Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1 & 6 and Checklist 1 & 4
~
111111 Integrated Development Assessment System form
Building or operational work assessable
against a planning scheme IDAS form 6 -
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete Applicant details -IDAS form 1
. complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
o building work complete table A
-
I:8J operational work complete table B
-
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
o road works o stormwater D water infrastructure
o drainage Works o earthworks D sewerage infrastructure
I:8J landscaping D signage D clearing vegetation under the planning scheme
D other please specify below
-
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
I:8J development permit D preliminary approval D both specify below
-
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
I:8J No DYes specify the number of lots being created
-
Are there any current approvals associated with this application? (e.g. material change of use)
D No I:8J Yes -
provide details below
Department of Infrastructure and Planning QPlan (t;\~\J
\’:~\\’
Queensland
Government
[OCR of page images]
| | | Integrated Development Assessment System form
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
¢ — complete Applicant details - IDAS form 1
¢ complete any other forms relevant to your application
° provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
L] building work - complete table A X] operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
(J road works (-] stormwater (J water infrastructure
(J drainage Works (1 earthworks (1) sewerage infrastructure
X] landscaping CJ signage (J clearing vegetation under the planning scheme
(J other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
[IX] development permit (J preliminary approval [] both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
—X] No (J Yes - specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
L] No ] Yes - provide details below
Government
PUM Ct Ue aL Tae] (Neer at
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.