Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-07-09 Planning & Environment Committee Agenda

of 128

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          9 JULY 2019


On 3 February 2017 the Planning and Environment Court gave Judgement approving a suite of
changes to the 2015 development approval, including revising car parking arrangements for the
development. The requirement for a multi-storey carpark was replaced for an at grade 72 space
car park with an infrastructure agreement entered into for contributions towards upgrading the bus
stop in Goodchap Street. That judgement represents the current iteration of the development
approval for the land. This development approval authorises at total maximum use area of 6,054m2
with each individual use permitted the following maximum use areas at any one time, including:-
   Education - Type 3 Adult - 2,723m2 comprising a maximum of 1,400m2 student contact area
     and 1323m2 of non-student contact area (Student contact area comprises all areas used for
     student lectures, tutorials or the like).
   Retail Business - Type 1 Local, Type 2 Shop and Salon or:
   Entertainment and Dining Business Type, Food and Beverages - 236m2 (includes 16m2 of
     outdoor dining).
   The remaining use area being available for Commercial Business Type 1 – Office and Type
     2 – Medical (2995m2).
The applicant has not fulfilled the conditions to seal the at-grade carpark for 72 spaces or construct
a bus stop on Goodchap Street required as part of the development.
Summary of Staging of the site
For the purposes of providing clarity around conditions the existing and proposed new development
has been broken down into the following stages:
Stage A and B: Buildings as constructed. Note that previously approved plans refer to Stages 1 &
2 also.
Stage C: At grade car park supplying 72 spaces.
Stage D: The proposal subject to this application – 3 storey building.
Refer to Figure 2 – Stage C and site subject to this proposal (Stage D).




                      Figure 2 – Stage C and site subject to this proposal (Stage D)




                                                                                       Page 26 of 128
Log in to download the original file

2019-07-09 Planning & Environment Committee Agenda(PDF, 13MB).pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.