Original source · versioned page text
Hydraulic Assessment_compressed
PROPOSED DEVELOPMENT
The proposed development will consist of 4 glamping style tents/cabins with a driveway connection to each
from the main property entrance. The cabins will be located in the existing cleared areas on the property and
linked via a single access driveway. The existing concrete culvert crossings over the creek will also be utilised
to limit disturbance to the riparian area.
Each cabin will be connected to a rainwater harvesting tank for water re-use and the tanks will discharge via a
level spreader to the surrounding grassed area and discharge as sheet flow to the creek. This system will be
clear of the wastewater effluent disposal system (refer Ground Drill Effluent Disposal Report 22/388 dated
11.11.22).
The proposed layout has been designed to provide privacy for each user while minimising the environmental
footprint by utilising existing cleared areas and vehicle access locations across the waterways. The proposed
layout is shown in Figure 4 and a detailed concept of the access driveways and unit localities are provided in
the civil plans prepared by BAX Engineering (Ref: 304-001) in Appendix B.
Figure 4 – Proposed Nature Based Tourism Layout
Page 8 of 17
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.