Council archive · source document
Appendix 10. Draft By-Laws [As Published] · 132007.2399
22. Painting
The Body Corporate is authorised to enter, by its agents, servants, or contractors, onto each Lot
and Dwelling (after giving reasonable notice), for the purpose of the external painting of all
painted surfaces on the Lot and Dwelling.
23. Development
23.1 No Occupier or other person is to erect alter or place on any Lot any Works or to undertake
any Development on any Lot unless and until:
(a) the Body Corporate has determined the erection, alteration or placing or
undertaking of Development is compatible and consistent with these by-laws and
the Body Corporate has issued its written approval in accordance with these by-
laws. the Owner must apply for the Body Corporate's consent and provide all
documents, plans and specifications to evidence that the Development, once
complete ,will be compatible with these by-laws; and
(b) where required by law, the Council or private certifier and/or other required
regulatory approval for the erection, alteration or placing or the undertaking of the
Development has issued, confirming compliance with statutory or other lawful
requirements.
23.2 All Development must be undertaken in a manner that ensures minimum disruption to
Occupiers within the Scheme Land. The following conditions must be complied with:
(a) the Scheme Land must remain in a tidy, orderly and safe condition throughout the
construction process;
(b) Lots are to be maintained at all times free from rubbish and excessive vegetation so
far as is practicable;
(c) Lots or Common Property neighbouring Lots on which Development is occurring
are not to be used for the storage or dumping of any construction materials or debris
unless prior arrangements have been made with the Occupier of the Lot and the
Body Corporate;
(d) for security purposes, the Occupier must furnish the Body Corporate with a list of
all contractors prior to the commencement of the proposed Works or Development;
(e) the Occupier must provide the Body Corporate with a 24 hour emergency contact
number prior to commencement of the proposed Works or Development;
(f) ablution facilities in accordance with lawful requirements are to be provided at the
commencement and for the total period of the Works or Development. The doors
of these facilities shall face the Lot and the facilities shall be cleaned on a weekly
basis;
(g) construction hours are Monday to Saturday 7 a.m. to 6 p.m. excluding public
holidays or at lesser times if required by law;
(h) any damage to an area or services outside the Lot must be advised to the Body
Corporate immediately and rectified by the Body Corporate at the cost of the
Occupier (who shall reimburse the Body Corporate on demand);
(i) the Occupier must ensure that contractors provide suitable facilities e.g. a “rubbish
skip” for the temporary storage of waste building material immediately construction
Legal\105410442.1 11.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 10. Draft By-Laws [As Published]Related documentApplication case desk ↗
About this file
- File size
- 193 KB (small file)
- File type
No other editions are linked here.