                    Best Practice Erosion And Sediment Control                     Erosion Hazard Assessment Form


                    [3]     If the soils have not been tested for Emerson Class, then adopt a score of 4.

                            REQUIREMENTS:
                            Works proposed on sites containing Emerson Class 1 or 2 soils have a very high
                            pollution potential and must submit a conceptual ESCP to the regulatory authority
                            for review and/or approval (as required by the authority) during planning
                            negotiations.

                            WARNINGS:
                            Class 3 and 5 soils disturbed by cut and fill operations or construction traffic are
                            highly likely to discolour stormwater (i.e. cause turbid runoff). Chemical
                            stabilisation will likely be required if these soils are placed immediately adjacent
                            to a retaining wall. Any disturbed Class 1, 2, 3 and 5 soils that are to be
                            revegetated must be covered with a non-dispersive topsoil as soon as possible
                            (unless otherwise agreed by the regulatory authority).

                            Class 1 and 2 soils are highly likely to discolour (pollute) stormwater if exposed to
                            rainfall or flowing water. Treatment of these soils with gypsum (or other suitable
                            substance) will most likely be required. These soils should not be placed directly
                            behind a retaining wall unless it has been adequately treated (stabilised) or
                            covered with a non-dispersible soil.

                    [4]     The duration of disturbance refers to the total duration of soil exposure to rainfall
                            up until a time when there is at least 70% coverage of all areas of soil.

                            REQUIREMENTS:
                            All land developments with an expected soil disturbance period greater than 6
                            months must submit a conceptual ESCP to the regulatory authority for review
                            and/or approval (as required by the authority) during planning negotiations.

                            COMMENTS:
                            Construction periods greater than 3 months will generally experience at least
                            some significant storm events, independent of the time of year that the
                            construction (soil disturbance) occurs.

                    [5]     REQUIREMENTS:
                            Development proposals with an expected soil disturbance in excess of 1ha must
                            submit a conceptual ESCP to the regulatory authority for review and/or approval
                            (as required by the regulatory authority) during planning negotiations.

                            The area of disturbance refers to the total area of soil exposed to rainfall or dust-
                            producing winds either as a result of:
                              (a) the removal of ground cover vegetation, mulch or sealed surfaces;
                              (b) past land management practices;
                              (c) natural conditions.

                            WARNINGS:
                            A Sediment Basin will usually be required if the disturbed area exceeds 0.25ha
                            (2500m2) within any sub-catchment (i.e. land flowing to one outlet point).

                            COMMENTS:
                            For soil disturbances greater than 0.25ha, the revegetation phase should be
                            staged to minimise the duration for which soils are exposed to wind, rain and
                            concentrated runoff.



                    IECA (Australasia)                           November 2008                            Page 5

Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
Log in to download the original file

SUPERSEDED - Reference Documents - MCU25 0079.pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.