Original source · versioned page text
Hydraulic Assessment_compressed
• Early connection of roof water downpipes
• Compaction of backfilled trenches
• Revegetation and stabilization of the site
OPERATIONAL PHASE
As demonstrated on the proposed layout, large open zones allow a natural buffer from each cabin to the creek
line. This buffer along with the proposed rainwater tanks would deem to comply with the stormwater quality
requirements of the Noosa Council.
Page 15 of 17
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.