Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published] · MCU21/0027.02

of 8

Text shows just the words. Original shows the document exactly as it was published.

               APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
               Author                  Senior Engineer, Morgan Gaffney
                                       Development Assessment

                    APPLICATION DETAILS

                    Application No.                  OPW 21/0047.02

                    Development Approval             MCU21/0027

                    Applicant                        HRS Developments Pty Ltd Tte
                                                     C/- SCG Engineers
                                                     19 September 2023
                    Request Received On
                                                     Fees paid 5 October 2023
                    Report Reviewed By               Mark Lewis on 17 October 2023

                    Decision Due Date                17 October 2023


                    PROPERTY DETAILS

                    Property Address                 30 & 32 James St Noosaville Qld 4566

                    RP Description                   Lots 3 & 4 RP 72986

                    Land Area                        Lots 3 RP 72986 = 983.01 m2
                                                     Lot 4 RP 72986 = 983.42 m2

                    Existing Use of Land             Residential


                    STATUTORY DETAILS

                    SEQRP Designation                Urban Footprint

                    Zone                             Medium Density Residential

                    Precinct                         Not applicable

                    Local Area Plan                  Noosaville

                    Overlays                         •   Land Subject to Acid Sulfate Soil – 5 meters AHD or below
                                                         (Area 1)
                                                     •   Flood Hazard Overlay

                    Assessment Type                  Minor Change to Development Approval



               1.      PROPOSAL
               The applicant seeks approval to change to an existing development approval for Operational
               Works

                                                                                                       Page 1 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023
Full text of the other 7 pages

Page 2

               The locality and proposal plan are included below.




                                                       Figure 1 – Locality




                                                   Figure 2 – Approved Layout

                                                                                Page 2 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 3

                                                      Figure 3 – Proposed Layout

               2.     BACKGROUND
               On 16 June 2021 a Decision Notice was issued for Material Change of Use – Development Permit
               for Multiple Dwellings (4 Dwellings) and Operational Works – Development Permit for Stormwater,
               Drainage Works, Earthworks and Landscaping.
               During construction, additional infrastructure was located along the development frontage and an
               amended stormwater layout was provided to maintain the required clearances from the existing
               infrastructure while maintaining a functional stormwater layout.




                                       Additional Services Located along Development Frontage


                                                                                                   Page 3 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 4

               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      The Noosa Plan 2020.
               3.2. Statutory Process
               The applicant has requested to make a minor change to a development approval under s78 of the
               Planning Act 2016. An application for a minor change to a development approval can only be made
               in circumstances where a change would constitute a ‘minor change’.
               The proposed change to the development approval requested by the applicant is determined to
               constitute a minor change on the grounds that:
               •      The development would not result in substantially different development as the
                      development does not introduce a new use and the proposed changes are generally minor;
               •      The change does not include prohibited development;
               •      The change would not require the application to be referred to an additional referral agency
                      or cause a referral agency to have regard to new matters prescribed by regulation;
               •      Where the original application was code assessable, the change would not cause the
                      application to become impact assessable.
               3.3. Statutory Instruments – Planning Scheme
               The original development application was approved under the Noosa Plan 2020. The proposed
               minor change relates to amendments to the stormwater layout. The development remains
               generally consistent with the original approval. The applicant has provided amended plans and has
               not made any representations on any of the conditions of the operational works approval.
               The amended stormwater layout involves installing an additional on-grade kerb inlet gully pit
               adjacent to the sag gully pit to allow for compliant pipe grades, junction angles and clearances
               from the existing infrastructure in accordance with the Noosa Plan 2020 and Queensland Urban
               Drainage Manual (QUDM).
               It is noted that the applicant is still proposing the use of ∅450mm and ∅600mm Stormpro pipes.
               Conditions will be altered to include the additional maintenance period for the Stormpro
               poly pipes. It is recommended that the remaining conditions remain unchanged.


               OPW21/0047 Condition 1 – Approved Plans
               Applicant’s Request
               The applicant has provided an amended stormwater design to be included in the approved plans
               for the development.
               Assessment of Request
               Condition 2 is to be amended to include the revised plans as follows:
               Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.


                                                                                                      Page 4 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 5

                         Plan No.        Rev.   Plan/Document Name                      Date

                         31026-OW3.1     A      Earthworks Plan                         22/03/2021
                                                Prepared by SCG Consulting Engineers
                                                (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW5.1     A      Sewer and Stormwater Protection Plan    22/03/2021
                                                Prepared by SCG Consulting Engineers
                                                (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.1     A      Driveway and Access Plan                22/03/2021
                                                Prepared by SCG Consulting Engineers
                                                (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.2     A      Driveway Levels Plan                    22/03/2021
                                                Prepared by SCG Consulting Engineers
                                                (AS ANNOTATED IN RED BY COUNCIL)

                         31026-SW1.1     A      Stormwater Management Plan              22/03/2021
                                                Prepared by SCG Consulting Engineers
                                                (AS ANNOTATED IN RED BY COUNCIL)

                         31026-C1.1      A      Stormwater Relocation Plan              22/03/2021
                                         D      Prepared by SCG Consulting Engineers    14/09/2023


                         31026-C1.2      N/A    Pipe Long Sections                      September
                                                                                        2023
                                                Prepared by SCG Consulting Engineers

                         11              DA5    Landscape - Trees, prepared by Braeden 7/5/21
                                                Constructions and as annotated by
                                                Council

                         12              DA5    Landscape - Ground, prepared by Braeden 7/5/21
                                                Constructions and as annotated by
                                                Council

                         13              DA5    Landscape – Roof Garden, prepared by 7/5/21
                                                Braeden Constructions and as annotated
                                                by Council


               OPW21/0047 Condition 45 – On Maintenance
               Applicant’s Request
               That the amended stormwater design be accepted by Council.
               Assessment of Request




                                                                                            Page 5 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 6

               The amended stormwater design is accepted by Council subject to an alteration to the On
               Maintenance Condition resulting from the use of poly pipes within the verge, to become Council’s
               asset.
                      On Maintenance
               2.     All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy and the draft departmental guideline for the use
                      of polypropylene and high-density polyethylene pipe for stormwater prior to commencement
                      of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      Certification that all works have been undertaken and completed in accordance with
                              the requirements of this Permit;
                      a.      As Constructed details in accordance with Council’s Planning Scheme Policy;
                      b.      Maintenance and operational manuals for all proprietary or site specific devices.
                      c.      A 12-month minimum maintenance period for civil works that would not be impacted
                              by a failure of the alternate poly pipe types.
                      d.      A 5-year minimum maintenance period for civil works that would be impacted by a
                              failure of the alternate poly pipe types. Note that works “impacted” includes, but is not
                              limited to, the road formation, pathways, kerb and channel etc. that have poly pipes
                              below.




               4.     CONSULTATION
               4.1. Referral Agencies
               Not applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •      Infrastructure Services – General advice/approval was sought from the team (Ben
                      L’Huillier) as to if an additional stormwater pit and the amended layout would be accepted
                      in principle as a Council asset considering the constraints with the alignment of the existing
                      services along the development frontage.
               5.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application OPW21/0047.02, to make a minor change to an existing approval for
               Development Permit for Operational Works for Stormwater, drainage works, earthworks and
               landscaping situated at 30 & 32 James St Noosaville Qld 4566 described as Lots 3 & 4 RP 72986,
               Council on 16 June 2021 decided to:
               A.     Approve the change.
               B.     Amend OPW21/0047 Condition 1 and Condition 45 to read as follows:




                                                                                                          Page 6 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 7

               Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.          Rev.    Plan/Document Name                          Date

                         31026-OW3.1       A       Earthworks Plan                             22/03/2021
                                                   Prepared by SCG Consulting Engineers
                                                   (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW5.1       A       Sewer and Stormwater Protection Plan        22/03/2021
                                                   Prepared by SCG Consulting Engineers
                                                   (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.1       A       Driveway and Access Plan                    22/03/2021
                                                   Prepared by SCG Consulting Engineers
                                                   (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.2       A       Driveway Levels Plan                        22/03/2021
                                                   Prepared by SCG Consulting Engineers
                                                   (AS ANNOTATED IN RED BY COUNCIL)

                         31026-SW1.1       A       Stormwater Management Plan                  22/03/2021
                                                   Prepared by SCG Consulting Engineers
                                                   (AS ANNOTATED IN RED BY COUNCIL)

                         31026-C1.1        D       Stormwater Relocation Plan                  14/09/2023
                                                   Prepared by SCG Consulting Engineers

                         31026-C1.2        N/A     Pipe Long Sections                          September
                                                                                               2023
                                                   Prepared by SCG Consulting Engineers

                         11                DA5     Landscape - Trees, prepared by Braeden 7/5/21
                                                   Constructions and as annotated by
                                                   Council

                         12                DA5     Landscape - Ground, prepared by Braeden 7/5/21
                                                   Constructions and as annotated by
                                                   Council

                         13                DA5     Landscape – Roof Garden, prepared by 7/5/21
                                                   Braeden Constructions and as annotated
                                                   by Council




                                                                                                    Page 7 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Page 8

                      On Maintenance
               45.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy and the draft departmental guideline for the use
                      of polypropylene and high-density polyethylene pipe for stormwater prior to commencement
                      of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      Certification that all works have been undertaken and completed in accordance with
                              the requirements of this Permit;
                      b.      As Constructed details in accordance with Council’s Planning Scheme Policy;
                      c.      Maintenance and operational manuals for all proprietary or site specific devices.
                      d.      A 12-month minimum maintenance period for civil works that would not be impacted
                              by a failure of the alternate poly pipe types.
                      e.      A 5-year minimum maintenance period for civil works that would be impacted by a
                              failure of the alternate poly pipe types. Note that works “impacted” includes, but is not
                              limited to, the road formation, pathways, kerb and channel etc. that have poly pipes
                              below.




                                                                                                          Page 8 of 8

Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published].pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.