Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-07-09 Planning & Environment Committee Agenda

of 128

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA      9 JULY 2019




                                                  Page 109 of 128

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   9 JULY 2019

                                                                             Ee       Heiiny
                                                                            A land &water

         Additional Projects
         Noosa specific model development 2019

         Previous year's core funding has enabled HLW to build a coupled three dimensional hydrodynamic and
         water quality model for the Noosa estuary. The model has recently received a major upgrade to include
         improved sediment resuspension predictions for the lakes and better nutrient dynamics predictions.
         However, it still requires a modest amount of field work to enable it to be fully calibrated for the unusual
         salinity dynamics experienced in the Noosa Estuary.

         Field data is required to provide base data for full model calibration and validation. We would deploy
         two water quality instruments (fully submersible conductivity, temperature and depth sensors) in Weyba
         Ck and Noosa River. The instruments would remain in situ for a period of approximately five weeks, and
         would measure and record water levels, conductivity (pre-cursor for salinity) and temperature. During
         this period the tidal currents and flows would also be measured in the entrance to Weyba Creek over a
         full 13 hour tidal cycle on two separate occasions, namely a large (spring) range tide and a small (neap)
         range tide. Tidal flows and currents would be measured using a vessel mounted Acoustic Doppler
         Current Profiler (ADCP) instrument. Bathymetry (depth) measurements will also be collected
         opportunistically from the tidal reaches of the creek based upon echo sounding cross and long sections
         undertaken at the times of deployment and recovery of the tide recorders.

         The fee for this project is an additional $30,000 to Noosa Council's core funding. The work can be
         completed by June 2020.

                            Level 19, 160 Ann St, Brisbane QLD 4000 | PO BOX 13204 George St, Brisbane QLD 4003
                                                                                        hlw.org.au

                                                                                              Page 109 of 128
Log in to download the original file

2019-07-09 Planning & Environment Committee Agenda(PDF, 13MB).pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.