Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published] · MCU21/0027.02
On Maintenance
45. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy and the draft departmental guideline for the use
of polypropylene and high-density polyethylene pipe for stormwater prior to commencement
of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
a. Certification that all works have been undertaken and completed in accordance with
the requirements of this Permit;
b. As Constructed details in accordance with Council’s Planning Scheme Policy;
c. Maintenance and operational manuals for all proprietary or site specific devices.
d. A 12-month minimum maintenance period for civil works that would not be impacted
by a failure of the alternate poly pipe types.
e. A 5-year minimum maintenance period for civil works that would be impacted by a
failure of the alternate poly pipe types. Note that works “impacted” includes, but is not
limited to, the road formation, pathways, kerb and channel etc. that have poly pipes
below.
Page 8 of 8
Document Set ID: 22627320
Version: 2, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU21 0027 02 & OPW21 0047 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.