Skip to the record
Accept no substitutions.

Council archive · source document

ECM_22343539_v1_Stormwater Management Report · 132000.200173.1

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                 Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of Noosa
                 Council.

                 5    CO N CLU S IO N


                 This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely
                 impact the receiving environment.

                 The proposed lawful point of discharge for the roofwater from the proposed development shall be The
                 Esplanade kerb and channel via a new kerb outlet. Stormwater detention is not considered to be
                 required as the proposal is for a residential dwelling on an existing lot without substantial change in
                 impervious area fraction. Roofwater runoff from the development site will need to be collected on site
                 and directed to the kerb and channel at the build phase to ensure no adverse impacts to neighbouring
                 properties as a result of the development.

                 The development site is considered to be flood free.
                 Stormwater treatment should be managed through the implementation of best management practices
                 on site. Based on the scale of the proposed development, and typical pollutants produced, these
                 measures are considered adequate.
                 By implementing the proposed stormwater management system, and providing adequate maintenance,
                 the downstream environment and neighbouring properties will not experience any adverse deterioration
                 of water quality as a result of the proposed development.




                                                                                                                      7
Document Set ID: 22343539
Version: 1, Version Date: 16/03/2023
Log in to download the original file

ECM_22343539_v1_Stormwater Management Report.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.