Original source · versioned page text
Attachment I - Flood Assessment
Cooroy Hinterland Park Flood Assessment 7 CONCLUSION Hydrology and Water Management Consulting (HWMC) has completed this flood assessment for the proposed Cooroy Hinterland Park on behalf of Noosa Council. Cooroy Creek flooding is the dominant source of flooding at the site and modelling has demonstrated that care is required to ensure that the design of the park will not increases flood risk on surrounding properties. Modelling has been used to develop several mitigation measures that have successfully reduced offsite flood impacts to an acceptable level. The results of this assessment should inform future design of the park and it is recommended that the final park design configuration be subject to a further assessment to ensure positive flood outcomes are achieved. Further consideration on possible treatment strategies of local stormwater runoff through the site is recommended if the drains are to remain open and accessible to users of the park. Recommendations have been made in relation to managing safety and maintenance risks associated with construction of a park on a site with a low level of flood immunity. J00318R1V1 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Flood Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.