{Sunshine Coast Checklist - Applications Involving Land

Regional Council

Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

42°

 

5

APPLICATION FORMS OR eS
1.4 Form PartaA
1.1.1 Ensure that the form is fully completed and is a current version.
1.1.2 In the case of an MCU or Op Works below the. high-water mark, owner's consent is required.

1.1.2.1 If there are multiple owners, the consent of each owner is required.

a

2

 

 

vo

 

 

1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by

signatory) or Company Seal required.
1.2. .Form4 Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.

  
 

pg A 21 Ensure-that: each of Forms BeR which are attached" are fully completed”

24 Ensure that relevant sections have been checked and/or completed with regard to referrals

2.2. Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)

“ENVIRONMENTALLY RELEVANT ACTIVITIES.

3.1. Ensure that Part G is completed if EPA referral is required.

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)

- FORM 2- REQUEST TO'CHANGE APPROVAL:

4.1 Ensure that relevant items have been checked and/or completed inctuding information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.

If over multipte properties on one or more sites, consent of Body Corporate is required.

PLANS. Ls Mt yee ane a . oo
5.1 Ensure that generally at least 6 sets of the Plan of Development 6 for Reconfiguration and Operational |
Works) accompany the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.

“SUPPORTING: INFORMATION we Bs

6.1. Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

6.3 Additionaily an electronic version is preferred w where Possible f for ease of electronic record keeping

7.1 Ensure that the application fee, as determined from the Council s adopted scale of fees,
accompanies the application or has been paid.

 

    

   

 

   

  

a

 

 

 

 

 

 

 

 

 

 

 

+

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational

Work if Jetty or if including Landscaping. :
Land Development Lot Reconfiguration applications and Operational Work not including Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

NSC g:Manduse\adminisirative processes\application checklist.doc
Full text of the other 15 pages

Page 2

 

DAS REFERRAL AGENCIES TRIGGERS (
‘Please refer to IDAS Checklist forcomplet lis’

7 Se Beta AE!

 
  
 

quent referrals)

Boo a re

YES: | .COMMENT; .

 

we BE ge Please tick 2. a

v

4

 

dye

 

Department of Main Roads (Concurrence or Advice)
¢ State Controlled Road

 

Dept Natural Resources & Water

e Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

« Environmentally Relevant Activity (for non-devolved Council as EPA)
e¢ Contaminated land
* Environmental Management/Contaminated Land Register
» UXO
* Land recently used as a ‘notifiable activity’
# Industrial land changed to sensitive uses (eg school)
« Coastal related development.
¢ Koala habitat
e Wetlands (Advice only)

 

Queensland Transport (Concurrence)
. Railway
e Public Passenger Transport

 

Energex or other responsible entity (Advice)

e Electricity Easements/Substations

 

DIP (Concurrence)

° SEQ Regional plan

 

VARIOUS

. Conservation estate (Advice)

 

 

E AGENCIES +: TRIGGERS
a tye Be
PO Bal tb

 

 

 

 

   
       

 

segs

 

 

 

Department of Natural Resources and Mines

EPA

 

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

NSC xg: Vanduse\administrative processes\application checklist.doc

Page 3

Part A, Version 3.1, 3 March 2008

idas}

RECEIVED

Part A 2 3 NOV 2009

Common details

(OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the farm for advice on how to complete this form.

 
   

 

Applicant details (The Applicant is the person responsible for making the application and need not be the owner of the land. The Applicant is responsible for ensuring the
information provided on the IDAS Application Form is correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and . *
(deciding this application. By todging this application, the Applicant incurs the: ‘obligations and responsil

approval that may be issued as a consequence of this application will be issuéd to'the Applicant,

 
 
 

  

 

 

 

 

 

Company/organisation name (if applicable) [Pite-it Pty Ltd ta Noosa Jetty Builders

 

individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)

Postal address [po Box 299, Noosaville. QLD 4566

Contact telephone number 07 5474 3480 Mobile phone number 0408 137 526 .
Facsimile number 07 5474 3480 e-mail address [email protected]

Details of the premises (ie. the land on which the development is.proposed - refer to the advice at the end of the form) « “nnn naman ae |
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is gwen to identify the premises)
Table A |f the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| “*" "Name of each local goverment atea in which the mobile and temporary ERA is proposed to operate

[1
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. {Identify each lot in a separate row.)

 

 

 

 

() [7] Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF

(ii) Q& Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the focal government.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

     

 

: Street Address , Lot on plan description *
tht Greek , Plan type and Local governrient area a (eg. Loga
No.1 No. . i Street Name and official suburbMocality name “| Post Code Lot No, a Pian Number : . ‘Caims) / .
4 7 Saltwater Ave, Noosaville QLD 4566 881 SP 102594 Sunshine Coast Regional Council
AND/ OR
Table Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a Jot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates © . . ke
ot: place each set of coorlnates i ina a separate row) Zone . Local government area
; Reference Datum (if applicable) 4." .-
; 4 * Neithing i : + Longitude, pie: tant ‘ae OG
1  oepaes
C1 wesea
LD Other -

 

 

 

 

 

 

 

 

 

 

2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

 

Name of water body, watercourse or aquifer (if known) . 8

 

 

| 1 | Noosa Waters Canal

 

Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994

[i

Table F Complete if the premises are in tidal water

[i

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

Lot on plan description for strategic port land - Port Authority for the lot

 

 

 

Name of focal government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)

 

 

 

 

 

 

 

 

Total area of premises

 

 

 

 

 

 

863.00 m? {_]hectares (Tick applicable unit)
‘Existing use of the premises . , . : " }

 

4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming ete.)

 

| 1 House |

 

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc)?
& No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
i ee . ron yee og ut o ry ° . uo“ :
[Proposal details . ve 1
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 fot residential subdivision, a bore, aquaculture)

 

 

 

New timber jetty and pneumatic boat storage device

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
oO No XX Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

‘Resource entitlement (if applicable) ‘- further information is provided in the advice section af the ‘end of the form : : !

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

& No -Gotoag O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
alfocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

\Owner's consent (if applicable) _- further information is provided in the advice section at the end of the form _|

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coasta! Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an aftachment to this form if applicable,

 

 

 

Premises Owner's namé/s * Détails of the premises owned ng » _ | Date consent
Table H and postal address {street address or lot on plan description) Owner's signature was obtained
Qevhwales AY
1 Robert Tasker 7 Topeaile-Riace, Noosaville 4566 03/11/2009

 

 

 

 

 

 

 

Sa trick
2 4A “Sen TASKER Topesiie-Blace, Noosaville 4566 Lacie 1/2009

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent mus! ipo wrovides to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, 5127 of the Corporations Act 2001 (Cwealth) detais how a
company may sign as owner. Templates for the provision of awner's consent are available on the IPA website .

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

‘Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

 

Details of the premises

. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and tand (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

° Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.

je The premises may be identified in a number of ways --

« Street address and {ot on plan are most common and will apply to most applications.

« Coordinates may provide the best means of accurately identifying the ocation of development proposed in waters, or on a relatively smal
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

° The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

° StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port and) and the Queensland Transport (Ports) website.

. “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below “high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a focal government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the [PA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

° Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedute 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Intearated Planning
Regulation. Section 3.2.1(10)(a){il) states an application cannot be taken to be properly made without the required evidence.

 

. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.

. For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.

. Evidence may be required from more than one Department responsible for a State-owned resource, ¢.g. from the Environmental Protection
Agency for quarry material below high. water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark. ,

Owner's consent

° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the

application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.

. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

° Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.

. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

. The Building and Construction industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

. The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject fo
the PLSL tevy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

. ‘The PLSL tevy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
‘ The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and

Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qid.gov,au. For further information contact QLeave (Tel: 1800 803 481 Web:
www.leave.qld.gov.au )

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997

Part E, Version 3.2

“fies

 

Building &/or operational works assessable
against a planning scheme’

 

[Nature of the works *

4. Nature of work that requires assessment against a planning scheme:

 

[7] Building work - Complete Table A {XJ Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
(CL) Roadworks (J Stormwater ((] Water infrastructure [-] Sewerage infrastructure
(J) Landscaping (] Earthworks ([] Drainage Works L] Signage
(Clearing vegetation under the planning scheme Other - Specify below

 

Timber Jetty and pneumatic boat storage device

 

 

 

(ji) What type of approval is being sought? (NOTE: If you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit [[] Preliminary approval 1] Both (Specify beow)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
&JNo [[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

[XJ No [[] Yes - Complete Table B(a)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 22,882

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Mandatory Information” : —_ 7
3. Confirm that the following mandatory information accompanies this application
Confirmation of bof loa
lodgement Method of ladgement
fications i icable, showi tocation of th fi
Pans, andspeciicatons if applicable, showing the nature and location of the proposed works (including the [XJ Confirmed — | over the counter
OFFICE USE ONLY
Date Received Reference Numbers [

 

 

 

 

Advice for completing Part E

 

General advice
¢ Part Amust also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

Qi

 

‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development fo occur

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part E, Version 3.2

' This form is also used for building or operational work assessable against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme is
mentioned, take it to mean the land use plan for the airport land.

Page 8

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

[is

 

 

Assessment Checklist

 

IDAS Development Application Form 4 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 ig made up of various Parts.

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application. : ,

’ Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.

 

2 a ee

b |_ = Section: 4 -and-all-otherrelevant'séetions Of thie IDAS ‘ssessment Checklist, as identified in the Table below, must be
‘completed for all development applications except those proposed on land In an urban development area, or for building work.
requiring assessment against the Building Act 1975 only.

For more information about development applications on land in an urban. development area, refer to www.ulda.gid.gov.au.
: For more advice about building applications. refer to Part B of the IDAS Application Form.

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

 

 

Does the application seek approval to make a material change of use of the premises?

tyes - complete Section 2 of this checklist LiYes |EXINo

 

Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single (Yes |BINo
local government area assessment is by the local government.

 

Does the application seek approval to carry out operational work?

 

 

ityes - complete Section 4 of this checklist buYes |LJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? [Yes |)No
if yes - complete Section 5 of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?

if yes - complete Section 6 of this checklist [D1Yes |[KJNo

 

Does the application seek approval to carry out building work requiring assessment against a local government planning .
scheme? fe Yes |LINo
if yes - complete Form 7 Part E of iDAS Application Form 1. Assessment is by the local government.

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes i{XJNo
Assessment is by a building certifier

 

Do you wish the application fo be assessed against a superseded planning scheme?
if yes - complete Form 1 Attachment 1 CYes |BINo

 

Is the application for development completely or partly on Caims and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?

ifyes - Assessment is by the Department of infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 ifthe |L]Yes i/BNo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
local government as Advice Agency.

 

 

 

 

 

Page 9

INTEGRATED PLANNING ACT er IDAS Assessment Checklist, Version 22

Ss SECTION, 4: ‘Seaton 1 -must bé completed forall appl

TERTAGES a co ° " ¥ * : ; ,
441A Is any parto of the proposal intended to be carried out on a Queensland heritage place under the @ Queensland Heritage Act 19927

BX] No-Goto17a = [[] Yes

IPA, schedule & part 1. table 5, item 2: 1P Regulation. schedule 2. table 2, tem 18

 

 

    

1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?

[XJ] No-Gotoar2  [[] Yes
IPA, schedule 8, part 1, table 5, item 2A, IP Regulation, schedule 1, part 2, table 5, item 2.

 

[REMOVING QUARRY MATERIAL; WILDRIVERAREA 7. Lae : eae o™ wy
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?

[X] No-Gotoa1.3 [[] Yes

IPA, schedule 8, part 1, table 5, item 1: 1P Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, able 5, item 2 (wild river area); Water Act 2000.
section 966C; Wild Rivers Act 2005, section 43A

 

ae en

 

(ENVIRONMENTALLY.RELEVANT ACTIVITY; WILD RIVER AREA = p<" >

 

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoai4 {—] Yes

IPA, schedule 8, part 1, tabla 2, ilem 1; IPA, schedule 8, part 1, table 5, items 3 and 4; IP Regulation, schedule 2. table 2, items 1 and 23; Environmental Protection Act 1994, section
73AA (wild river area); Wild Rivers Act 2005, section 434; relevant wild nver declaration: Wild Rivers Cade.

    

 

\WITHIN THE LIMITS OFA PORT.

 

 

 

 

1.4 Is crn part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
XJ No - Goto 01.5
A Yes
IP Regulation, schedule 2, table 2, tems 15 and 16
iDECLARED FISH HABITAT AREA sine tach gh eck My te By vege ce dl
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

BX] No - Goto. 01.6

J Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation. schedule 2, table 2, itein 26

 

    

 

(COMMUNITY. INFRASTRUCTURES" me Te er
1.6 ls any part of the premises designated for community infrastructure?

No - Goto Q4.7

(] Yes

IP Regulation, schedule 2, table 3, item 7

 

   

WASTE WATER MANAGEMENT

   

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

DX] No - End of Section? [_] Yes
IP Regulation, schedule 2, table 3, item 5

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

SECTION A : Section 4 must be completed when the application seoks approval to carry out op rational work: 7 .

 

 

 

 

 

 

iPLANNING SCHEME" wr " ee ne nl
44 is the proposed operational work assessable under any State planning regulatory provisions?
[X}No [J Yes
If no, is the proposed operational work assessable under the planning scheme?
(J No - Goto. 04.2 DX] Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below
‘STATE-CONTROLLED ROAD nr . " : 7

 

4.1.1 4s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No  [] Yes

If no, is the proposed operational work for filing or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

DQ No -Gotoo4.1.2

Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedule 2. lable 3, item 3; IP Regulation, schedule 2, table 3. item 1(b)

ACID SULFATE SOILS.

4.1.2 Is any of the operational work proposed in a local government area listed‘! in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

&X] No -Goto041.3 (Yes
4A purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

 

 

 

1P Reguiation, schedule 2, table 3, item 4; State Planning Policy 2/02; Planning and Managing Development involving Acid Sulfate Soils, section 3.6
iEASEMENTS AND SUBSTATIONS . : . : oO . , 1
4.1.3 Is any of the proposed operational work for filling or excavation?

 

[X] No -Goto04.1.4

CI Yes

IP Regulation, schedule 2, table 3 item 10{a); 1P Regulation, schedule 2, table 3, item 10(b)

4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

DX] No -Gotoas1.5 [—] Yes
IP Regulation, schedule 2, table 3, item 17

[PUBLIC PASSENGER TRANSPORT ,

 

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

DX} No- Go to 04.1.6 LD Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation. schedule 2, table 3, tem 14

 

 

 

[RAILWAY SAFETY AND EFFICIENCY }
4.1.6 1s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

4] No- Go to 04.1.7 oO Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2. table 3, item 15

IKOALA CONSERVATION (outsidé SEQ urban footprint) ey

ihe

 

4.1.7 |s any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
DJ No -Gotoo42 ([_] Yes

IP Regulation, schedule 2, table 3, item 19

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

=

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and ingle ,

development. for:the:purposes of the Wild Rivers. ‘Act 2

‘code to that type: ofdevélopment. |.

   
  
 
   

 

 

 

ARI

4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[X] No -Gotoos3 [] Yes

IPA, schedule 8, part 1. table 4, item 2: IP Regulation. schedule 1, part 2. table 5, item t(c)
Wild Rivers code (Note: the code does noi currently contain applicable provisions for residential. industrial or commercial development inside a designated urban
area)

 

 

'KOALA CONSERVATION (Inside SEQ urban-footprint) je Tote Re te a 4
4.3A ts any part of the premises in an interim koala habitat protection area?

BX] No -Gotoa438 {_] Yes
IP Regulation, schedule 2, table 2, item 34A

 

\VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA -

4.3B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

No -Gotoas4 ((] Yes

IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing); iP Regulation, schedule 2, table 2, item 34 (koala
conservation); iP Regulation. schedule 1, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A (vegetation
clearinghwild river area); Wild Rivers Act 2005, sections 31F and 434

   

 

TAKING OR INTERFERING WITH WATER; WILDRIVERAREA oe ten agurmemeel

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

[X] No -Gotoas5 [[] Yes - Answer (a) and (b) below

JPA, schedule 8, part 1, table 4, items 3(a). IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, items 3 and 3A; Water Act 2000. section 9664 (wild river
area); Wild Rivers Act 2005. section 434; relevant wid river declaration: Wild Rivers Code

45 {s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
EX] No Gotoa46 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3fb); IP Regulation, schedule 2, table 2, item 8; 1P Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[EX] No -Gotoa47 {_] Yes - Answer (a) and (b) below
IPA, schedule 8. part 1, table 4, item 3(c){i): 1? Regulation, schedule 2, table 2, item 8; !P Regulation. schedule 1. part 3. table 4. item 3; Water Act 2000. section 966A (wild river area);
Wild Rivers Act 2005, section 43A: relevant wild river deciaration: Wild Rivers Code.

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?

[XJ No -Gotoase [(] Yes

IPA, schedule 8, part 1, lable 4, item 3{c}{ii); P Regulation, schedule 2, table 2. item 8: iP Regulation, schedule 1. part 3. table 4, item 3
Water Act 2000, section 966A {wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?

[X] No -Gotoaz9 [_] Yes - Answer both (a) and (b} below

IPA, schedule 8, part 1, table 4, items 3(¢}(i) and {0}: IP Regulation, schedule 2. table 2. item 9: 1P Regulation. schedule 1, part 3, able 4, item 3A; Water Act 2000, section 9668 (wild
siver area): relevant wild river declaration: Wild Rivers Code.

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

49 ls the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
& No £0 Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% Ba No (J Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8. part 1, table 4. item 4: IP Regulation, schedule 2. table 2. item 10

 

TIDAL WORK; WILD RIVERAREA

& a . 2a

ad

 

4.10 is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

DX] No -Gotoa411 [(] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 5: IP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)

iCOASTAL MANAGEMENT, DISTRICT; WILD RIVERAREA

 

 

 

4.14 Is any of the operational work proposed to be carried out within a coastal management district?
DX] No -Gotoas12 [[] Yes

IPA, schedule 8, part 1, table 4, item 5: IP Regulation, schedule 2, table 2, items 12 and 14; iP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area); Wild Rivers Act 2005, section 43A

WATERWAY BARRIERWORKS; WIDRIVERAREA TY

als :

 

   

4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[XJ No -Gotoas13 (J Yes

IPA, schedule 8, part 1, table 4, item 6: IPA, schedule 8, part 2. table 4, item 2; Fisheries Regulation 1995 113A (seif-assessable codes): IP Regulation, schedule 2. table 2, item 28; IP
Regulation, schedule 1, part 3, table 4. item 6: Fisheries Act 1994, section 76D (wild river area}: Wild Rivers Act 2005. section 43A

 

 

[DECLARED FISH HABITAT AREA; WILDRIVERAREA 3. - "| ay
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto 04.14

(Yes

IPA, schedule 8, part 1, table 4, item 7; IPA, schedule 8, part 2, table 4, item 3: Fisheries Regulation 1995 s113A (self-assessable codes); IP Regulation, schedule 2, table 2. item 25; {P
Regulation, schedule 1, part 3, table 4, item 7; Wild Rivers Act 2005, sections 43A; Fisheries Act, section 76DC (wild river area).

 

toi

te *

 

(REMOVAL, DESTRUCTION OR DAMAGE OF AMARINE PLANT; WILORIVERAREA a |

4.14 \s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

[IX] No -Gotooa15 [[] Yes

IPA, schedule 8. part 1. table 4, item 8; IPA, schedule 8. part 2, table 4. item 4: Fisheries Reguiation 1995 $113A (self-assessable codes); IP Regulation, schedule 2, table 2, item 29: iP
Regulation. schedule 1, part 3, table 4, item 8; Fisheries Act 1994, section 76DB (wild river area): Wild Rivers Act 2005, section 43A: refevant wild river declaration; Wild Rivers Code.

WILORWERAREA

 

ae a Dita

   

4.415 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

EX} No -Gotoast6 ([[] Yes
IPA, schedule 8, part 1, table 4. item 10; IP Regulation, schedule 2. table 2, Rem 37; Wild Rivers Act 2005, sections 42. 43A

 

 

ISTATE-CONTROLEED. ROAD «crt

ke

 

Bw hae onl
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsections [_] Yes

IP Regulation, schedule 2, table 2. tem 3

 

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims ail liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

 

Page 14

 

Sunshine Coast LAND USE SECTION FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 410
The Noosa Plan Documentation | 111

APPLICATION FEES
Material Change of Use - Code/impact MCU

Consistent — , , : 521
_ _ Inconsistent , 521
Assessment under Superseded Planning Scheme ' oo 521
Modification. to a Development Permit. MOD OP ‘ ' 524
Extension of a Currency-Period : 5 = _— 521
* Lot Reconfiguration , RECONFIG ~ §21
. _, Bidg Work assessable against the Planning Scheme - §21 Bowie
PRE. LODGEMENT. REVIEW : : : - * .
Half Hour, . ec . 522
© One Hour - oa 522 .
i oy
"ADVERTISING " .
. Purchase Advertised Applications : . 523
JETTIES : ; ,
" Jétty Application Fee G20 524
JettyBond)- 7 & . f Joo _ 51 J
. y . vs : : ms, : . (Category 4) Che
BONDS co . . to _ . ot vot 1
, Performance Bond . . . . 51 ’ :
, ‘ (Category 9)
SEARCH FEE / 4 : /
Search of Land Use Section file ., 4 , : . 112.
Liquor Licensing Request, me se .. 143 é

 

~ TOTAL $ IyZovog _ y
NAME: KJ o AL ~1askey
ADDRESS: | J  Jeoosa. fet, Buy tes
: PY Boe 228 NIDO SAV CE ‘stele
FILE NO: CA le SE DATE:
RECEIPT NO: . oT Sa 26 " Signature of TP Officer:

AUTHORITY NO:

 

dome stl

Page 15

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

4

 

 

JOPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

Page 16

 

 

   

\\_ MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD _

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

DECK
RL 1.0 AHD
SINGLE USER, PRIVATE SEO
NOVE Onan CARR RC
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa § ; |
ELEVATION 1 | 4
MAXIMUM MOORED VESSEL - 5m 0 :
BERTHING VELOCITY -0.5msec | || | ALL PILES SHALL BE APPROVED HARDWOOD | i ELEVATION 2
ALL PILES SHALL BE INSTALLED IN ACCORDANCE 120
oi, ———
\ LOT 881 sree To were PILEAT PTY LTD
\ seam , tbxtoke PE 1 NOOSA JETTY
\ J Screws @ 460 chs BUILDERS
|. WITH 28810 63 BOLT pL R & A TASKER
: ; PROPOSED JETTY
TYPICAL SECTION & BOAT STORAGE
= LOT 881 (No.7)
avo 1800 woxrsmo—_t 7 SALTWATER AVENUE
| umes NOOSA WATERS
ne mee ef son ficrden
s | JETTY \ J} 2200 Ma MARIE HD POLE & Associates
=) g vnosmanl WITH AS 2160 - PILING CODE ACN 010 263 877
1 SOSTING JETTY Serecturel / Ch Design Engiscers
REAL PROPERTY SS by shOwonsHen DETAIL Pumas Aewnse 1 PO fou 208
DESCRIPTION 1800 120 Tewendin
rt A. nanan, Fac 07 54487172
LOT 881 notes: Emait [email protected]
SARIN WEVBA \ \ 1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE DURABILITY CLASS 1 OF APPROVED SPECIES
COUNTY MARCH \ \ | AND HAVE A STRESS GRADE OF F14 MIN. :
FRAMING LAYOUT 2 \ | 2. UNLERS NOTED OTHERWISE ALL CONSTRUCTION SHALL COMPLY WITH THE ENVIRONMENTAL |
SITEPLAN iaikatecimocata son wowace eee” Ln lrera inate
12200 ‘ I 4 TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR RINGED. WORKING DRG

 

 

 

\ &. DIMENGIONS AND LEVELS SHALL NOT BE SCALED FROM THE DRAMINGS. “09/1 79-1 AMEDOUENT

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1658 - Operational Works - Jetty & Boatlift [As Published].pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.