                                   Form 6 - Decision Notice
                                   INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2006/402                           Date of Decision:       23 June 2006

1.     APPLICANT DETAILS

 Name:               Nearcastle Pty Ltd

 Postal address:     CARE Middap Ditchfield Pty Ltd
                     Cnr Mary & Thomas Street
                     NOOSAVILLE QLD 4566


 Phone no:           5474 0877              Fax no:       5475 0906

2.     PROPERTY DESCRIPTION

 Street address:     54 Peregian Esplanade, Peregian Beach

 Real property       Lot 338 P 93113 Parish of Weyba County of March
 description:

3.     OWNER DETAILS

 Name:               Nearcastle Pty Ltd

 Postal address:     PO Box 29
                     NOOSAVILLE QLD 4566

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                    Basis
 Environmental              GPO Box 2771, Brisbane Qld 4001                            Concurrence Agency (UXO
 Protection Agency                                                                     area)

5.     APPLICATION TYPE

 Development                         Development Details                     Preliminary          Development
                                                                              Approval               Permit
 Material Change of Use              Multiple Housing Type 2 - Duplex            Yes                  No

6.     DECISION DETAILS

Council decided to approve the application and grant a Preliminary Approval, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

Not applicable.
Full text of the other 14 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    2 of 15

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.               Conditions from the
Environmental Protection Agency, as a concurrence agency are also attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit for Material Change of           Type 2 - Duplex
 Use (Code Assessable)

 Development Permit for Building Works               Duplex Dwelling

 Preliminary Building Works Approval                 Demolition relocation or removal of a building
 (Assessable against the Planning Scheme)

 Development Permit for Operational Works            Landscaping, Car parking, Access, Frontage               works,
                                                     Stormwater drainage and Filling of the site

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                                 Date:       28/06/2006




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                3 of 15




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


Land Use
1.    The applicant is required to lodge a further application for Material Change of Use in order to obtain a
      Development Permit that will be assessed against the conditions of this development approval.

2.    The development shall not exceed 8 metres and 2 storeys in height from Natural Ground Level.

3.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are numbered and titled SD02 Site Plan, SD03 Garage / Entry Level,
      SD04 First Level, SD05 Second Level, SD06 Roof Plan, SD07 Elevations 1, SD08 Elevations 2, SD09
      Sections, SD10 GFA Calculations, SD11 Site Cover and Landscaping prepared by Middap Ditchfield
      Architects P/L and dated 23/01/06 and as may be amended by these conditions.

4.    The open space and setback areas are to be landscaped in accordance with The Noosa Plan’s
      Landscaping Code and Council’s Policy on Landscaping Guidelines and a properly prepared landscape
      plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be
      completed prior to the premises being occupied and maintained at all times thereafter.

5.    All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the
      fencing setback 2 metres. The area of land between the fence and the front property boundary shall be
      densely landscaped to screen any fencing from the street.

6.    Existing trees on the site and within road reserves are to be retained, except where required to be
      removed due to building operations or the conduct of the approved use. These landscape plans required
      to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be
      retained.

7.    The requirements of this development approval are to be effected, prior to the use of the premises.
      Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
      compliance with conditions.

8.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted,
      to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
      Operational Works. The cash bond or trading bank guarantee will be returned on performance of the
      conditions of approval less any costs incurred by Council in respect of enforcing performance of this
      permit.

9.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
      as open structures.

10.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
      Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
      and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
      comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
      exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
      requirement.

11.   All hot water systems installed shelle be either solar systems; electric heat pump systems: or gas systems
      (LPG or natural).

12.   The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
      obtaining a Development Permit for Building Works.

13.   The Preliminary Approval for a material change of use of premises and operation works lapses if the use
      has not happened by 23 June 2010, unless an application to extend the currency is approved by Council.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                4 of 15


Building Services
14.   A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
      with Council at completion of the work confirming compliance with the maximum building height above
      natural surface, required by the provisions of the Planning Scheme.
Land Development
      Vehicle Access
15.   A vehicular access driveway to serve the development shall be constructed from the Peregian Esplanade
      frontage of the site with a maximum width of 4.5m.

16.   The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
      vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
      without any level difference. Should any driveways be constructed to grades that do not comply with
      AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do
      comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
      footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
      Carparking
      Off Street
17.   Carparking shall be provided within the site as shown on drawing number 0540-SD03b dated 23 January
      2006 by Middap Ditchfield, except as modified herein.

18.   The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A
      with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
      clearance (headroom) at any point of 2.2m.

19.   All carparking shall be kept, maintained and line-marked in a condition fit for use.

      Park Contributions

20.   A Park contribution of $2,850 towards the acquisition of additional parkland or the improvement of existing
      parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit
      for Operational Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements
      for Development Applications. This amount will be subject to variations in the Consumer Price Index, All
      Groups Brisbane from March 2006 until the date of payment.
      Frontage Works
21.   The full length of the Peregian Esplanade frontage of the development site shall be upgraded by providing
      kerb & channel, bitumen road widening and landscaping improvements to the footpath. All associated
      and ancillary work including pavement correction to the existing pavement, drainage works, modification
      of the footpath, and adjustments to the existing infrastructure shall be undertaken to complete the
      roadworks widening.
      In this regard, plans detailing this work shall be prepared and submitted to Council for approval prior to
      obtaining a Development Permit for Operational Works.
22.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Peregian
      Esplanade frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping
      Guidelines. Grass shall be couch, free of weeds.

23.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
      paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
      prior to commencement of the use permitted by this permit.
      Pathway Contributions
24.   A pathway contribution of $641 towards external major pathways, in accordance with Planning Scheme
      Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to obtaining a
      Development Permit for Operational Works. This amount will be subject to variations in the Consumer
      Price Index, All Groups Brisbane from March 2006 until the date of payment.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  5 of 15


      Stormwater Drainage
25.   All stormwater drainage shall be collected on site and discharged so there is no net increase in
      stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
      to Council’s kerb & channel street drainage system in Peregian Esplanade. Plans of the drainage design
      shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining
      a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second.
26.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 3000 litres per dwelling) that is installed to ensure water from the tank can be used for external
      uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to
      be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system.

27.   To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
      from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
      down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
      Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through a single
      underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
      shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme for the
      development and a copy of this shall be provided for Council’s records prior to commencement of the
      approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
28.   All site stormwater drainage shall be by means of a gravity system.
      Sewer Mains
29.   The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

30.   The existing sewer manhole that is located in the adjoining property at the rear of the site and the ‘zone of
      influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the
      finished surface level) shall be accurately located and determined by a licensed Surveyor and shown on
      all plans submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
      damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
      exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ and as
      such the applicant shall amend Operational Works plans including Building plans to ensure compliance.
      Town Water Supply
31.   The site shall be connected to Council’s existing town water supply and be constructed in accordance with
      Council’s standards and requirements at no cost to Council.

32.   Each water connection to the water reticulation system shall extend to the property boundary and be
      metered. Where multiple units are served by a single service, multiple water meters to each individual
      unit shall be installed. All fees for the supply of water meters shall be paid to the Council.
      Headworks Contributions
33.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
      on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
      the rates applicable at the time of payment. An estimate only of the contribution rates under the current
      policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
      All Groups Brisbane from March 2006 until the date of payment.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   6 of 15


      Water Supply          $4,439
      Sewerage              $7,008
      TOTAL                 $11,447
      All headworks contributions must be paid prior to the issue of a Development Permit for Operational
      Works.
      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
      contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
      In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
      the contribution or trading bank guarantee will be returned.
      Earthworks
34.   Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
      structures that border the development site. Fences that are affected shall be replaced prior to the
      Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be
      clearly shown on the plans submitted for Operational Works approval.
      Site Stability
35.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
      soil classification, establish whether any measures are required to protect the stability of adjoining
      buildings and/or structures, and make recommendations on the type of foundation system(s) best suited
      for the proposed development. This information shall be submitted to the Council for assessment and
      approval prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
36.   Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
      control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
      waste, will be necessary.
     In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
     to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
37.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be submitted in
      conjunction with an application for a Development Permit for Operational Works. In this regard a
      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
      with any application for Operational Works.

38.   Digital detailed design drawings and calculations shall be submitted with any application for a
      Development Permit for Operational Works in respect of roadworks and stormwater drainage works. To
      avoid conflict with underground pipes or services, all existing and proposed services required by the
      development shall be shown on the plans.

39.   To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
      in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
      available at www.adac.com.au).

40.   Any damage caused to any public utility during the course of construction shall be repaired to Council’s
      standards and at no cost to Council.

41.   Any alteration of any public utility or other facilities necessitated by the development of the land or
      associated construction works external to the site shall be at no cost to Council.

42.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
      be covered to prevent materials including dust being windblown from the vehicle.

43.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
      intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
      and structures. All of which shall be submitted to Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage structures,
      finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
      As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
      www.adac.com.au).




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                7 of 15


      Approval of works shall not be granted until all As Constructed information has been supplied and
      accepted by Council.
Environmental Health
44.   Noise emission from swimming pool and spa equipment (including heating equipment) shall comply with
      the following requirements:

      44.1. The equipment shall be installed and located in a manner that prevents excessive noise in
            accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
            spot fines) may apply for offences.

      44.2. A person must not use equipment on any day if it makes or causes noise to be made –

             44.2.1.    From 10pm to 7am: Which is audible outside the most exposed part of an affected
                        building

             44.2.2.    From 7am to 7pm: More than the lower of either –

                               50 dB(A)

                               5 dB(A) above the background noise level

             44.2.3.    From 7pm to 10pm: More than 3 dB(A) above the background noise level.

45.   Noise emission from air conditioning equipment shall comply with the following requirements:

      45.1. The equipment shall be installed and located in a manner that prevents excessive noise in
            accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
            spot fines) may apply for offences.

      45.2. Submission of written certification from a suitably qualified person confirming that the noise levels
            comply when measured at either the residential boundary or outside the most exposed part of an
            affected building, whichever is the closest to the equipment. This is required immediately after
            installation of the equipment and prior to any occupation of the building, and in a format approved
            by Council. This assessment must take into account noise from any other fixed equipment on the
            property e.g. swimming pool pump, heating equipment, that may increase the overall noise level
            emitted.

      45.3. A person must not use equipment on any day if it makes or causes noise to be made –

             45.3.1.    From 10pm to 7am: More than the lower of either –
                                40 dB(A)
                            
                                3 dB(A) above the background noise level
                            
             45.3.2.    From 7am to 7pm: More than the lower of either –
                                50 dB(A)
                            
                                5 dB(A) above the background noise level
                            
             45.3.3.    From 7pm to 10pm: More than 3 dB(A) above the background noise level.

46.   Noise from building works associated with residential development shall comply with the following –

      46.1. Limited to between 7:00am to 6:30pm Monday to Saturday.

      46.2. All reasonable measures are taken to minimise noise emissions.

      46.3. Not permitted on Sunday or public holidays.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                           8 of 15




                                    Concurrence Agency Conditions -
                                    Environmental Protection Agency
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION




<




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                           9 of 15




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                           10 of 15




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                                           11 of 15




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 12

NOOSA COUNCIL IDAS Development Application Decision Notice                                           12 of 15




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 13

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  13 of 15



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The applicant is informed that approval of this development application will trigger an Infrastructure
        Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
        amount of $993 and is subject to variations in the Consumer Price Index, All Groups Brisbane from March
        2006 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
        Chapter 5 of the Integrated Planning Act 1997

2.      The applicant is informed that payment via credit card transaction will not be an acceptable method of
        payment for development contributions conditioned in this permit or for infrastructure charge notices
        issued separately.

3.      The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
        boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
        obtaining a Development Permit for Building Works.

4.      Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as amended)
        and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the
        pool enclosure is not permitted.

5.      Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
        operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
        accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
        Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
        requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
        works must be submitted to Council with the lodgement of any application for operational works over the
        site.

6.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
        No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
        makes or causes audible noise to be made from the building work:-

        6.1.   On a Sunday or public holiday, at any time; or

        6.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
        A maximum penalty of $1,500 applies to an offence under this legislation.
7.      The development should be undertaken and operated in a manner that causes no detrimental effect upon
        the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
        hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
        with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
        12 – Control of Nuisances.

8.      In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
        concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
        reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
        fines apply for such offences.




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 14

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        14 of 15



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Page 15

NOOSA COUNCIL IDAS Development Application Decision Notice                                           15 of 15

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




SCRC c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80b781d\@[email protected]

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_402 SUPERSEDED Decision Notice [As Published].pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.