Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Attachment C Current Development Approval.pdf

of 105

Page text read automatically using OCR, there may be inaccuracies

                                                                                                  BHA Report for17-19 Hofmann Drive, Noosaville




         Performance Outcomes                       Acceptable Outcomes                         Compliance

         PO5                                        AO5                                         N/A
         Public safety and the environment are      Hazardous materials are not
         not adversely affected by the impacts of   manufactured or stored in bulk in a
         bushfire on hazardous materials            bushfire hazard area.
         manufacturing or storing in bulk.

         PO6                                        AO6.1                                       Suitable and safe access and ingress
         Roads provide for easy and safe            The road layout provides for through-       provided for Emergency services
         evacuation of residents of premises        roads and avoids cul-de-sacs and dead-      personnel via Hoffman Drive
         and access by emergency services.          end roads.
                                                    OR
                                                    AO6.2
                                                    The development has a perimeter road
                                                    reserve with a minimum width of 20
                                                    metres and maximum gradient of
                                                    12.5%.
                                                    OR
                                                    AO6.3
                                                    Cul-de-sacs or no-through roads are
                                                    provided with fire trails
                                                    or access easements, which are capable
                                                    of being navigated by conventional
                                                    vehicles and which link to through
                                                    roads.
                                                    AO6.4
                                                    Safe access and egress is available at
                                                    all times to all of the development for
                                                    emergency vehicles and personnel.
                                                    AO6.5
                                                    Where an emergency access point is
                                                    required, it complies with the
                                                    relevant works codes and PSP6
                                                    Engineering Design Standards.




       + Bushfire assessments
       + Property vegetation assessments
       + Site planning for bushfire
       + Property management for bushfire                                                 Bushfire Planning Specalists - qldbushfireplanning.com.au
Document Set ID: 21969697
       + Bushfire management plans
Version: 2,
         1, Version Date: 21/06/2022
                           20/06/2022

Log in to download the original (Attachment C Current Development Approval.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.