back of kerb, subsoil                                                                                                                                                                                                                                CD-200 1:10@A1, 1:20@A3
     Incorporate slow release organic                                                            drainage where
     fertilizer and water retention
     additives to backfill per
                                                                                                 applicable
                                                                                                                                                       2 45-200ltr PLANTING
                                                                                                                                                     CD-200 1:10@A1, 1:20@A3
     Manufacturer's recommendations




                                   1 STREET TREE PLANTING
                               CD-200 1:10@A1, 1:20@A3
                                      All trees to have 100% NATSPEC inspection prior to delivery to site                                                                                                                                                                                                                                                              FSL
                                                                                                                                                                                                                                                                                                          Notes:




                                                                                                                                                                                                                                                                                                                                                                                       (X)
                                                                                                                                                                                                                Notes:
                                                                                                                                                                                                                                                                                                          - All timber to be CCA pressure treated to
                                                                                                                                                                                                                - Thoroughly water the root ball
                                                                                                                                                                                                                                                                                                          AS1604, Hazard 5, rough sawn pine.                                                 Timber edge
     FSL                                                                                                                                                                                                        immediately after planting.
                                                                                                                                                                                                                                                                                                          - All timber edges to be arissed to comply
                                                                        Mulch                                                                                                                                   Marker stake:                                                                             with council standards.
                                                                        - to 100mm depth                                                                                                                        12x12x75mm                                                                                - All timber ends to have one coat of                                              Stakes
                                                                                                                                                                                                                Tree guard                                                                                Cuprinol or equal prior to installation.
                                                                        Soil blend or site topsoil                                                                                                              Form an earthen basin                                                                     - Stakes to be 400mm into ground at max.
                                                                        - to 300mm depth                                                                                                                        around the base of the                                                                    1200mm centres, or as required to obtain                                           Existing/compacted
                                                                                                                                                                                                                plant.                                                                                    smooth curves. Top of stake to finish                                              /subgrade/subase
                                                                                                                                                                                                                Mulch: Pull away from                                                                     20mm below top of timber edge. Where
                                                                                                                                                                                                                base of plant.                                        250                                 timber edges meet at corners provide
                                                                        Cultivated subgrade                                                                           Turf as specified                                                                                                                   double stakes.
                                                                        - to 150mm depth
                                                                                                                                                                                                                                                                                                          - All fixings to be hot dipped galv.




                                                                                                                                                                                                                                                                 25
                                                                                                                                                                      Topsoil                                                                                                                             - Leading edge is to be free of burrs and
                                                                                                                                                                      - to 100mm depth                                                                                                                    splinters.
                                                                                                                                                                                                                Fertiliser: Do not allow
                                                                                                                                                                      Cultivate subgrade                        contact with roots.
                                                                                                                                                                      - to 150mm depth
                         5 GARDEN BED 1 PROFILE                                                                                                                       Existing subgrade                         Topsoil blend
                                                                                                                                                                                                                                                                                                           TIMBER EDGE
                                                                                                                                                                                                                                                                                                                38
                                                                                                                                                                                                                                                                                                                                 STAKES
                                                                                                                                                                                                                                                                                                                                   50
                                                                                                                                                                                                                                                                                                                                             (X) = Height above
                                                                                                                                                                                                                                                                                                                                             finished surface level    FIXINGS
                     CD-200 1:10@A1, 1:20@A3
                                                                                                                                                                                                                Water retention                                                                                                                                           50mm Bugle Headed
                                                                                                                                                                                                                                                                                                                                                 FLUSH
                                                                                                                                                                                                                additive                                                                                                                                                  Batten Screws.




                                                                                                                                                                                                                                                                                                            100
     FSL                                                                                                                                                                                                                                                                                                                                         20mm                     75mm Bugle Headed
                                                                                                                              7 TURF PROFILE                                                                                                                                                                                                                              Batten Screws.
                                                                        Pebble Mulch
                                                                        - to 100mm depth
                                                                                                                            CD-200 1:5@A1, 1:10@A3                                                                            8 TUBESTOCK PLANTING                                                                                               100mm
                                                                                                                                                                                                                                                                                                                                                                          100mm Bugle Headed
                                                                                                                                                                                                                       CD-200 1:10@A1, 1:20@A3                                                                                                   150mm                    Batten screws.
                                                                                                                                                                                                                                                                                                           100x38mm
                                                                        Soil blend or site topsoil
                                                                        - to 300mm depth
                                                                                                                                                                                                                                                                                                                                 50x50mm

                                                                                                                                                                                                                                                                                                                                             9 EDGE TYPE 1
                                                                        Cultivated subgrade                                                                                                                                                                                                                                                CD-200 1:5@A1, 1:10@A3
                                                                        - to 150mm depth                                                                                                                                                                                                                                                          Timber garden edge


                                                                                                                                                                                                                                                                                                                                                                                                         NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                                         APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                                                                                      MCU22/0196 & OPW22/0295
                                                                                                                                                                                                                                                                                                                                                                                                         10 OCTOBER 2023
                         6 GARDEN BED 2 PROFILE
                     CD-200 1:10@A1, 1:20@A3
                                                                                                                                                                                                                                                                            Revision       Date                     Amendment                 Drawn         Checked
                                                                                                                                                                                                                                 APPROVAL ONLY
CONSTRUCTION DETAILS                                                                                                                                                                                                            NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                A       06.23.2023                For Approval                  XL            CS



CD-200                                                                   scale as noted

128-132 Gympie Terrace, Noosaville
JOB NUMBER: 22479                                CLIENT NAME: Craig and Nathan Francis

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans - MCU22_0196 & OPW22_0295.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.