Development Application Part 2 of 2 - Geotech Report and Plans - OPW13/0816

of 28

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                  Plare 8Meod,h",           \~IiI\~~flill!\[liM~~I ~Ii\E
                                                                                     X0030304
                                                                                                                       ,
                                                                                                                             "..;l1kJ
                                                                                                                               .--




                   THIS IS THE FIRST PART OF A
             MULTIPLE PART RECORD

                        ~t\ Part 2---ofL                           -                 -
                                                                                                   [d59lJ’                    [0 ’t~
                                               (Please Circle)


        Application number:                                               O(JvJ l3\ d6\\.LJ.
T:\I&AMIBCS IAM\INFORMATION MANAGEMENlECORDS MANAGEMEi’mControl of RecordslEDRMSlMulti Pan Record Coyer Sheet FIRST PART.d




                                                              Development Counter
                                                                 ",’,.’        Z 1 OCT 2013                ’
                                                                                                                ,.

                                                             ..;:..r -.                                        ’"



                                                             ,.;’, 1j’,
                                                                                                          : i ;~: .~
                                                                                                            .




                                                             ,
                                                                 ,"
                                                                                                           .’ .  ’




                                                                             Tewantin
Full text of the other 27 pages

Page 2

                                                                                                                                 PROCEDURE
                                                                                                                                 1.   INST ALL SCREW PILES
                                                                                                                                 2.   PLACE GEOFABRIC ON CREEK BED
                                       DOLPHIN CRESCENT                                                                          3.   PLACE ROCK      -
                                                                                                                                                          ST AGE ONE
                                                                                                                                 4.   CONSTRUCT CONCRETE REVETMENT WALL

N                                                                                                                                5.
                                                                                                                                 6.
                                                                                                                                      PLACE GEOFABRIC OVER ROCKS
                                                                                                                                      PLACE ROCK      -
                                                                                                                                                          STAGE TWO
                                                                                                                                 7.   BACKFILL BEHIND REVETMENT WALL

                                                                                                                                 ROCK VOLUMES
                                                                       \\                                                        ST AGE 1   -
                                                                                                                                                150 cub.m NOMINAL
                                                                       \\                                                        STAGE 2    -
                                                                                                                                                115 cub.m NOMINAL
                                                                        \\
                                                                        \\                                                       PILES
                                                                         \\
                                                                                                                                 1.   PILES SHALL BE STEEL SCREW PILES COMPL YING WITH AS
                                                                          \\
                                                                          \\                                                          2159-2009
                                                                           \\                                                    2.   PILES SHALL BE SET WITH AN APPROVED TORQUE METER
                                                                           \\                                                    3.   ALL PILES SHALL BE SUPPLIED WITH A WRITTEN GUARANTEE
                                                                            \\
                                                                                                                                      FOR A MINIMUM USEABLE LIFE OF SO YEARS WITH A MINIMUM
                                                                             \\
                                                                                                                                      WORKING SAFE VERTICAL PERMANENT LOAD OF 9.0 TONNES
                                                                            \\~
                                                                            \\
    No. 27                                      No. 25                       \ \ c:;;                No. 23
    LOT 81                                      LOT 80                        Hi                    LOT 79
                                                                              \\~
                                               on N10573                          \\~
                                                                                  \\
                                                                                  \I
                                                                                   \1
                                                                                   \\
                                                                                    \\
                                                                                    \\
                                                                                    \\
                                                                                        \\
                                                                                        1\
                                                                                         \1       3000

                  2000          10200 (NOM.I             1500
                                                                                                                                                                       G&KWHYTE
                                                                   r=                                                                                                  PROPOSED

                          /
                                               //                                                                                                                      OPERATIONAL WORK
                              ////////                                                                          EXISTING
                                                                                                                REVETMENT WALL
                                                                                                                                                                       ADJACENT TO No.25
      ~
      o
      ~
      o
             0

             g
             0-
                         C/f////////
                         ~/ ////////
                          /
                             ////////
                                                                                                                                                                       DOLPHIN CRESCENT
      <>
      <>
      o                  r/r////////                                                                                                                                   NOOSAVILLE
      ....




                         r/[.//////b
                         //v//////
                                                                                                                                                                        .
                                                                                                                                                                        Norden
                                                                                                                                                                                        Engineering
                                                                                                         RECONSTRUCT CONCRETE                                           "IRa
                                                                                                         REVETMENT WALL
                               8000             4100
                                                                                                                                                                           a            structural I CIvIl De8IgR eng......

                                                                                                                                                                                        SUIte 16 ’TewantIn Plaza"
                                                                                                                                                                                        PoIncIana Avenue I PO Box 205
                                                                                                                                                                                        Tewantin Q 4565

                                                                                                                                                                                        Ph:0754497137 Fax:0754497172

                                                                                              \                                                                                         Entail:jl’[email protected]

                          I                                                                                                                                            DRAWN                    DATE


                                               WEYBACREEK                                                                                                                      AGUNN                   OCTOBER 2013


                                                                                                                                                                       SCALE

                                                                                                                                                                               MSHOWN


                                                                                                                                                                       ISSUE
                                                           SITE PLAN
                                                                                                                                                                               WORKI
                                                           1:200
                                                                                                                                                                       ORONO.                                 AMEN


                                                                                                                                                                               J831-01

Page 3

                                                                                                                                                                                                                                            >-
                                                                                                                                                                                                                                            0::
                         No. 25 DOLPHIN CRESCENT        WEYBA CREEK                                                                                                                                                                         <
                                                                                                                                                                                                                                            o
                                                                                                                                                                                                                                            :z
                                                                                                                                                                                                                                            ::>
                                                                                                                                                                                                                                            o
                                                                                                                                                                                                                                            co.



                                                                                                                                                                                                                   150 MIN.

                                                                                                                                                                                                                                                      KEY INTO EXISTING
                                                                                                                                                                                                                                                      REVERBMENT WALL EACH END.
                                                                                                                                                                                                              40 COVER
                                                                                                                                                                                                                                                      COAT INTERFACE WITH BOND
                                                               EXISTING TEMPORARY SPRAyeD
                                                                                                                                                                                                                                                      BREAKER AND SEAL FACES
                                                               CONCRETE EMBANKMENT


                                                                                                                                                                                                                                                      1.60AHD
                                                                                               WATER LEVEL DURING SURVEY (0.200 AHDl



                                                                                                                                                                                                                                .       .



                                                                                                                                                                                                                    .
                                                                                                                                                                                                                                    ’.
                                                                                                                                                                                                                     11
                                                                                                                                                                                                                   j’
                                                                                                                                                                                                                                   9.
                                                                                                                                                                                                                                                     N12@200

                                                                                                                                                                                                                   I :~".’>:                     .   N12@200
                                                                                                                                                                                           eoMPAC’f1!O PILL
                                                                                                                                                                                                                            ":’ 9;
                                                                                                                                                                                                                   .~.   ’..           .’.
                                                                                                                                                                                                                    I.
                                                                                                                                                                                                                            "

                                                                                                                                                                                                                                   ..




                                                                                                                                                                                                                    I.. ...:
                                                                                                                                                                                                                        .
                                                                                                                                                                                                                                            .




                                                                                                                                                                                                                            ’C.’
                                                                                                                                                   ~
                                                                                                                                                   .....
                                                                                                                                                           CLEAN FREE- DRAINING                                      "
                                                                                                                                                                                                                                   .



                                                                                                                                                                                                                                   ’
                                                                                                                                                                                                                                       .-



                                               >-                                                                                                                   AGGREGATE
                                               0::
                                               <.                                                                                                                                                                                                                  DN50 OUTLET DRAIN
                                               o                                                                                                                      GEOFABRIC
                                               2
                                                                                                                                                                  (TERRAFlXSP360                                                                                   AT 3000 MAX CS.
                                               ::>
                                               o                                                                                                                  OR EQUIVALENT)
                                               co

                                               >-
                                               t-
                                               o::
                                               1.&.1’
                                               0-
                                               o
                                                                                                                                                           I
                                               0::                                                                                                         ~
                                                                                                                                  N
                                               0..




                                                                                                                                                   ~

                                                                                                                                                           ~
                                                                                                                                                           ....




                                                                                                                                                                    016x 500 BAR.
                                                                                        SECTION
                                                                                        1:50
                                                                                                         EB         EXISTING                                             TYPICAL
                                                                                                                                                                                                              1000 NOM.




                                                                                                                                                                                                                                                                 SCREWPILES AT 3000 MAX CS.
                                                                                                                                                                                                                                                                 (DESIGNAND CONSTRUCT BY
                                                                                                                                                                                                                                                                 OTHERS)

                         No. 25 DOLPHIN CRESCENT        WEYBA CREEK


                                                                                                                                                                                                                                                         G&KWHYTE
                                                                                                                                                                                                                                                         PROPOSED
                                                                                                                                       1.60 AHD                                                                                                          OPERATIONAL WORK
                                                                                                                                                                                                                                                         ADJACENT TO No.25
                                                                                                                                                                                                                                                         DOLPHIN CRESCENT
                                                                                                                                HAT (0.560 AHDI
                                                                                                                                                                                                                                                         NOOSAVILLE
                                                                                                        WATER LEVEL DURING SURVEY 10.200 AHDI                                       REVETMENT WALL DETAIL
                                                                                                                                                                                    1:20

                                                                                                                                LA T (0.560 AHDI                                                                                                                            Norden
                                                                                                                 ROCK LAYER SHAPE 2
                                                                                                                            -                                                                                                                                               Engineering
SCA.E:W PILES AT 3000 MAX CS.                                                                                        GEOFABRIC.STAGE 2
(OEiSIGNAND CONSTRUCT BY
                 OTHERS)
                                                                                                                                                                                                    CONCRETE                                                                Structural IeMI DesIgn Engineers


                                                                                                                                           1                                                                                                                                Suite 16 ’TewantIn Plaza"
                                                                                                                                                                                           STRENGTH            -
                                                                                                                                                                                                                    40 MPa                                                  Polnclana Avenue I PO Box 205


                                                                                                                                        ~1MAX                                                   SLUMP         -
                                                                                                                                                                                                                   80mm
                                                                                                                                                                                                                                                                            Tewantln Q 4565

                                                                                                                                                                                                                                                                            Ph:0754491137 Fax:0754497172
                                                                                                                                                                                                                                                                            Emall:[email protected]
                                                                GEOFABRIC- STAGE 1

                                                                                                                                                                                                                                                         DRAWN                     DATE
                                               >-
                                               0::              ROCK LAYER.STAGE 1
                                               <                                                                                                                                                                                                                 A.GUNN                   OCTOBER 2013
                                               o
                                               2’
                                               ::>
                                               o                                                                                                                                                                                                         SCALE
                                               co
                                               >-
                                               t-                                                                                                                                                                                                                AS SHOWN
                                               o::
                                               1.&.1
                                               0..
                                                                                        SECTION
                                                                                                         EB         PROPOSED
                                               o                                                                                                                                                                                                         ISSUE
                                               0::
                                               0..
                                                                                        1:50
                                                                                                                                                                                                                                                                 WORKINGDRG
                                                                                                                                                                                                                                                         DMMO.                                   AMENDMENT

                                                                                                                                                                                                                                                                 J831-02

Page 4

    "




"




                        r:: n tt~? J ~’<’H ir::v C,.~
                                ,’# ~’m’! 11, }, ....ox * "’
                        ..;} ""’"1 i!_




        GEOTECHNICAL REPORT              -
                                             REVETMENT WALL FAILURE




                CLIENT:                  G & KWHYTE




                SITE:                    25 DOLPHIN CRESCENT
                                         NOOSAVILLE




                DATE:                    SEPTEMBER,2013




               JOB NO:                   113-15522

Page 5

    ~




~
                                                                                                                                                                                                        Direct’Jts
                        S’li :-:;w’)(~y;;; E’l~iin;~B,jn9 Fty Umiied
                                                                                                                                                                                                        f"’.i Dixon                      qHOI)!;) r-<pu~
                       !-;!::3c:<;;ists in i~{mlied :)n<)t’;~a::-::(:i:                                                                                                                                 ~JTP:);..kil’’::               f<A.\)v)~~("~i!)"::’\!~f~^j. r~r:~""~{:’:",....:.1 ~
                       ..-\....B.N. 7~; {.IS4 04.1 G::
                                                                                                                                                                                                        MVGenJe                          Er.~ (CivU}i,,!8A CPf.r. ~ t,~;E }\tt~i! RPEO
                                                                                                                                                                                                        G       J Gmy
                       v.,-..;..;w.   ${:H~~:;~V0’iS. (":~T:j,I;,



                                                                                                                                                                                                        P Eliiinnl.cn                  8EiCiv!!) fvn= AIl~ RPE(~.

                                                                                                                                                                                                        h:;:~<;. ~i,~~*:;)

                                                                                                                                                                                                        J ka~~s.                       8E/~.:~(H:D::~;) f13:8
        son.StUWfXS                                                                                                                                                                                     CP ~;cE::1$::-,::              8f.=.r::~(C~vi}) RPEQ



            Gold Coast Office
           Job No:     113-15522
           Ref:        1-15522,2013-09-26, LR VER 0
           Author:     Tim Phillips


                                                                                                                                                                                                                                26th September, 2013


           G & KWhyte
           6 Glendower Street
           TOOWOOMBA OLD 4350
           Email:[email protected]

           ATTENTION:                        GRAHAM WHYTE




           Dear Sir,


           RE:    25 DOLPHIN CRESCENT, NOOSAVILLE                                                                                                         -
                                                                                                                                                                  FAILED REVETMENT WALL

           1.0    INTRODUCTION

           This report presents the results of a limited geotechnical investigation carried out
                                                                                             by Soil
           Surveys Engineering Pty Limited at the above site on the 27th August and 24th September,
           2013.


           The investigation was carried out at the request of Noosa Jetty Builders on behalf of Graham
           and Karen Whyte.


           Authorisation to proceed with the investigation was dated 21st August, 2013.


           The objective of this investigation was to assess site and subsurface conditions across the
           Weyba Creek revetment to determine the failure mechanism responsible for the collapse of
           the revetment and retaining walls, jetty and rear deck and to provide remedial options for
           reinstatement, if required, and stabilisation of the revetment profile.

           2.0    SITE HISTORY

           It is understood movement and distress first became apparent about July, 2013 with rotation
           of the jetty supports noted.


           Complete failure and collapse of the jetty, revetment and retaining walls and section of the
           rear timber deck is understood to have taken place in late July/early
                                                                                 August, 2013.

           Temporary stabilisation of the exposed soil batter has since been carried out with a surfac-
           ing of sprayed concrete across the batter face.
                                  H :"~r.,;";:f;t:.                                                  G~,.!d ":::"::!:"~?                                                                                                         ~.j~,.r,:~(":’Y!’: [,:,:;("::’:c,
                                                                                                                                                                  f..::!:".~:;,~":V
                                  !.’~:,."’::: :~’ :~i ::!:’:r;":~,:~ S:’:’:::.;::~                  U::::~, -: ’if: ~Jq:::::~,:.\ :}:’t."                         1 ~::l,l,~ ::’:;~’f’1                                         :.~~i~ -:r:, ~-:.~~ C:::’~;t::c::1;~’~~ ;.:i’~’~;::
                                 :--I~::~;’J:: :’;.::~                                               t-:pj1’p::,’1;l~ G::’J                                       (:.:~,:,-3:::: ,’~:"r::,~ 7i~::                                ’:’;-,,,:;:~:~~ :’:~,~)~;:, s..::;,:~:-: :’~ ""’~.: (.’~-:’;~:’:’
                                  ~)’:’: :!.::"{, :;,~ ’.’>                                          f,’f.~ ~1",:7 :S!’~..:’:;:                                   (,()i?: :., ~,;::~;f,                                          j’:::’.::’,:$!::l
                                  p~~~,::: :t;::::" ~..:::~: .;:’ >:                                 H:,:::~-::::!’~’".!’:d.:~ ’;’ .(~, ~:;kj ~ 212..             f,,~:::.;.::-.:!.’y ~";:~":. Q::: .::’--; :
                                 /:,:.r’::.:’,~::;.~                                                 .....:.:{..~:’;..::;;                                        f~t::~~r.:)::.:-:

                                 ~’;.?’l .:, ’: ’;’ }.:~’f::: ~/;:’;i;                                .’:’: 7:’:? :;=.::;:) :::,~t1;-:                            :"r: :.;~.? ,~ :1~/.’i.’:!’=.:f                                ;-:.r: ~; :(’ ~:{:.:~:~ ~:/. :t:
                                 ):;::x :: n J.-t:!,:;-:’ ~:~if:~}                                   F..) :;V::’ :;:.i!J:~ :,~.~::.’"                             !;:;>.< 61’... .:",,r. :J~:.,’i!;:)                            ):3’’>: i.!:.... !;~:./1; ,:~::~::
                                 ~..;’!-’.,~...:~~::;’ ~A’..!’;;:::.. ::’\’:’:)’~.:~,";I-=-:.:’::$   t~t~k~~’:~~,~~~(~~’::~,iJ:’J:g ,-=- y~.., ~,~,!,~:. .:;1.:                                                                    !’..:-d~e:’:,::,:\!:’::’~~!i;;:;;(~::~::.:: ’..-(~.....~: ~. ~~:,~..~,:
                                                                                                                                                                  f:::.:~’   V:,:y~~{:t-.:,>:!:::;.t:..,~:-~ .....~’:~~ .~~~:    :’:

Page 6

,




                                                    -2-


                                                                                 Job No. 213-15522


     3.0     WALL CONSTRUCTION

     Provided site photographs and site inspections indicated that the revetment wall construction
     comprised a low height cast insitu concrete wall constructed on a short corrugated fibro
     sheet cut off wall. A three course blockwork retaining wall, with soil backfill, to have
                                                                                    appears
     been constructed on the revetment wall at a later date with a timber deck
                                                                                     supported on a
     high level footing system constructed behind the retaining wall.

     4.0     GEOTECHNICAL INVESTIGATION

     Subsurface conditions were assessed with four boreholes carried out from a work
                                                                                      boat,
     using hydraulically driven window sampling equipment and supplemented with Continuous
     Dynamic Cone Penetrometer tests (DCP’s)with three DCP’s carried immediately behind the
     temporary shotcreted revetment batter.

     Borehole depths ranged from 2.0m to 3.0m below existing creek bed levels. DCP tests were
     terminated at near penetration refusal at depths of 1.5m to 3.0m below
                                                                            existing creek bed
     levels and 4.5m to 4.8m below the existing ground levels behind the
                                                                                temporary
                                                                                     revetment
     batter.


    The field investigation, soil classification descriptions and field tests were carried out in
    general accordance with Australian Standards.

    AS 1726-1993             Geotechnical Site Investigation


    AS1289                   Method of Testing Soils for Engineering Purposes


    Notes relating to this report, Borehole Record Sheets, DCP test results and an Aerial
    Photograph/Site Plan detailing the location of boreholes are appended to this report.

    Field work was carried out on the 27th August and 24th September, 2013.


    Water levels were also recorded at varying offsets from the rear of the
                                                                       property to provide a
    general profile of the Weyba Creek bed immediately offset from the failed revetment wall
    location. The results are presented in brackets on the appended Aerial
                                                                             Photograph/Site
    Plan.


       4.1     Subsurface Profile

    The subsurface profile encountered in Boreholes 1, 3 and 4, comprised
                                                                                    very loose sand
    extending to depths of about 1.2 to 1.8m overlying medium dense to dense sand.

    At Borehole 2 location medium dense sands extended to about 1.2m and
                                                                         overlay dense
    conditions. The encountered very loose upper level subsurface profile is
                                                                             generally typical of
    active marine alluvial deposition process.


    DCP’s 5 to 7, located immediately behind the remaining revetment batter, encountered
                                                                                         very
    loose to loose and variable conditions to depths of 1.4m to 2.3m         medium dense to
                                                                        overlying
    dense conditions. The DCP’s were terminated at near penetration refusal in dense strata at
    depths of 4.5m to 4.8m below existing ground surface levels.




                                                    -;;: SOIL SURVEYS ENGINEERING PTY LIMITED
    1-15522,2013-09-20, LR VER 0

Page 7

,




                                                    -   3   -




                                                                                  Job No. 213-15522


     5.0    FAILURE MECHANISMS

     Review of historic aerial  photographs of the Weyba Creek at the rear of the property
     indicates continual changing of the creek bed profile with significant
                                                                            scouring and sediment
     deposition along the creek frontage of No. 25 Dolphin Crescent and the adjacent properties
     to the immediate north.


     Deep holes appear to have been scoured immediately behind several of the properties,
     including No. 25 Dolphin Crescent.

     Based on the results of the field investigation, historic records and site
                                                                               photographs provided
     to aid this investigation, we advise that the failure mechanism
                                                                       responsible for the collapse of
     the revetment and retaining walls. jetty and outside edge of the deck is considered to be loss
     of foundation support.


     This loss of foundation support has been brought about by
                                                                   scouring of the Weyba Creek bed
     immediately adjacent to the revetment wall.

     The failure mechanism has also been       exacerbated. to varying degrees, by the addition
    surcharge of a retaining wall constructed on top of the revetment wall. backfilling behind the
    retaining wall, surcharging the backfill with high level footings supporting the timber deck,
    and possible build up of hydrostatic pressure behind the walls due to lack or absence of a
    subsurface drainage system.


    6.0    REMEDIAL CONSIDERATIONS

    We advise that unless significant and adequate measures to inhibit further
                                                                               scouring of the
    immediate creek bed and revetment batter are actioned. erosion and           of the rear of
                                                                            slumping
    the property would be expected to continue and would        place the residence in peril, ie. the
    revetment batter is currently about 2.Om to 3.4m off set from the rear of the residence.


    It is considered that a number of options to stabilise the revetment wall        area   available.
    including the reconstruction of the revetment wall (which would involve the reclamation of
    the scoured zone) or the mass rock stabilisation of the site (which could result in a loss of
    some yard area).



           6.1.1     Reinstatement of Revetment and Retaining Walls          (6P It AI i’)
                                                                                     0



    If replacement of the revetment/retaining wall is adopted, it is recommended a
                                                                                     piled footing
    system be adopted for the support of the wall, with piles founded not less than 1.5m into the
    dense or better sand strata indicated beyond about 4.4m to 4.7m
                                                                           depth below existing
    ground levels immediately behind the remaining revetment batter. Deeper piles may be
    required for load capacities depending on the final wall design.

    Cased. jetted. cast insitu concrete piles or steel screw piles would be considered the most
    appropriate piling systems for the site conditions encountered and access restrictions
    imposed. However. it is recommended piling contractors be consulted for further advice as
    to the most appropriate system for this site. Reinstatement of the
                                                                       jetty structure, if proposed,
    could also be considered using a similar piling system with appropriate
                                                                                 bracing to ensure
    adequate lateral stability is maintained.




                                                   "#-SOIL SURVEYS ENGINEERING PTY LIMITED
    1.15522,2013-09.20, LR VER 0

Page 8

                                                -4-


                                                                                   Job No. 213-15522
                                                                               ,


 For design purposes, geotechnical design strengths
                                                         (Rct,g) of 500kPa in end bcc:-:r.g C~~
 40kPa in lateral capacity would be available at not less than .5m embedment into dense. or
 better, sand strata. Uplift resistance parameters can be provided once a piling system has
 been considered.


 The use of raked piles could also be considered for additional lateral
                                                                              capacity. Buttressing
 revetment rock against the revetment wall, to at least HAT levei, would also contribute to the
 passive resistance of the wall, however, it is not recommended the                passive resistance
 afforded by the revetment rock be considered in the wall design.


 A working platform would be required for the installation of
                                                               piles and construction of a
 suspended footing system to support the replacement revetment/retaining wall.

 Options to provide a suitable construction pad include reinstating the revetment batter with
 clean sand utilising a berm of revetment rock placed along the creek
                                                                            frontage
                                                                               to         the
                                                                                          support
 sand backfill. Refer Option 1 I Figures 1A and 1B.


 It is recommended clean sand be used as wall backfill with a
                                                              drainage layer comprising not
 less than a 300mm width of 20mm clean, free draining aggregate encased in a             ie.
                                                                                  geofabric,
Terrafix SP360 or similar, placed      immediately behind the wall and to within 300mm of the
 backfill surface. Refer Figure 1 C.


It is essential the wall be constructed with adequate drainage holes to ensure efficient and
long term drainage of the wall backfill. However, it is recommended the replacement wall be
designed for full height hydrostatic pressure.

The following retaining wall soil design parameters are recommended for the
                                                                                         replacement
wall.


        Backfill Unit Weight                                   18kN/m3


        Earth Pressure Co-Efficient-Active (Ka)0.36 (280internal friction
                                                                            angle)

It is suggested piling works be carried prior to stabilising the creek bed and revetment batter
with rock protection in order to inhibit possible impediments to piling works.             it is
                                                                                       However,
essential the stabilisation works proceed promptly to inhibit further
                                                                        degradation of the revet-
ment profile, which is currently encroaching to within 2.0m of the residence, and
                                                                                            possible
loss of foundation support at the rear of the residence.




                                                ’#SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0

Page 9

                                                                           .5.


                                                                                                          Job No. 213.15522


    /                                                                                           NOT TO SCALE        ~
  ( ’"Existing                 Residence                                                                             I
  I   ~                                                                                                              I
                                           (jfigir:E!i ;;viilii ,.inI"
  I    I       ,/                                                                                                    I
  I ~f"                                         .
                                                                                                                     I
  I                                                                                                                  I
                                    ~.~iJ~~ I
                                          Revetment tod<                        1f
                                                                                       Existing Scoured Profile
                                          to create berrn                 /
                                                                         /
                                                                 Geofabric




             Figure 1A             -
                                       Rock Berm




                                                                                               NOT TO SCALE




                                          Original Wal: Line

                                       /
                                            #1’"
                                                                                                             sz
        A{id sanG or
        tevettnent r’,,).ch
        iO create 3

        \)!atform
                      vv’ryrking        ’~~
                                         Rev~t,n~nt n.lck                     !
                                                                                      Existing Scoured Profile
                                         to create berm
                                                                         //
                                                               Gt!:ori:t r!(;




         Figure 1B            -    Foundation Replacement




                                                                          -;11, SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0

Page 10

                                                                                   -
                                                                                       6   -




                                                                                                                                       Job No. 213-15522


   /                                                                                                                        NOT TO SCALf:        ~
 ( ""         Existing Residence                                                                                                                      I
 I                                                                v\;ai; Line
                                                                                                                                                      I
 I   I   //0riginai                ;
                                                                                                                                                      I
 I ~   MII~
                                                    New Revetment Wall

                                                                                                                                                      I
      20mm aggregate/
                               .




 I        ~;gt),"".,
      encased in geofabric
                                       "..




                                       o..;:.\.~"..-x:-.x,~....
                                                                                                                                            sz
                                                                                                                                                      I
                                       "Z~~~,-~",,-_                                                                                                  I
                                                                                                                   Exlstllg S   i’ Pf fil




              Piled Foundations
              (minimum 1,5m into dense sand)

         Figure 1 C Wall Construction
                        -




                                                                                                                           NOT TO SCALE




                                              Original VIIal; Lino

                               /
                               .

                                                  New Revetment Wall
                                       ~


                                                                           Rock                                 with geofabric under
                                                                                  (Orthickness)   4
                                                                                       ;:;::::::::::]1
                                                                                       ,.   ~’’!’"<t~~v   ’,.




                                                                                                                  Existing Scoured Profile




             Piled Foundations
             (minimum 1,5m into dense sand)

        Figure 10      Ii   Rock Protection




                                                                                  __ SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0

Page 11

                                                               -7-


                                                                                                    Job No. 213-15522


        6.1.2       Revetment Stabilisation                (~P       ILO r-I   2...)
 It is essential relevant authorities be consulted regarding the stabilisation measures recom-
 mended in this report as the recommended remedial works extend into the Weyba Creek.


 We also advise that stabilising the creek frontage of No. 25 Dolphin Crescent
                                                                            may adversely
impact on adjacent waterfront properties due to possible/probable changing water flows
around the rock protection and this must be considered prior to remedial works. It was also
bouqht to our attention that immediate adjacent properties have also experienced the
adverse effects of scouring in Weyba Creek, however, the extent of damage or remedial
works undertaken was not assessed as part of this investigation program.


 It is recommended the Weyba Creek bed revetment frontage at no. 25 Dolphin Crescent be
stabilised by the creation of a working platform of sand (where piles are required) and revet-
ment rock at a temporary 2H:1V profile). A surficial capping of revetment rock, on a
                                                                                     geofab-
ric should be placed. The revetment rock, typically well graded sound rock of nominally
+75mm, -300mm
                  grading, at least 500mm minimum thickness, placed over a geofabric
layer, ie. Elcomax 600R, or similar, and extending from at least Highest Astronomical Tide
(HAT)level on the replacement revetment wall, or to platform level if a replacement wall is
not proposed, and extended into the Weyba Creek to the invert level of the adjacent scoured
creek bed. Figures indicate schematic recommended rectification profiles.


                                                          Option 2


     /                                                                                   NOT TO SCALE
                                                                                                           .
                                                                                                               ~
 ( ~          Existing Residence                                                                                  )
 I      ~f<-’
                I               ,/
                                   rigJna: 0,i’ai; Line
                                                                                                                  I
                        ~                                                                                         I
                         \            ~

                          ~".---==:
                             :                                 1!               Existing Scoured Profile
                             ,                              I
                                                           I

                                                          I
                                                   G<!.;()fabnc




        Figure 2




                                                               ’#,SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522, 2013-09-20, LR VER 0

Page 12

                                            -   8-


                                                                         Job No. 213-15522


 7.0    LIMITATIONS

 We have prepared this report for the use of G & K WHYTE for design
                                                                          purposes in accor-
 dance withgenerally accepted geotechnical engineering practices. No other warranty,
expressed or implied, is made as to the professional advice included in this report. This
reoort has not been oreoared for use bv oarties other than G & K WHYTE.           It may not
contain sufficient information for purposes of other parties or for other uses.


Soil Surveys Engineering consider that a documentation review service (during the design
phase and prior to construction) to verify that the intent of geotechnical recommendations is
properly reflected in the design, along with construction inspections, forms a very important
component of the geotechnical engineering design service/process.


This statement is not intended to reduce the level of responsibility accepted by Soil Surveys
Engineering in accordance with our commission, but rather to ensure that all parties who
may rely on this report are aware of the responsibilities each assumes in doing so and the
risks they accept should they decline to have Soil Surveys Engineering carry out a geotech-
nical documentation review and geotechnical construction inspections.


The    geotechnical review ensures geotechnical risks to our Client and their project are
minimised at the design and tender stage of the project. Further, with Soil Surveys Engineer-
ing being commissioned to carry out geotechnical construction inspections, an opportunity at
the time of construction to confirm any assumptions made in the preparation of the report
and allow the effect of any normally occurring variation in ground conditions to be assessed
with respect to construction becomes available.




                                             ~SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0

Page 13

                                                             -9-


                                                                                       Job No. 213-15522


 It is highly recommended that the Client avail themselves of these review and inspection
services; our standard rates will apply.


Yours faithfully,




    .   i7-,"b~/~ ....-
  ./:/7///r?/
 /’



T. PHILLIPS




        .
            ’’’-",.."-_.._’’’’~~,./
      ~:"-._____.._".
~..2-:r’"
.7~-._#-
   ~




P. ELKINGTON (RPEQ 7226)


for and on behalf of

SOIL SURVEYS ENGINEERING PTY L1MITEC


Attachments                           1 )Notes Relating to this Report
                                      2) Borehole Record Sheets and DCP Test Results
                                      3)Aerial Photograph/Site Plan
                                      4)Site Photograph
                                      5) Historic Aerial Photographs




                                                             ~SOIL SURVEYS ENGINEERING PTY LIMITED
1-15522,2013-09-20, LR VER 0

Page 14

                                                       NOTES RELATING TO THIS REPORT



.lNIRQDUCU01l.                                                                       descriptive terms regarding weathering (AS1726-1993
These notes are provided by Soil Surveys Engineering                                 Table   A9), strength (refer Table             1    below;, (:l;:.~:l~~:;
Pty Lm ted (the Company) to complement                                         the   (AS1726-1993 Table A10), etc. Where strength testing
geotechnical report in regard to classification methods                              (ie Point Loads) is carried out, AS1726-1993 Table A8
and field procedures.                    Not all notes are necessarily               is used. Where relevant, further information regarding

relevant to all reports.                                                             rock classification is attached.

The     ground          is   a   product of continuing natural and
                                                                                      Table 1 Estimated strength descriptions given to rock
man-made processes and therefore exhibits a variety
                                                                                                 based on engineering examination
of characteristics and properties which vary from place

to   place and           can       change with time.            Geotechnical         :1~t,iJ;(\;~\;~~’m:~~~r0\~~J1~jr~ :~,~r~~~~!~~~~)!!!1’
engineering involves gathering and assimilating limited                                    Extremely Weak                            < 1.0


information about these characteristics and properties
                                                                                              Very Weak                            1.0   -
                                                                                                                                             5.0
in order to understand or predict the behaviour of the
                                                                                                   Weak                            5.0   -
                                                                                                                                             25
ground on a particular site under certain conditions.
This report may contain such information obtained by                                       Moderately Strong                       25- 50


inspection, excavation, probing, sampling, testing or                                            Strong                            50 -100

other means of investigation.                     If so, they are directly
                                                                                              Very Strong                          100   -
                                                                                                                                             250
relevant only to the ground at the place where and at
                                                                                           Extremely Strong                          > 250

 he time when the investigation was carried out.
                                                                                       Ref ISRM "Suggested Methods for the Quantitative
DESCRIPTION AND CLASSIFICA TION METHODS
                                                                                           Description of Discontinuities in Rock Masses"
Soils   -   The methods of description and classification of

soils and rocks used                     in this report       are    based      on

                                                                                     SAMPLING
Australian         Standard          1726-1993         (Geotechnical Site
Investigations),              where       appropriate.          In                   Sampling is carried out during drilling or from other
                                                                       general,
                                                                                     excavations to allow          engineering       examination          (and
descriptions cover the following properties                     -   soil or rock

type, colour, structure, strength                        or    density,        and   laboratory testing where required) of the soil or rock.

nclusions. Identification and classification of soil and                             Disturbed      samples taken           during       drilling     provide

rock    involves                                                                     information    on      plasticity, grain size, colour, moisture
                         judgement and             the   Company infers
                                                                                     content,    minor       constituents    and, depending               upon
accuracy only to the extent that is common in current

geotechnical practice.                                                               sample disturbance, (information                on      strength     and

                                                                                     structure).
Soil   types are described according to the dominant
                size     and       behaviour                                         Undisturbed samples           are    taken    by pushing         a    thin
particle                                          as     set    out     in     AS

1726-1993.                                                                           walled sample tube, usually SOmm diameter (USO),into

                                                                                     the soil and withdraWing it with          a   sample of the soil
Cohesive soils are classified on the basis of strength
                                                                                     contained     in   a    relatively   undisturbed        state.     Such
(consistency) either by                   use   of hand        penetrometer,
shear                                                                                samples yieid information on structure and strength,
                vane,        laboratory      testing      or      engineering
                                                                                     and   are   necessary for laboratory determination                     of
examination.                 The    strength    terms     are       defined     in
                                                                                     shear    strength,        volume       change        potential       and
AS1726-1993 Table A4.
                                                                                     compressibility.         Undisturbed    sampling          is   generally
Non-cohesive soils                 are    classified     on    the    basis of
                                                                                     effective only in cohesive soils.
relative        density usually           based    on    insitu      testing    or

                                                                                     Details of the type and method of sampling used are
engineering examination (see AS1726-1993 Table A5).
                                                                                     given on the attached logs.
Rocks       -
                Rock types are classified              by their geological
names           (AS1726-1993 Table                 A6), together             with




NOTES RELA nNG TO THIS REPORT.JUNE 2009.LWP                                                                    SOIL SURVEYS ENGINEERING

Page 15

                                                                            -
                                                                                2-


 TEST LoeA TlONS                                                                     the drilling. The        depth of refusal of the different bit
Test locations (e.g. boreholes, CPT’s, test pits etc.)                               types can provide information as to the st~~r.2~": .}f :!’:’:
Were based oli available access at the time of testili9                              material encountered. Generally two different bit types

(access may need to be provided "by others").                            Test        are   used. The ’V’ bit is a V shaped steel bit and the

locations may have been shifted if access was not                                    ’TC’bit is a tungsten carbide tipped Screw type bit.

suitable.                                                                            Wash Boring       -    The borehole is usually advanced by a

Unless noted otherwise, accuracy of test locations are                               rotary bit with water or fluid pumped down the hollow
to the accuracy of hand held GPS equipment.                                          drill rods and returned up in the space between the

INVESTIGA TlON METHODS                                                               rods and the sailor casing, carrying the drill cuttings,

The    following         is   a    brief summary of              investigation       Only major changes in stratification can be determined
methods currently adopted by the Company and some                                    from the cuttings, together with some information from

comments on their use and application.                                               "feel"    and     rate     of    penetration.          More        accurate

Test Pits            These                             excavated with                information on soil strata is gained by regular testing
                -
                                  are       normally                         a


backhoe                   tracked                                                    and   sampling using            the Standard Penetration Test
               or    a                      excavator, allowing         close

examination of the insitu soils if it is safe to descend                             (SPT)and undisturbed thin walled tube samples (U50).
into the pit. The depth of penetration is limited to about                           Mud Stabilized           Drilling    -    Either Wash            Boring   or


3m for a       backhoe and up to 6m for an excavator.                                Continuous C r           Drilling    an    US        drilling    mud as a

limitations of test pits               are    the   problems associated              circulating fluid to stabilize the borehole.                      The term

with disturbance and difficulty of reinstatement and the                             "mud" encompasses a range of products ranging from

consequent effects on close-by structures. Care must                                 bentonite to polymers such as Revert or BiogeL                         The

be taken if construction is to be carried out near test pit                          mud      tends    to     mask       the    cuttings         and     reliable

locations to either               properly recompact the backfill                    identification    is     only possible from regular intact

during    construction            or   to    design    and construct the             sampling (eg. from SPT and U50 samples) or from
structure so as not to be adversely affected by poorly                               rock coring, etc.

compacted backfill at the test pit location.                                         Continuous Core Drilling             -   A continuous core sample

Hand Auger Drilling                -       A borehole of 50 to 100mm                 is obtained      using    a   diamond          or   tungsten carbide
diameter        is       advanced            by     manually        operated         tipped   core    barrel.        Provided full        core       recovery is

equipment. Refusal                of the augers            can   occur on   a        achieved (which is not always possible in very weak

variety of materials such as hard clay, gravel or rock                               rocks and     granular soils), this technique provides a

fragments and does not necessarily indicate rock level.                              very reliable method of investigation. In rocks, NMLC

Continuous Spiral Flight Augers                        -   The borehole is           coring (nominal 52 mm diameter) is usually used with

advanced                                                                             water flush. The length of core recovered is compared
               using 75 to 300 mm diameter continuous
                                                                                 to the length drilled and any length not recovered is
spiral flight augers, which are withdrawn at intervals to
allow sampling                insitu testing.         This is a                      shown    as   CORE LOSS.             The location of losses is
                         or                                         relatively
economical                     of drilling in                                        determined on site by the supervisor. If the location of
                means                               clays and in sands
above the water table.                                                           the loss is uncertain, it is placed at the top end of the
                                       Samples are returned to the
surface    by the flights               or            be    collected   after    run, when the core is                placed in a storage tray and
                                              may
withdrawal of the augers. Information from the drilling                          recorded on the log.

(as distinct from specific sampling) is of relatively lower                      Standard Penetration Tests                     -
                                                                                                                                    Standard Penetration

reliability due to remoulding, inclusion of cuttings from                        Tests (SPT)are used mainly in non-cohesive soils, but

above     or   softening of samples by groundwater, or                           can       also be used in cohesive soils, as a                       means    of

uncertainties as to the original depth of the samples.                           indicating density or strength.                    The test procedure is

Augering below the groundwater table has a lower                                 described in Australian Standard 1289, "Methods of

reliability than augering above the water table. Various                         Testing Soils for Engineering Purposes"                     -   Test 6.3.1.

drill bits are attached to the base of the augers during



NOTES RELA TlNG TO THIS REPORT JUNE 2009.LWP
                                       -
                                                                                                              SOIL SURVEYS ENGINEERING

Page 16

                                                                               -
                                                                                    3   -




 The test is carried out in a borehole by driving a 50mm                                    resistance, fs, in kPa). These forces are measured by
 diameter split sample tube with a tapered shoe, under                                      electrical transducers (strain gQ~g~:::; ’..::~~::-: ~~: :::-::

 the impact of a 63 kg hammer with a free fall of 760                                       device. The ratio between friction resistance and cone

 mm.       It is normal for the tube to be driven in three                                  resistance is also calculated as a percentage, ie.-

 successive 150 mm increments and the ’N’ value is                                               .                          Friction Resistan eels (kPa)x 100
                                                                                            Fnct’
                                                                                                Ion R at’
                                                                                                        /0 (FR)         _

                                                                                                                        -


                                                                                                                           cone resistan ce, qe (kPa)

 taken as the number of blows for the last 300 mm, the                                      The friction ratio, FR, is generally low in sands (less

 upper      150        mm   being neglected             due       to    possible            than 1% or 2%)and generally higher in clays (say 3%

 disturbance from the drilling method. In dense sands,                                      or   more).       The interpretation of sandy clays, clayey

 very      hard    clays    or   weak         rock, the full 450             mm             sands and material with          a   high silt content is more
 penetration may            not be      practicable and the test is                         difficult, but intermediate values (between 1 % and 3%)
 discontinued at a reduced penetration.                                                     would be expected.          Highly organic clays and peats
 In the case where full penetration is obtained with                                        generally have a friction ratio in excess of 5%.
 successive blow counts for each 150 mm of, say 4, 6                                        Static cone data is recorded in the field on disc for later

 and 7 blows, the record shows,                                                             presentation using computer aided drafting.
             4,6,7                                      N = 13                              The equipment can be operated from any conventional

 In a case where the test is discontinued short of full                                     drill rig.   A total applied load in the range of 4 to 10

 penetration, say after 15 blows for the first 150 mm                                       tonnes is required for          practical purposes, although
 and 30 blows for the next 40 mm, the record shows:                                         lighter loads may be used.            The cone penetrometers

             15,30/40mm                                                                     are available with various capacities of cone resistance

The results of the test can be related empirically to the                                   ranging             to   100    MPa    for
                                                                                                          up                             general    purpose
 engineering properties of the soil.                                                        investigations, while a range of 0 to 10 MPa can be
Occasionally, the drop hammer is used to drive 50mm                                         used where more sensitive investigations of soft clay

diameter thin walled sample tubes (USO)in clays.                               In           are required.

such circumstances, it is noted on the borehole logs.                                       The               resistance value                    continuous
                                                                                                     cone                          provides   a

A modification to the SPT test is where the                                 same            measure      of soil strength or density, and together with

driving system          is used with          a   solid 600 tipped steel                    the friction ratio, provide very useful indications of the

cone of the same diameter as the SPT hollow sampler.                                        presence of narrow bands of geotechnically significant

The solid        cone can     be    continuously driven for some                            layers such as thin, soft clay layers or lenses of sand
distance in soft clays or loose sands, or may be used                                       which    might otherwise be missed using conventional
where damage would otherwise occur to the SPT. The                                          drilling methods.
results of this Solid SPT are shown                         as   "Ne" on the                The lithology of the encountered soils is interpreted

borehole logs, together with the number of blows per                                    from static cone data and is generally presented on the

150 mm penetration.                                                                         static cone log sheets,

Cone       Penetration Tests              -
                                               Test     Method          -
                                                                            Cone            It is important to note that the lithology is interpreted

Penetration Tests (CPT)are carried out in accordance                                        information and is based on research by Schmertmann

with    AS 1289 Test             6.5.1-1977, using            an       electrical       (1970), Sanglerat (1972), Robinson and Campinalli
friction-cone penetrometer.                                                                 (1986), modified to suit local conditions as indicated by
The test      essentially comprises the measurement of                                  borehole information and laboratory testing.

resistance        to   penetration       of       a   cone   of 35.7         mm         As soils         generally change gradually it is sometimes
diameter pushed into the soil at a rate of 10-20 mm per                                 difficult        to    accurately   describe     depths    of   strata

second       by    hydraulic       force.             The    resistance       to        changes, although greater accuracy is obtained with
penetration is recorded in terms of pressure on the end                                 the static cone compared with conventional drilling. In

area    of the     cone     (cone resistance, qe, in MPa) and                           addition, friction ratios decrease in accuracy with low
friction    on    the side of the             135      mm        long sleeve            cone resistance           values, and in desiccated soils. As a
immediately above             the       top of the           cone       (friction       result, some overlap and minor discrepancies may


NOTES RELA TING TO THIS REPORT JUNE 2009.LWP
                                    -
                                                                                                                     SOIL SURVEYS ENGINEERING

Page 17

                                                                              -4-


 exist      between        static    cone     and        nearby       borehole      GROUNDWATER

 information.                                                                       Where groundwater levels are measured in boreholes,

 Portable     Dynamic Cone Penetrometers                          -
                                                                      Portable      there are several    otehtlal    robletns.

 Dynamic Cone Penetrometer (DCP)tests are carried                                    Although groundwater           may   be     present in lower
 out by driving a rod into the ground with a falling weight
                                                                                    permeability soils, it may       enter the hole     slowly or
 hammer and           measuring          the blows for successive
                                                                                    perhaps not at all during the time the hole is open.
 100mm increments of penetration.                                                    A localized
                                                                                    .
                                                                                                     perched   water table may        lead to   an

 The DCP comprises a Cone of 20 mm diameter with
                                                                                    erroneous indication of the true water table.

 30    degree taper attached to steel rods of smaller                               .
                                                                                     Water table levels will vary from time to time with
 section.
                                                                                    seasons or     recent weather changes and may not be
 The cone end is driven with a 9 kg hammer falling 510
                                                                                    the same at the time of construction.
 mm     (AS. 1289 Test 6.3.2).              The test was developed                   The use of water or mud as a drilling fluid will mask
initially    for pavement           subgrade investigations, and
                                                                                    any groundwater inflow. Water has to be bailed out of
empirical correlations of the test results with California
                                                                                    the bore and mud must be washed out of the hole or
Bearing Ratio have been published by various Road
                                                                                    "revertedft if water observations are to be made.
Authorities.        The     Company has developed their own
                                                                                    More reliable measurements can be made by use of
correlations        with     Standard        Penetration      tests          and
                                                                                    standpipes which are read after stabilizing at periods
Density Index tests in sands.
                                                                                    ranging from several days to perhaps weeks for low
LOGS
                                                                                    permeability soils. Piezometers, sealed in a particular
The borehole or test pit logs presented herein are an
                                                                                    stratum, may be advisable in low permeability soils or
engineering and/or geological interpretation                           of the
                                                                                    where there may be interference from perched water
subsurface conditions, and their reliability will depend
                                                                                   tables or surface water.
to some extent on the frequency of sampling and the
                                                                                    FILL
method of drilling          or   excavation.        Ideally, continuous            The presence of fill materials can often be determined
undisturbed sampling             or core      drilling will enable the
                                                                                   only by the inclusion of foreign objects (eg. bricks,
most reliable assessment but is not always practicable
                                                                                   steel, etc.) or by distinctly unusual colour, texture or
or   possible to justify on economic grounds.                          In any
                                                                                   fabric.   Identification of the extent of fill materials will
case, the boreholes or test pits represent only a very
                                                                                   also depend on investigation methods and frequency.
small sample of the total subsurface conditions.
                                                                                   Where natural soils similar to those at the site are used
The attached explanatory notes define the terms and
                                                                                   for   fill, it may be difficult with limited testing and
symbols used in preparation of the logs.
                                                                                   sampling to reliably determine the extent of the fill.
Interpretation of the information shown on the logs,                               The presence of fill materials is usually regarded with
and its application to design and construction, should
                                                                                   caution   as   the possible variation in      density, strength
therefore take into account the spacing of boreholes or
                                                                                   and material type is much greater than with natural soil
test   pits, the method             of   drilling   or   excavation, the
                                                                                   deposits. Consequently, there is an increased risk of
frequency of sampling and testing and the possibility of                           adverse engineering characteristics or behaviour.            If
other    than   ftstraight       line"     variations      between           the
                                                                                   the volume and quality of fill is important to a project,
boreholes or test pits. Subsurface conditions between
                                                                                   then    frequent test pit excavations are preferable to
boreholes      or   test     pits may vary significantly from                      boreholes.
conditions encountered at the borehole                       or       test   pit
locations.




NOTES RELA TING TO THIS REPORT JUNE 2009.LWP
                                    -
                                                                                                         SOIL SURVEYS ENGINEERING

Page 18

                                                                           -5-


 LABORATORY TESTING                                                               If differences occur, the Company will be pleased to

 Laboratory         testing     is       normally     carried       out     in    assist with        investigation        or    advice to resolve any

 accordance with ALJstraliah Standard 1289 "Methods of                            problems occurring.
 Testing Soil for Engineering Purposes". Details of the                           SITE ANOMALIES

test procedure used are given on the individual report                            In the event that conditions encountered on site during

 forms and the attached              explanatory notes summarize                  construction appear to vary from those expected from

 important aspects of the Laboratory Test Procedures                              the information contained in the report, the Company

adopted.                                                                          requests         that   it   immediately        be        notified.           Most
 ENGINEERING REPORTS                                                              problems are more readily resolved when conditions
 Engineering         reports        are       prepared     by      qualified      are    exposed than at some later stage, well after the
personnel and are based on the information obtained                               event.

and on current engineering standards of interpretation                            Extreme events including but not limited to the results
and analysis. The information provided in Soil Surveys                            of climate change, ego flood levels above                           previously
Engineering reports is opinion and interpretation and                            identified        levels, beach         scour      or      erosion        beyond
not factual.        The client/contractor increases their risk                   normal expectations (as identified by local authorities)

by     not   retaining        the       person      who   authored        the    extreme rainfall events, war, espionage, sabotage may

geotechnical report, to carry out site inspection and                            r   sult     in    different      c    ndit ns        betw       n       tim     of
review (overseeing role) during construction, to confirm                         investigation and time of construction.
opinion and interpretation expressed in the report is                            REPRODUCTION OF INFORMA TlON FOR
accurate. Where the report has been                       prepared for a         CONTRACTUAL PURPOSES
specific     design        proposal           the    information          and    Attention is drawn to the document "Guidelines for the
interpretation       may      not       be    relevant    if the    design       Provision of Geotechnical Information in Construction
proposal is changed. If this happens, the Company will                           Contracts         (1987)", published by               the       Institution      of
be pleased to review the report and the sufficiency of
                                                                                 Engineers, Australia. Where information obtained from
the investigation work.
                                                                                 this investigation is provided for tendering purposes, it

Every care is taken with the report as it relates to                             is recommended that all                  information, including the
interpretation of subsurface conditions, discussion of                           written    report and discussion, be made available.                             In

geotechnical         aspects            and    recommendations             or    circumstances, where the discussion                             or   comments

suggestons for design and construction.                         Since the        section is not relevant to the contractual situation, it

test sites in any        exploration represent a very small                              be
                                                                                 may           appropriate         to    prepare       a    specially       edited

proportion of the total site and since the exploration                           document. The Company would be pleased to assist

only identifies actual ground conditions at the test sites,                      in this regard and/or to make additional report copies

even   under the best circumstances actual conditions                            available for contract purposes at a nominal charge.

may vary from those inferred to exist. No responsibility                         REVIEW OF DESIGN
is taken for:-
                                                                                 Where       major civil        or     structural      developments              are

 Unexpected variations in ground and/or groundwater                              proposed          or   where    only a limited investigation has
conditions.                                                                      been completed or where the geotechnical conditions/

 Changes       in    policy    or       interpretation    of    policy by        constraints are quite complex, it is prudent to have a

statutory authorities.                                                           joint      design        review        which     involves            a     senior
.
 The actions of other persons.                                                   geotechnical engineer. We would be happy to assist in

 Any    work        where the company is not                                     this    regard      as    an    extension        of       our    investigation
                                                                given     the

                                                                                 commission.              Construction          drawings           should        be
opportunity to supervise the construction using the
                                                                                 reviewed by Soil Surveys Engineering, with sufficient
Companies designs/recommendations.
                                                                                 time to allow changes if required, prior to inspections.




NOTES RELA TlNG TO THIS REPORT JUNE 2009.LWP
                                    -
                                                                                                               SOIL SURVEYS ENGINEERING

Page 19

                                                                                 -
                                                                                      6   -




 Otherwise Soil Surveys Engineering reserves the right                                        conservatism   which    is   commensurate        with   the
 to refuse to carry out inspections.
                                                                                              consequences of the risk of error.
 SITE INSPECTION                                                                              Estimates of volumes based     on    our   findings require
 The Company will               always be pleased                  to    provide              interpolation and extrapolation between test locations
 engineering        inspection           services      for      geotechnical                  and as such may be significantly different from actual

 aspects of work to which this report is related.                                             volumes.

 i)     Site visits during construction to confirm reported

 ground conditions
 ii)    Site visits to assist the contractor or other site

 personnel in identifying various soil/rock types such as

 appropriate footing or pier founding depths, the stability
 of a filled or excavated slope; or

 iii) Full-time engineering presence on site.
 In the vast majority of cases it ;s advantageous to the

 principal for the geotechnical engineer who wrote the
investigation report to be involved in the construction
 stage of the project.
The geotechnical engineer cannot take responsibility

for variations in encountered conditions, where he is

not     given    the     opportunity       to review         plans for the
proposed development with sufficient time to allow
review        and      make         changes       to        the     proposed
development if required, and where he is not given the
opportunity         to    inspect         the     site      and         oversee

construction methods with                 regard      to site conditions

with     sufficient      time     to     observe      all      relevant        site

conditions and operations.

RESPONSIBLE USE OF GEOTECHNICAL

INFORMA TlON

Recommendations              in     our     report       are      for    design
purposes        only     and      provided      on       the      basis       that

inspections      are     carried out to allow finalisation of

opinions and           recommendations               contained           in    our


report.

The geotechnical investigation consisting of field and

laboratory testing         has been carried out to indicate

typical    conditions          by       indicating       conditions           and

parameters at the specific locations of boreholes/test

pits.     Subsurface conditions             are     indicated at these

locations only and. the inference of conditions between

or     away     from     these      locations        (interpolation           and

extrapolation)       involves       a     certain     degree            of    risk.

Persons inferring such conditions or carrying out such

inferences should do so with a degree of caution and




NOTES RELA    NG TO mls REPORT JUNE 2009.LWP
                                    -
                                                                                                                SOIL SURVEYS ENGINEERING

Page 20

..




                                      Soil Surveys Engineering Pty. Limited                                       BOREHOLE RECORD SHEET
                                      Specialist in Applied Geotechnics
                                      Mlton:ph~1133696tlOObtIobane@ScloLrve}’8.arn.""                      Location Number: BH 01
                                      Gold Coos!: ph+1755OO0465~c""...u

                                      Nor1hamRlvefs:ph+175S2345n_~com.lW                                   Project Number: 113-15522
                                      Maclaly. ph +61 749<229rJ1 m     Y@sole<r;eys.oom.au
                                                                                                           Project Name: Revetment Wall Failure
            ~q:f)U. S{.HfVl~YS
                                                                                                           Location: 25 Dolphin Crescent, Noosaville

            Easting:507654                 Northing: 7080212                   RL: Bed level m             Client: G & K Whyte

            Logger: 8M               Operator. CS                    Machine:                              Date: 27/08/2013                                          Page: 1 OF
                                                       "
           Drilling Method                                                                                                                       DCPTest
                                                      :c
                     g r           Depth               Q.
                                                                                             Description                                 (blows/10Omm)                  Samples and
                                                      l!’                                                                                                                    Remarl<s
           ~ ~ ~ ~ ~                                  Cl                                                                                         12   18   24   30

                                                 .:....: .: NATURAL SAND (SP)Very loose, fine to medium grained,

                                                 ::....-:-.:: grey, shell grit, wet.
                                                  ’,,’ .

                                                  :
                                                  ’,::’,
                             0.5
                                                            "

                                                  .
                                                      ’,:




                                                 ’.
                                                      ’,’ ~.




                              1.0

                                                  ’". .




                                                 .
                                                     ’.’    .




                                                 .

                                                      .".’
                             1.5
                                                 .
                                                     ’,’    .




                                           1.80 ’. .,.: ’.
                                                 :’........: SAND (SP)Medium dense,fine to medium grained, yellow

                             2.0                 ::’’:-:’..:’brown, shell grit, moist.

                                                 ’.
                                                      .
                                                          : .




                                            .2

                                                                BOREHOLE BH 01 TERMINATED AT 2.20 m


                             2.5


      ~
      o


      ~
      ~
      o

                             3.0
      ’"




     I
      t


                             3.5
     ~
     ~
     g
     :;:

     ~                       4.0
     a:


     g
     <



     ~
     :J
     en



     g                       4.5


     ~
     <!!


     !
     &
                             5.0
     ~
     ~     Comments:                                                                                                           AS-        6ci1
     g                                                                                                                     ’I:W’~.IIIIIy""""’’’.l
                                                                                                                           "".........,--
                                                                                                                            sw-~~


     i
     IV
                                                                                                                                 FR-FJW1

                                                                                                                              Rod<~h
                                                                                                                               Wl’w~...
                                                                                                                              MS......umllrolg                       Approved:
                                                                                                                                 .........
     ~ ~Water FIrst Noted ...s.-Water Steady Level                                                                             Vs-VflYstralg                         Date:

Page 21

.




                                   Soil Surveys Engineering Pty. Limited                                      BOREHOLE RECORD SHEET
                                   Specialist in Applied Geotechnics
                                   MJton:ph<11336961lOObrWm~~COO1.au                                   Location Number: BH 02
                                   Gad CoeoI: ph +61 75500 fl465 goIda>[email protected]

                                   Ncr1hemRlw=ph+61755234577na1horrrNe<[email protected]            Project Number: 113-15522
                                   _Yo ph +61 749422!XJl macJy@soilouve~com.Bu
                                                                                                       Project Name: Revetment Wall Failure
         S~[Hi. S~1:RVi7fS
                                                                                                       Location: 25 Dolphin Crescent, Noosaville
         Easting:507654                 Northing: 7080224                  RL: 8ed level m             Client: G & K Whyte

         Logger: 8M               Operator: CS                       Machine:                          Date: 27/08/2013                                      Page: 1      OF 1
                                                      "
        Drilling Method                                                                                                                      OCPTest
                                                     :
                  g r           Depth                 a.
                                                                                          Desaiption                                     (bIowsJ100mm)          Samples and
                                                     ~                                                                                                            Remarks
        ~ ~ ~ ~ ~                                    (!)

                                             :’.......: NATURAL SAND (SP)Medium dense, fine to medium

                                             ::’.>:’..:’ grained. grey, moist
                                              ’.
                                                     ":.’,

                                                 "       .’

                                                 .
                                                     ."

                          0.5
                                                     ’. .
                                                 .       ..




                                             .....            .




                          1.0
                                                 .       .’



                                             .                .
                                                     "



                                             ....             .




                                        1.26 :’:’:’.
                                             :’...... -:. SAND (SP)Dense, fine to medium grained, grey, moist.
                                             ....             "




                                             "
                                                     "
                          1.5                ’,’,- ",




                                             .
                                                 ’,’          .




                          2.0           2.00"        ’::’.
                                                                  BOREHOLE 8H 02 TERMINATED AT 2.00 m




                          2.5


  1
  o


  8
  ~
  o

                          3.0
  ..,




  I
  ^

  .
                          3.5
 g
  ~

 ~
 ~
 J

 ~                        4.0
 tr



 ~
 it
::::J
 ..



 ~                        4.5


~
 "1

~
~

~       Comments:
                          5.0
~                                                                                                                         RS-         ’.Soil
g                                                                                                                      XN-BIr..IIIjy-...dIllf.l
        1)DCP refusal met at 1.5m.                                                                                     DW.I>otindIY_
                                                                                                                        SW-SlcJhfti’olllUltw.d         uso
                                                                                                                                                            I
~
::::J
                                                                                                                               FR-Fn5h

                                                                                                                          Rock~th
                                                                                                                           w;w~...                     SPT]
 U)
                                                                                                                          us   -   Madum ItrmQ
                                                                                                                                                  Disturted
                                                                                                                                                              Approved:
                                                                                                                                                    Sample [
                                                                                                                               6.......
~ ~Water First Noted ....s.- Water Steady LeIIel                                                                           VS-V<<y~                           Date:

Page 22

.




                                  Soil SUNeys Engineering Ply. Limited                                     BOREHOLE RECORD SHEET
                                  Specialist in Applied Geotechnics
                                  Mlton:[email protected]                 Location Number: BH 03
                                  =::’;::6~:23~=;a.,,-,w                                            Project Number: 113-15522
                                  _y:ph <617 49o<22!107 macIca~cor"’(J
                                                                                                    Project Name: Revetment Wall Failure
        SOIL SilRVEYS
                                                                                                    Location: 25 Dolphin Crescent, Noosaville

        Easting:507662                 Northing: 7080227                RL: Bed level m             Client: G & K Whyte

        Logg.er: 8M              Operator: CS                   Machine:                            Date: 27/08/2013                                Page: 1 OF
       0riIII0g Method                            o
                                                                                                                                          DCPTest
                                                  :t=
                 g r           Depth              a.
                                                                                      Description                                  (blows/1oOmm)       Samples and
                                                  ~                                                                                                         Remarks
       ~ ~ ~ ~ ~                                  (!)

                                                  .
                                                            NATURAL SAND (SP)Very loose,fine to medium grained,

                                             ::’.:’:’::’ grey brown., wet
                                             ’,,"       .




                                             .
                                                  ."

                         0.5
                                             ’,’,,4,




                                             .    .   ’.

                                             .
                                                 ’"     .




                                             .
                                                 ."

                         1.0
                                             ’,’,’ ".
                                             .
                                                 ’.’    .




                                       1.20 :’:’:’.
                                             :’.:.:.:. SAND (SP}Medium dense, fine to. medium grained,
                                                                                                       grey,
                                              ’:.::. :. moist.

                         1.5                 .



                                             .
                                                 ’.’
                                                  ..


                                             .
                                              ’,’       .




                                              ’,:’      .




                                       1.70,’ :’.
                                                            SAND (SP)Dense, fine to medium grained, grey, moist.
                                                        "
                                                 ’.




                         2.0           2.00 ’. .: :’.


                                                            BOREHOLE BH 03 TERMINATED AT 2.00 m




                         2.5


 1
 o


 ~
 lil
 ’"

 ’"

                         3.0
::
..,




I^



l
                         3.5
I
~
:::i
~
~                        4_0
If
g
...



~
=>
’"



~                        4.5


~
<!1

~
~
~
                         5.0
~
~      Comments:                                                                                                       AS-         Soil
’"
                                                                                                                    >l:N..E.,.jy......d
’"
                                                                                                                    DW.__
                                                                                                                    SW-Sl/IIIti~

i
’"
                                                                                                                          FR-Ff1IIth
                                                                                                                       Rod<
                                                                                                                            Stn.:ath
                                                                                                                        IIINw~"",
                                                                                                                       MS Mtdum strmg
                                                                                                                         -
                                                                                                                                                    Approved:
                                                                                                                          s.......
g ~Water~Noted ~WaterSteadyLevel                                                                                        \IS-V.-yShtlg               Date:

Page 23

.




                                   Soil Surveys Engineering Pty. Limited                                         BOREHOLE RECORD SHEET
                                   Specialist in Applied Geotechnics
                                   Mllon:pIl+61733696000~ys.",,",.,,"                                   Location Number: BH 04
                                   Goid Coo’" ph <61 75500 0465 goIck;[email protected]

                                   N_RNeta:pI\+6175523-’S77_~ys.com.au                                  Project Number: 113-15522
                                   Mackay. pIl.oS1 749422SfJ7 _~oom.Bv
                                                                                                        Project Name: Revetment Wall Failure
         s.on. SJ,lRvt?Y3
                                                                                                        location: 25 Dolphin Crescent, Noosaville

         Easting:50765B                 Northing: 70B0234                       RL: 8ed level m         Client: G & K Whyte

         Log.g.er: 8M             Operator: CS                          Machine:                        Date: 27/08/2013                                                 Page: 1   OF 1
                                                         (J
        DrillIng Method                                                                                                                            DCPTest
                                                        :t:
              gE                Depth                    Cl.
                                                                                          Description                                      (blows1100mm)                    Samples and
                                                         ~                                                                                                                   Remarks
        ~ ~ ~ ~ 5                                       (!)                                                                                        12   18    24    30


                                                                   NATURAL Silty SAND (SM)Very loose, fine to medium
                                                                   grained, yellow brown, medium plasticity fines, organics
                                                                   throughout, strong odour.


                          0.5




                          1.0




                          1.5




                                                        .
                                                                   SAND (SP)Loose to medium dense, fine to medium

                                                ::’.’::<: grained, grey, moist.
                                               .




                          2.0           2.00        .   :.
                                                     .: :
                                               .:.:....:. SAND (SP)Medium dense, fine to medium grained, grey,
                                                ’:..:’.:- moist.

                                        2.30        .   ’::’.
                                                                   SAND (SP)Dense, fine to medium grained, grey, moist.

                          2.5                   .
                                                    ....:.

 1                                             ’.    ,"        ,


 o                                                  .    .’

                                                .       ",     .
 N



 ~
 .,
                                               ’.

                                               :..
                                                     ’.:....
                                                     .’
                                                              .




 o


::
 ’"
                                                                   BOREHOLE BH 04 TERMINATED AT 3..Q0 m

I
 ~
~
                          3.5
1
~
~
:;:j
:g
J

~.                        4.0
f&
g
<(



~
:::>
 ’"

,.;
lil                       4.5



~
~
~
~
                          5.0
~
~ Comments:                                                                                                                      R$-        5cil
’"
o
                                                                                                                              ’:t!N-&lr.~......._.d
                                                                                                                              rm.lliotinaIy_
                                                                                                                               SW-SllQhtly.....,             uso
                                                                                                                                                                I
i
CD
                                                                                                                                    FR-Frah
                                                                                                                                RockSlh.nath
                                                                                                                                  "".;7:"                    SPT
                                                                                                                                                                ]
                                                                                                                                us Mrdum strm"
                                                                                                                                   -



                                                                                                                                                        Disturbed
                                                                                                                                                                  Approved:
                                                                                                                                                         Sample [
                                                                                                                                    .........
~      ~WaterArstNDted -S-WaterSteadyLevel                                                                                       VS-Vrjstrcng                     Date:

Page 24

                                Soil Surveys Engineering Pty. Limited                                           DYNAMIC CONE PENTROMETER TESTINn
                                Specialistin Applied Geotechnics
                                                                                                    Project Num ber: 113-15522
                                Mlton: ph +17 3369 6OOOb~arn.,,"

                                GaldCoost:ph+61755000465go1d~oom.ou                                 Project Name: Revetment Wall Failure
                                ==::;:~;:!~-:=ys.com.au                                             Location: 25 Dolphin Crescent, Noosaville
                                                                                                    Client: G & K Whyte
     :ROI1. S~.JRVl~:(:~



                 DCP05                                           DCP06                                            DCP07
     Ea&t           Nor1hi1g:             Rl         Easting.       Northing:             Rl         Ea1iUlg:       Nonting:             RL

                            DCPTest                                         DCPTest                                         DCPTest
                          (blowsl100mm)                                   (blowsl1OOmm)                                   (blows1100mm)
                                12   18   24   30                               12   18
      0.0                                             0.0                                 24   30
                                                                                                      0.0                      12   18   24   30




      0.5                                             0.5                                             0.5




      1.0                                             1.0                                             1.0




      1.5                                             1.5                                             1.5




      2.0                                             2.0                                            2.0




     2.5E                                             2.SE                                           2.SE
            a.                                              a.                                              a.
            Gl                                              Gl                                              Gl
            Q                                               Q                                               Q




     3.0                                             3.0                                             3.0




     3.5                                             3.5                                             3.5




     4.0                                             4_Q                                             4_0




     4.5                                             4.5                                             4.5




     5.0                                             5.0                                             5.0
    Notes                                           Notes                                           Notes
.




    1. Operator: ZDK                                1. Operator:ZDK                                 1. Operator: ZDK
    2. Date: 2410912013                             2. Date: 2410912013                             2. Date: 24/0912013

Page 25

                                                                                                                                                          --~-_._-_._-




                                   (~a tLlf~d t)ftSurlda~t~ ’11 Au.gust 20’1(3




BH Offsets from Remaining Revetment Wall                                                                                                                           rl_......____




BH1    -
           20m                                                   DCP’s 5-7 located
BH2    -
           10m                                                   immediately behind the
                                                                                                                                                                   ____.___   ’__-.i.




                                                                                                          Project    Revetment/Retaining Wall Failure
BH3    -
           10m                                                   shotcrete revetment batter                                                                  Drawing Nt),
                                                                                              Date
BH4    -
           O.5m                                                                               Sept 2013   location   25 Dolphin Crescent, Noosaville                           J1l4.
                                                                                                                                                                 11~:.1!W22
Note: Water depth in brackets (measurementstaken within 2 hours of High Tide)                 Checked
                                                                                                          Client     G & K Whyte
                                                                                                                                                        =====_     :==::111==_===-’==:

Page 26

"




                                                                                                                                                                                                                 Job No. 213-15522




    I                                     ...~/~?~~f?~~;~F’ .;;..... ..~~;.;:.. .~: :.::.
                                  ,’~;"l;~ti:i :’::’:?~:’,):(" -:~: ;’:~m::~:;~: ;;:::::~::::::
                                                                                                                   .
                                                                                                                       :";::..’        ..
                                                                                                                                                                                                                       ....



                                                                                                                                                                                                                          _..’:....~~:

                              ..."’’^’’’’’.’,..


    i.,’
    .. :’:.
              :;;:^.~
              ..
                        .




                   >’;-’:::
                                                    .....:’jl),;~jlr.i!’!;:~i;d\,;,;.; :}:f{f:;;~{:j"
                                                                         ;;;:’.-.:::::-
                                                                                                                                    .’;’      .




                                                                                                                                               .
                                                                                                                                                  ~..:
                                                                                                                                                               .::’~’"

                                                                                                                                                         ~ ;: ~:
                                                                                                                                                                   ;.:-
                                                                                                                                                                          ::.::::~:’::’

                                                                                                                                                                                   ;:.= ::~:
                                                                                                                                                                             :’:’: :.):
                                                                                                                                                                                               .~:;
                                                                                                                                                                                                      :{i.t;!;w:; ;!:’:.t(: (i;’;:.; ~1: :\~!,;i)f;~ w~~i1jj~
                                                                                          ’;’: :.::....~K:   ~x~;:.,              ........   .{{:":;:                                          ,..      ’~ ...~",," 7"’." "’f




                                                                                                                                                                                                                                                                1




                                                            Site Photograph 27 August 2013




                                                                                                                 #,SOIL SURVEYS ENGINEERING PTY LIMITED


[OCR of page images]
 

 

Job No. 213-15522

 

 

 

 

 

 

Site Photograph 27 August 2013

 

#- SOIL SURVEYS ENGINEERING PTY LIMITED

Page 27

     ..



.l




                                     J~b No. 213-15522




            June 2008




          September 2012




               ~ SOIL SURVEYS ENGINEERING PTY LIMITED


[OCR of page images]
 

Job No. 213-15522

 

 

 

 

 

 

 

|
|
;
June 2008
|
|

 

 

 

 

September 2012

 

#- SOIL SURVEYS ENGINEERING PTY LIMITED

Page 28

Graham & Karen Whyte
25 Dolphin Crescent
Noosaville, Qld...4566



9th October, 2013

Queensland Department of Natural Resources & Mines

Re: Authority to Act on our Behalf


Dear Sir,
This letter is to advise that we give authority to the following to act on our behalf individually or
together with respect to Owners Consent to a Development Application for proposed works at our
property situated at 25 Dolphin Crescent, Noosaville, Qld, 4566:



Danny Reed
c/- Noosa Jetty Builders
P.O. Box 299
Noosaville. Qld...4566




John Norden
c/- John Norden & Associates
Structural/Civil Design Engineering
Suite 16, Tewantin Plaza,
113 Poinciana Avenue

Tewantin, Qld...4565




Yours Faithfully,




                            /-~r
                                K.M. Whyte

Used in these records

About this file

File size
18.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Geotech Report and Plans - OPW13_0816.pdf · 18.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.