Original source · versioned page text
ECM_22343539_v1_Stormwater Management Report
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
CO NT E NT S
1 INTRODUCTION ..................................................................................................................... 1
2 SITE DESCRIPTION ............................................................................................................... 1
2.1 Location and Land Use ............................................................................................................ 1
2.2 Lawful Point of Discharge ........................................................................................................ 2
2.3 Upstream Drainage Connection .............................................................................................. 2
2.4 Flooding ................................................................................................................................... 2
3 STORMWATER QUANTITY MANAGEMENT ........................................................................ 2
4 WATER QUALITY MANAGEMENT ....................................................................................... 2
4.1 Operational Phase ................................................................................................................... 2
4.2 Construction Phase ................................................................................................................. 3
4.2.1 Design Objectives .................................................................................................................... 3
4.2.2 Erosion and Sediment Control ................................................................................................. 5
4.2.3 Maintenance and Monitoring Requirements ............................................................................ 6
5 CONCLUSION ......................................................................................................................... 7
6 APPENDICES ..................................................................................................................... A-1
Appendix A – Erosion Hazard Assessment ........................................................................................ A-1
Appendix B – Preliminary Engineering Plans ..................................................................................... B-1
Appendix C – Site Survey & Architectural Drawings .......................................................................... C-1
List of Tables
Table 1 – Pollutants Typically Generated During the Construction Phase ............................................. 3
Table 2 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
................................................................................................................................................. 3
Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
for Temporary Drainage Works ............................................................................................... 4
Table 4 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
for Emergency Spillways on Temporary Sediment Basins ...................................................... 5
Table 5 - ESC maintenance requirements. ............................................................................................. 6
List of Figures
Figure 1 – Indicative site location (Nearmaps, 2022) ............................................................................. 1
iii
Document Set ID: 22343539
Version: 1, Version Date: 16/03/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.