Skip to the record
Search everything, all in one place.

Council archive · source document

09/1658 - Operational Works - Jetty & Boatlift [As Published] · 142009.1658

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Part E, Version 3.2

“fies

 

Building &/or operational works assessable
against a planning scheme’

 

[Nature of the works *

4. Nature of work that requires assessment against a planning scheme:

 

[7] Building work - Complete Table A {XJ Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
(CL) Roadworks (J Stormwater ((] Water infrastructure [-] Sewerage infrastructure
(J) Landscaping (] Earthworks ([] Drainage Works L] Signage
(Clearing vegetation under the planning scheme Other - Specify below

 

Timber Jetty and pneumatic boat storage device

 

 

 

(ji) What type of approval is being sought? (NOTE: If you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit [[] Preliminary approval 1] Both (Specify beow)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
&JNo [[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

[XJ No [[] Yes - Complete Table B(a)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 22,882

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Mandatory Information” : —_ 7
3. Confirm that the following mandatory information accompanies this application
Confirmation of bof loa
lodgement Method of ladgement
fications i icable, showi tocation of th fi
Pans, andspeciicatons if applicable, showing the nature and location of the proposed works (including the [XJ Confirmed — | over the counter
OFFICE USE ONLY
Date Received Reference Numbers [

 

 

 

 

Advice for completing Part E

 

General advice
¢ Part Amust also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

Qi

 

‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development fo occur

 

 

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1658 - Operational Works - Jetty & Boatlift [As Published].pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.