Geotech
PROPOSED UNIT DEVELOPMENT
27 BOTTLEBRUSH AVENUE, NOOSA HEADS
TABLES
Table 1: Summary of Subsurface Profiles ........................................................................................................................... 5
Table 2: Stability Risk Levels .............................................................................................................................................. 7
Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007) ......................................................................... 8
Table 4: Retaining Structure Design Parameters .............................................................................................................. 13
TEXT FIGURES
Text Figure 1: Layout plan (LHS) and cross-sectional view (RHS) of proposed development, courtesy of Zest ................. 1
Text Figure 2: 2021 aerial image of the site and immediate surrounds (courtesy Nearmap imagery)................................. 2
Text Figure 3: View of the site looking east from Bottlebrush Avenue ................................................................................ 3
Text Figure 4: Panoramic view of the Bottlebrush Avenue street frontage, looking east..................................................... 3
T
Text Figure 5: Dilapidation in existing blockwork walls surrounding the residence ............................................................. 3
Text Figure 6: Site plan showing ground surface contours (courtesy Noosa Council ‘Intramaps’) ...................................... 4
Text Figure 7: Extract of Gympie Special 1:100,000 Geology Map ..................................................................................... 4
Text Figure 8: Extract from NSC landslide hazard overlay mapping ................................................................................... 6
AF
Text Figure 9: Slope/W output for long term conditions...................................................................................................... 9
Text Figure 10: Footing depth required to prevent undermining....................................................................................... 12
FIGURES
Figure 1: Site Plan
APPENDICES
R
APPENDIX A
Borehole & DCP Reports & Explanatory Notes
APPENDIX B
AGS Guidelines - Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction
D
APPENDIX C
Limitations
10 November 2021
Report No. 21286-001-Rev0 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.