Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2002.00220433.002 [As Published] · 132002.220433.2
2002/220433
23. A new 1.2 metre wide concrete path shall be constructed along the Plover Street frontage of
the site in accordance with Council’s design standards. Care shall be taken to protect any
significant vegetation or any underground services.
24. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel
and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
Stormwater Drainage
25. All stormwater drainage shall be collected on site and discharged to Council’s street drainage
system in Plover Street. In this regard, plans shall be prepared by a Registered Professional
Civil Engineer and submitted to Council prior to obtaining a Development Permit for
Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s street drainage system
at any one location is 25 litres/second.
26. All site stormwater drainage shall be by means of a gravity systems.
Sewer Mains
27. The site shall be connected to Council’s sewerage reticulation system (expected to be
constructed in the 2003/04 financial year) and be constructed in accordance with Council’s
standards and requirements at no cost to Council.
Town Water Supply
28. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
29. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units are served by a single service, multiple water meters to
each individual unit shall be installed. All fees for the supply of water meters shall be paid to
the Council.
Effluent Disposal
30. In the situation where the proposed building works are constructed prior to the construction of
sewerage infrastructure (planned for 2003/04 financial year), all wastewater shall be disposed
of on site in accordance with Council’s Planning Scheme Policy PSP29 On-Site Domestic
Wastewater Systems and to the reasonable satisfaction of the Manager - Plumbing Services.
Should effluent disposal not be adequate the use is not to commence until the site is
connected to reticulated sewerage.
31. No interim disposal system shall be installed or the existing on-site effluent disposal system
and disposal area (land application area) utilised by the new building works until the applicant
provides Council with a Geotechnical report that confirms the existing disposal system (soil
condition) is suitable for treating wastewater in accordance with Council’s Planning Scheme
Policy PSP29 On-Site Domestic Wastewater Systems.
Earthworks
32. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
This will require the design and construction of drainage pipes within the development site that
cater for drainage within the adjoining sites and in this regard a Development Permit for
Operational Works shall be obtained.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2002.00220433.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 74 KB (small file)
- File type
No other editions are linked here.