PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
B. Rectify item 9 within the Decision Notice to reflect that a further Development Permit for
Material Change of Use is not required.
C. Include the following additional conditions:
46. Privacy screening to the northern elevation as detailed on the approved plans must be
designed and maintained to ensure that there is no overlooking into the adjoining
residential properties.
47. All elements of the approved Integrated Stormwater Management Plan system must
be maintained in accordance with the Water by Design, Maintaining Vegetated
Stormwater Quality Treatment Assets or manufacturer’s maintenance protocol where
appropriate.
48. Stormwater management measures must be maintained in accordance with this
approval and a contract by an appropriate company to undertake maintenance in
accordance with this approval for a minimum 10 years must be signed and provided to
Council prior to the commencement of use.
D. Delegate the powers of Council under the Planning Act 2016 for minor change applications
for this development to the Chief Executive Officer.
E. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The applicant seeks approval to change an existing development approval for Multiple Housing -
Type 3 Retirement and Special Needs.
The applicant advises:
The applicant has now further reviewed the viability of the project and the overall operations
and due to the costs of construction now seeks to change the existing approval and reduce
the number of buildings on site and provide the additional beds through the inclusion of an
additional storey on two buildings at the rear of the site. The previously approved buildings
at the front of the site over the carpark are to be deleted.
The proposed changes include:
Two storey dementia buildings at the rear of the site for 32 beds;
Revised entry building at front of site;
Deletion of approved buildings over front carparking area;
6 new carparking spaces within the front carpark;
All buildings located above the Q100 flood line; and
All buildings consistent with fire management recommendations.
The proposed changes require consequential amendments to conditions 1, 6, 26, 36 and
rectification of item 9 within the Decision Notice.
The minor change application is before Council as the Development Permit was originally
determined by Council. The subject site is detailed in the following images.
Page 41 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.