Appendix D - Code Assessment
Reconfiguring a Lot Code
Growth Management Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
PO1 No acceptable outcome provided PO1 – Complies
The proposal:
Urban residential development: a) is confined to land within the Urban boundaries;
b) provides a lot sizes consistent with the zone and that
a) is confined to land within the Urban boundaries; will cater for housing choice;
b) provides a mix of lot sizes and configurations to cater c) contributes to efficient use of land and infrastructure
for variety in housing choice; by utilising the existing urban area;
c) contributes to efficient use of land and infrastructure; d) increases residential densities and reduces lot sizes in
d) increases residential densities and reduces lot sizes in close proximity to public transport and centre zones;
close proximity to public transport and centre zones; e) is not located in proximity to ecologically important
e) provides appropriate buffer areas between sensitive areas ; and
land uses, ecologically important areas and conflicting f) contributes positively to the amenity and landscape
uses; value of the local area.
f) contributes positively to the amenity and landscape
value of the local area.
PO2 No acceptable outcome provided PO2– Not applicable
Rural residential development is confined to land within the Rural The provision is not relevant to the proposal.
Residential zone and included within either the Urban Footprint
or Rural Living designations of the South East Queensland
Regional Plan.
PO3 AO3 AO3 – Not Applicable
Development of land for business and employment functions Development of land: The site is not located within the Noosa Business Centre.
occurs within the activity centres and the industrial zones.
a) at the Noosa Business Centre is to be generally in
accordance with Figure 7.2.4.5 (Noosa Business
Centre Framework and Character Plan);
b) at the former Bowls site Lot 3 RP884396, Noosa
Junction is to be generally in accordance with Figure
7.2.5.4 (Noosa Junction Framework and Character
Plan).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix D - Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 22 pages
Page 2
Reconfiguring a Lot Code
PO4 PO4 – Complies
With the exception of lots intended to be used by the Council or No acceptable outcome provided The site does not fit within any categories listed from b) – e)
State for community infrastructure, conservation purposes or With regard to f) - while located in a water supply buffer area
public utilities, including road widening, no additional lots are
associated with Lake Macdonald, the proposal will not result in
created:
a) in the Rural zone unless resultant lots have a minimum any adverse effects on the quality of water entering Lake
area of 100 hectares; Macdonald for the reasons detailed under the assessment
b) in the Environmental Management and Conservation against the Regional Infrastructure Overlay Code.
zone;
c) on Noosa North Shore;
d) in the Low density residential zone at Cooroibah;
e) in the Low density residential zone where access is
gained via:
i) Noosa Banks Drive, Tewantin;
ii) Golf Course Drive, Griffith Avenue or
Carramar Street, Tewantin;
iii) Lake Entrance Boulevard, Noosaville;
iv) Lake Weyba Drive Noosaville, south of
Eenie Creek Road; or
v) Habitat Place, Noosa Heads;
f) within a Water Supply Buffer Area as shown
on Regional Infrastructure Overlay.
Lot areas and dimensions Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth management
Lot areas and dimensions
PO5 AO5.1 – Complies
Page 3
Reconfiguring a Lot Code
New lots have areas and dimensions that: AO5.1 The proposed lots are of sufficient size and shape to
New lots are of a size and shape that can accommodate the land accommodate dwelling houses and associated activities.
a) are consistent with the purpose and overall uses intended by the zone.
outcomes of the applicable zone or zones;
b) are consistent with the size and character of
surrounding lots;
c) can accommodate land uses that are consistent AO5.2 AO5.2 – Complies
with the purpose and overall outcomes of the In general, lots have a predominantly regular, rectangular shape. The proposed lots are regular in shape and are of sufficient size
applicable zone; and dimensions to accommodate dwelling houses and
d) allow for siting and construction of buildings, Editor's note-topographical constraints or environmental values associated activities.
structures, access ways and car parking while:- may call for irregular property boundaries.
i) retaining ecologically important
areas and ecological linkages;
ii) minimising risk of soil erosion, landslide,
flooding and bushfire;
iii) minimising earthworks or retaining walls
associated with construction on sloping
sites;
iv) retaining the scenic amenity and
vegetated character of the landscape;
AO5.3
v) retaining culturally significant features AO5.3 – Complies
In residential zones, lots are generally arranged so that:
and protecting views to culturally the proposal maintains a full frontage lot to Tulip Street that has
significant features; a width of 20.15m.
vi) minimising detrimental impacts of a) there are no more than five lots with a frontage width of
effluent disposal or storm water runoff; less than 15 metres grouped in a row;
including open space for landscaping; b) there are no more than three lots with a frontage width of
ensuring safe vehicular manoeuvring 7.5 metres or less in a row unless serviced by a rear lane;
areas without concentration of c) lots with a frontage width of less than 15 metres are not
driveways in one space; and located opposite other lots with a frontage width of less
vii) where not in a water or sewerage service than 15 metres
area, allow for water storage tanks and AO5.4 AO5.4 – Not Applicable
suitable effluent disposal. In activity centres and industry zones, new lots contribute to a mix of The site is not located within an activity centre or industry zone.
e) except where otherwise specified in a local area lot sizes that cater for varied commercial and industrial enterprises,
code, comply with the minimum lot size specified such that:
in Table 9.5.1.4 Minimum Lot Size and Dimensions a) smaller lots intended for intensive development are
clustered near centres;
b) new lots adjacent to sensitive land uses include sufficient
area for buffering of incompatible land uses; and
c) lot reconfiguration provides for
shared access arrangements wherever possible.
Page 4
Reconfiguring a Lot Code
PO6 – Not applicable
PO6 No acceptable outcome provided The proposal will result in regular shaped lots.
Development provides for irregular shaped lots to be created
only where:
a) the creation of regular lots is impractical such as at
a curve in the road or because of topographical
constraints;
b) safe access and visual exposure to and from
the site can be provided, while not adversely
impacting on the functionality of the surrounding
road network;
c) it is desirable to avoid clearing of vegetation and the
fragmentation of habitat in ecologically important
areas; and
d) the irregular lot is demonstrably suitable for its
intended purpose.
Lot layout Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Lot Layout
Site Responsive Design AO7.1 – Not Applicable
PO7 AO7.1 The site is not located in a modelled flood area.
Development provides for a lot layout and configuration of roads If located in the Low density residential zone, Medium density
and pathways that is responsive to:- residential zone, High density residential zone, Tourist
accommodation zone or Community facilities zone and
a) the setting of the site within an urban or non-urban intended for a residential use, any new lot is located outside the
context; modelled flood level of the 1% AEP (1:100 year ARI) water
b) any natural environmental values present on, or surface levels or where not modelled, above the highest known
adjoining the site; flood level.
AO7.2
Page 5
Reconfiguring a Lot Code
c) any natural hazards affecting the site or adjoining land Flood immunity for development areas is not achieved by filling AO7.3 – Complies
such that the number of properties or persons at risk is land below the 1% AEP (1:100 year ARI) flood level. Each lot has flood immune house site areas and will not require
not increased; filling.
d) the terrain of the land, minimising the need for
earthworks; AO7.3
e) any places of cultural heritage significance or character All reconfigured lots on land subject to a constraint or valuable
areas present on, or adjoining the site; and feature identified on an overlay map contains a building AO7.3 – Complies
f) any important landmarks, views, vistas or other areas envelope marked on a plan of development that demonstrates The proposed lots are of sufficient size and shape to provide for
of high scenic quality present on, or able to be viewed that there is an area sufficient to accommodate the intended residential living with established house sites.
from, the site. purpose of the lot, that is not subject to the constraint or valuable
feature or that appropriately responds to the constraint or
Editor’s Note— Development of land affected by constraints valuable feature.
shown on overlay maps will be subject to overlay codes
AO7.4
New lots with a site area less than 4,000m² in area have AO7.4 – Complies
a slope not exceeding:
The lots generally have a slope of 5%.
a) 10% side slope (crossfall); or
b) 5% lengthwise slope (longitudinal fall).
AO7.5
Lot boundaries, services, utilities and roads are aligned to avoid AO7.5 – Not applicable
traversing ecologically important areas and ecological linkages. The site does not contain ecologically important areas.
AO7.6
Development does not result in significant modification to AO7.6 – Complies
natural landform or landscape features including: The development will not result in modification to the site.
a) waterways and drainage lines;
b) native vegetation or significant character trees;
c) understorey vegetation;
d) slope;
e) rock outcrops; or
f) views.
Page 6
Reconfiguring a Lot Code
AO7.7 AO7.7 – Complies
Development retains or provides viable ecological corridors for The proposal will not impact on any ecological corridors.
wildlife movement.
AO7.8 AO7.8 – Not Applicable
Where no riparian buffer is nominated through the Biodiversity, There is no Biodiversity, Waterways and Wetlands Overlay
Waterways and Wetlands Overlay Map in Schedule 2, a identified on the site.
vegetated buffer is provided no less than 10 metres wide,
measured from the centreline of any stream .
AO7.9
Ecologically important areas are formally protected for the long AO7.9 – Not Applicable
term through environmental covenant or transferal to public There are no Ecologically important areas identified on the site.
ownership or through gazettal of a nature reserve.
Climate Responsive Design AO8.1 AO8.1 – Complies
PO8 The lot design maximises the number of lots where the longest The lots will provide good solar access to the north for both
The street design and lot orientation facilitates the construction of axis of the lot has a general east-west orientation. allotments.
energy efficient buildings that respond to the local climate
conditions by: AO8.2
The street pattern maximises the number of streets running in a
general north-south direction. AO8.2 - Not Applicable
a) maximising solar access to the north;
b) minimising solar access to the west; The proposed subdivision does not involve any new streets.
c) proportioning lots and building envelopes to AO8.3
accommodate energy efficient building orientation; For development within the Low density residential zone each AO8.3 – Complies
d) maximising access to any prevailing summer breezes; lot contains a rectangular house site area where the long axis
faces true north or is no more than 20 degrees off true north and Each lot is capable of a 10m x 15m house site are orientated 20
and degrees of true north.
has minimum dimensions of 10 metres x 15 metres.
Page 7
Reconfiguring a Lot Code
e) minimising exposure to prevailing winter winds.
Neighbourhood Design AO9.1 AO9.1 – Not applicable
PO9 Lots are arranged to front streets and public open space. Lot 1 is arranged to front Tulip Street. Lot 2 is a rear lot.
Development provides for a lot layout, land use and infrastructure
configuration that: AO9.2
AO9.2 – Not Applicable
Development maximises opportunities for casual surveillance
and avoids areas of concealment by ensuring pathways The development maximises casual surveillance to the street
a) provides for an efficient land use pattern; by maintaining the primary dwelling fronting the street.
b) creates compact and walkable neighbourhoods that and public open space have defined edges and are visually
are well connected to centres, employment, education exposed to roadways.
facilities, community services, open space and
recreation facilities; AO9.3 AO9.3 – Not Applicable
c) creates useable and interconnected movement and Neighbourhoods (including roads, pathways and open space) The development does not involve the creation of roads and
open space networks; are designed with a high degree of legibility with public spaces
pathways.
d) effectively connects and integrates the site with and corridors easy to find and recognise.
existing or planned development on adjoining sites;
e) provides for moderate and large size developments to
have multiple access points;
f) promotes a sense of community identity and
belonging;
g) promotes a variety of streetscapes;
h) provides for a high level of amenity, having regard to
potential noise, dust, odour and lighting nuisance
sources;
i) integrates prominent site features including landmarks,
native vegetation and views into the design;
j) discourages crime or antisocial behaviour by
facilitating casual surveillance of streets, paths
and public open space;
k) avoids the sporadic or out-of- sequence creation of
lots; and
l) protects and enhances ecologically important
areas and provides for the clustering of lots into cleared
areas.
Infrastructure No acceptable outcome provided PO10 – Complies
PO10 The development can be efficiently delivered with urban
Development accommodates and provides for the efficient and infrastructure.
timely delivery of infrastructure appropriate to the site’s setting
and intended use.
Page 8
Reconfiguring a Lot Code
PO11 No acceptable outcome provided PO11 – Not Applicable
Roadway and pathway layout are predominantly rectilinear with a The development does not involve any roadways or pathways.
high degree of permeability. Editor’s Note— Further detail on traffic and the road network is
addressed in Part 9.4.8 Transport Code
Infrastructure services Table 9.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes Assessment
Scenic amenity
Infrastructure and services
PO12 AO12.1 AO12.1 – Complies
New lots are located, sized and configured so as to ensure each All lots are connected to power supply and telecommunications The lots are already connected to power and
lot is capable of being serviced by appropriate levels of services and where located within the Urban boundaries, power
infrastructure including: supply and communications infrastructure are provided telecommunications supply.
underground.
AO12.2 – Complies
a) power supply;
b) telecommunications; and AO12.2 The lots will be connected to the water supply network.
c) where within Local Plan Areas If located in a water service area each new lot can be connected
d) reticulated water supply; to Unitywater’s water supply network.
e) reticulated sewerage; and AO12.3 – Not Applicable
f) stormwater drainage. AO12.3
If located in a sewerage service area each new lot can be The lots will be connected to the sewerage network. The
connected to Unitywater’s sewerage network. sewerage line is located at the rear of the existing dwelling and
any future dwelling on Lot 2 can be connected in accordance
with the engineering file note at Appendix C.
AO12.4
If located in a Local plan area lots can be connected to Council’s AO12.4 – Complies
stormwater drainage network. The dwelling on lot 1 will be connected to the stormwater
drainage network within the road reserve of Tulip Street. Any
future dwelling on Lot 2 will be discharged to the open drain via a
level spreader while ensuring non-worsening is achieved (refer
to the Stormwater Management Report at Appendix B).
AO12.5
If not in a sewerage service area each lot has sufficient area and
Page 9
Reconfiguring a Lot Code
other attributes to ensure efficient and effective on-
site sewerage disposal. AO12.5 – Not Applicable
The site is located in a sewerage service area..
PO13 AO13.1 AO13.1 – Complies
Each lot is provided with safe and convenient vehicle access Vehicular access for the development is consistent with the Vehicular access will be designed in accordance with Standard
function and design of the road it takes access from. Drawings RS-049 and RS-050 and will be safe and convenient
for use.
AO13.2
Development does not require new or changed access to a
state-controlled road that is a limited access road unless in
accordance with the limited access policy for the state- AO13.2 – Complies
controlled road . The development does not require access to a state-controlled
road.
AO13.3
Access easements are in appropriate locations for
safe access and egress, and supply appropriate widths and AO13.3 – Complies
levels of service for the number of vehicles that will utilise them The proposed access easement is in the location of an existing
as per the requirements of Council’s Planning Scheme driveway and will allow access to be provided in accordance
Policy PSP6 Engineering design standards – Roads, drainage with PSP6.
and earthworks.
Editor's note- Reference should be made to the Queensland
Government's Development Assessment Mapping System to
confirm which are state-controlled roads or limited access roads.
Page 10
Reconfiguring a Lot Code
Movement Network Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Movement Network
Traffic No acceptable outcome provided PO14 – Complies
PO14 Traffic generated by an additional lot is consistent with the
Traffic generated by the development is within the acceptable Editor’s Note— Further detail on traffic and the road network is intention of the zone and existing road network. It will not cause
capacity of external roads and does not have an adverse impact addressed in Part 9.4.8 Transport Code adverse impact upon the functioning of the road network.
upon the functioning of the road network. underground.
Roads and Pathways AO15.1 AO15.1 – 15.4 – Not Applicable
PO15 Where involving the construction of a new road, road planning The proposed development does not involve the creation of any
Development involving the creation of new roads and pathways and design supports the hierarchy and functional aspects new roads.
ensures infrastructure— identified in Council’s Planning Scheme Policy PSP6 on
Engineering design standards – Roads, drainage and
a) provides convenient, safe and efficient movement for earthworks.
all modes of transport between land use activities;
b) prioritises pedestrian movement and bicycle use over Editor’s Note— Further detail on road and pathway networks is
vehicle movements; provided in Part 9.4.8 Transport Code
c) facilitates efficient, safe and accessible bus services
that connect to existing and future public passenger AO15.2
transport facilities; The street layout is generally rectilinear and does not rely on
d) provides through roads and minimises the use of culs- culs-de-sac, or where the use of a cul-de-sac is unavoidable
de-sac; because of the natural features of the site, it does not exceed a
e) minimises the extent of earthworks required by being length of 200 metres.
sympathetic to the terrain;
f) allows for unimpeded and practical access to each AO15.3
proposed lot; and Pathways and pedestrian routes are planned to provide clear,
g) provides for mature street trees. safe connections between residential, open space, transit stops
and retail areas, and are located along, or are visible from, streets
or other public spaces.
AO15.4
Page 11
Reconfiguring a Lot Code
Sufficient space and soil depth is provided for the planting of
street trees for shade, amenity and habitat purposes.
and Figure AP3-3B.
PO16 AO16 AO16 – Not Applicable
The subdivision layout is designed to facilitate pedestrian and If within 1 kilometre of the Pathways Network identified in There are no trunk pathways in vicinity of the site.
cyclist linkages with adjoining sites in the immediate area. the Local Government Infrastructure Plan located in Part 4, the
subdivision design and layout includes pathways:
a) located in accordance with the Pathways Network
identified in the Local Government Infrastructure Plan;
or
b) linking to the Pathways Network identified in the Local
Government Infrastructure Plan.
PO17 No acceptable outcome provided PO17 – Not Applicable
Development on land within activity centres with active The proposed development is not within an activity centre.
frontages are provided with access from a rear lane or
other access streets to reduce potential conflicts with
pedestrians and cyclists.
Page 12
Reconfiguring a Lot Code
Open Space Network Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Open Space Network
PO18 AO18.1 AO18.1 – Not Applicable
Development provides for parks, drainage reserves and open Active parkland or open space which links to active parkland is The proposed development is not required to incorporate
space infrastructure that:- provided in accordance with the Council’s infrastructure network
planning; parkland or open space.
a) provides for a range of passive and active recreation
settings, offering a range of informal and formal OR
experiences to the community;
b) accommodates adequate facilities to meet the needs AO18.2
of the community and is designed to maximise use by Park contributions are paid in accordance with the applicable
infrastructure instrument. AO18.2 – 18.8 – Not Applicable
the community it serves;
c) provides opportunities for all age groups and levels of The proposed development is not required to provide open
mobility; AO18.3 space or parkland.
d) is well distributed and contributes to the legibility and Land intended for public open space complements existing
character of the specific town, village or locality; adjacent and surrounding open space areas and physical
e) creates attractive settings and focal points for the linkages to these areas are provided.
community, designed as attractive and enjoyable,
functional and safe places to meet and recreate; AO18.4
f) benefits the amenity of adjoining land uses; Open space is provided adjacent to waterways, with roads
g) facilitates the retention and protection of ecologically servicing the linear parkland and lots located on the opposite
important areas, wetlands, waterways, drainage lines side of the road to the waterways.
and native habitat areas, their associated
buffers, ecological linkages and other natural and AO18.5
cultural features; A park has direct road frontages of a minimum of 25% of the
h) incorporates appropriate measures for stormwater total allotment boundary of the park to provide
and flood management; physical access and visibility.
i) is cost effective to maintain; and
j) is dedicated as public land in the early stages of the AO18.6
subdivision. Public open space has good connectivity for users via
pedestrian and cycle paths.
AO18.7
Page 13
Reconfiguring a Lot Code
Landscaping is designed to create aesthetically pleasing open
space areas and to suit the type, setting and purpose of the
particular park.
AO18.8
Active parkland in all areas other than the Low impact
industry zone and Medium impact industry zone will contain
embellishment in accordance with the Local Government
Infrastructure Plan in Part 4 such as:
a) children’s play facilities catering for various ages
including a soft fall surface where required and a
shade cover over play equipment;
b) seating;
c) picnic table/s with seats; and
d) landscaping.
Editor’s Note— Further detail on Landscaping is addressed in
Part 9.4.5 Landscaping Code
PO19 AO19.1 AO19.1 – AO19.3 – Not Applicable
Land provided for active recreation areas is of a physical Active parkland is of a usable shape free of irregular boundaries. The proposed development is not required to provide active
standard and condition suitable for the intended uses and is not parkland.
subject to physical or other constraints including contamination, AO19.2
environmental or biophysical constraints or legislative protection Active parkland is located on land that is exclusive of—
that would encumber its use.
a) flood inundation below the 20% AEP (1:5
year ARI level);
b) land affected by stormwater or overland flow
discharge from adjacent allotments;
c) drainage reserves and detention basins, which cannot
be shown to safely and effectively contribute to the
network of parks and open space areas;
d) land with a slope, or subject to cut or fill with a
batter slope, that exceeds a slope of 15%;
e) areas of land less than 15 metres wide, such
as access and service and utility easements;
f) land required to serve primarily as a buffer area to any
existing development or major transport corridor; and
Page 14
Reconfiguring a Lot Code
g) power easements.
AO19.3
At least 10% of the total open space provision for active parkland
is exclusive of flood inundation below the 1% AEP (1:100
year ARI level or the highest recorded flood level), whichever is
the greatest.
Small Residential Lots Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Small Residential Lots
PO20 AO20 AO20 – Not Applicable
Residential lots less than 600m2: Within the Low Density Residential zone, new lots of less than The proposed development does not involve creating small lots.
600m²:
a) occur only where they are consistent with the size of
established adjacent lots; a) are no smaller than the size of established adjacent
b) are not less than 500m2 in area; lots;
c) are free of physical constraints or encumbrances that b) are free of easements;
would restrict the siting of a house; c) are regular in shape with a width to depth ratio of
d) have area and dimensions that can accommodate an approximately 1:2;
appropriate house site area without siting variations; d) do not have a slope greater than 10%;
e) are distributed across a development to create e) can accommodate a house and sufficient car parking
diversity in lots; and without encroaching into boundary clearances or
f) do not result in excessive driveways at intersections prescribed building setbacks;
or corners. f) allow for landscape and tree planting in deep soil
zones to soften built form elements;
g) are not created by further dividing an existing rear
(battle-axe) lot; and
h) are not located at the end of a T-intersection or at a
bend in the road.
Page 15
Reconfiguring a Lot Code
Rear Lots Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Rear Lots
PO21
Rear (battle-axe) lots are created only where:-: AO21.1 AO21.1 – Complies
The minimum area of the rear lot, exclusive of any access strip, Lot 1 has an area of 725m2. Lot 2 has an area of 806m2 exclusive
a) it would not be desirable nor practicable for the site to complies with the lot reconfiguration outcomes in Table 9.5.1.4 of an access handle.
be reconfigured so that all lots have full frontage to a Minimum lot size and dimensions providing that no
road; rear access lot has a lot size less than 600m2 exclusive of access Both lots have average widths greater that 17m.
b) located in the Low density residential zone, Rural
strip.
residential zone or Rural zone;
c) development positively contributes to the character of
the neighbourhood;
d) development provides a high standard of amenity for
residents and other users of the rear lot and adjoining AO21.2
properties; No more than 10% of lots within a subdivision are rear lots or lots AO2 - Performance Outcome
e) the lot is large enough to accommodate anticipated accessed via an access strip. The proposal involves a 1 into 2 lot reconfiguration and one of
land uses including car parking and manoeuvring; the lots is a rear lot. The rear lot is provided with sufficient areas
f) development is not detrimental to the use and and dimensions to cater for the existing dwelling and any future
amenity of adjoining lots through loss of privacy, dwelling on the lot.
sunlight or breezes once buildings are constructed;
g) vehicular access to rear lots will not have a detrimental
impact on lots adjoining the access strip due to
excessive noise, light, dust, stormwater runoff and the AO21.3
like; No more than two rear lots are located at the end of a cul-de-sac. AO21.3. – Not Applicable
h) access arrangements do not adversely affect the The site is not located at the end of a cul-de-sac.
safety and efficiency of the road from which access is
gained;
i) their creation does not prejudice the anticipated AO21.4
development of adjoining land. AO21.4 – Complies
No rear lot shares a common boundary with more than four
The rear lot shares a common boundary with four lots.
other lots.
AO21.5
No more than two rear lots or rear lot access strips directly adjoin AO21.5 – Not Applicable
each other. The rear lot does not adjoin another rear lot.
Page 16
Reconfiguring a Lot Code
AO21.6
No existing lot with a primary street frontage of less than 12 AO21.6 – Not Applicable
metres is further divided unless safe access to the new lot is The existing lot has a frontage width of 20.115m.
provided to a secondary street to which a frontage of at least 12
metres is provided.
AO21.7
Where two rear lots adjoin each other, a single common
AO21.7 - Not Applicable
driveway and reciprocal access easements are provided.
The rear lot does not adjoin another rear lot.
AO21.8 AO21.8 – Complies
No more than three lots gain access from the same access strip. The access strip services two lots.
AO21.9 AO21.9 – Complies
Any lot with a road frontage has no more than one rear The full frontage lot only has a rear lot behind and an access
lot created to its rear and has a rear lot access strips located on strip on one side only.
no more than one side.
AO21.10
The gradient of the access strip does not exceed 10%. AO21.10 - Complies
The gradient of the access strip does not exceed 10%.
AO21.11
Access strips have a minimum width of 4.5 metres. AO21.11 - Complies
The access strip has a minimum width of 4.5m.
Rural lots severed by a road Table 9.5.1.3 Criteria for assessable development (part)
Page 17
Reconfiguring a Lot Code
Not Applicable.
Volumetric Subdivisions Table 9.5.1.3 Criteria for assessable development (part)
Not Applicable.
Stormwater Management Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Stormwater Management
PO24 No acceptable outcome provided PO22 – Complies
Development provides for the effective drainage of lots and The proposed development will provide effective drainage of
roads in a manner that:- Editor’s Note— Requirements for the design and construction of
lots and not impact on the natural flow regime.
stormwater management infrastructure are addressed in Part
a) maintains the natural flow regime; 9.4.9 Water Quality and Drainage code
b) effectively manages stormwater quality and quantity;
and
c) ensures no adverse impacts on receiving waters and
surrounding land.
Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Conflicting land uses
Page 18
Reconfiguring a Lot Code PO25 PO25 – Complies New lots for residential development do not adjoin land located No acceptable outcome provided in the Medium impact industry zone or the Low impact The site does not adjoin industrial land. industry zone. Rearrangement of Lot Boundaries Table 9.5.1.3 Criteria for assessable development (part) Not Applicable.
Page 19
7.2.2 Cooroy Local Plan Code
7.2.2.2 Purpose and overall outcomes
(b) Development is limited to land within the urban boundary and maintains a defined edge to the town to protect and reinforce the character and identity of Cooroy, provide
efficient provision of infrastructure and services, avoid constrained land and protect the landscape character and productivity of surrounding rural and rural residential land.
(d) The protection of water quality within Lake Macdonald and waterways that drain to it is a paramount factor in consideration of development within the water supply catchment.
(n) Detached housing is typically characterised by a mix of detached traditional Queenslanders and modern homes with large setbacks and mature landscaping.
Comment
The proposed development meets the relevant outcomes of the Cooroy Local Plan Code, including (b), (d) and (n) in that:
+ the low-density residential reconfiguration would be contained within the urban boundary and provide for suitable unconstrained allotments that are fully serviced by urban
infrastructure and suitable for the establishment of dwelling houses;
+ the development would ensure that the water quality within the Lake Macdonald Catchment is protected as the allotments would be connected to reticulated sewerage
infrastructure and the existing piped stormwater network; and
+ the reconfiguration would provide for appropriately sized lots that are capable of accommodating homes with well landscaped settings.
Page 20
Low Density Residential Zone Code
6.3.1 Low Density Residential Zone Code
6.3.1.2 Purpose and overall outcomes
(c) The distinct look and feel of existing residential neighbourhoods is retained, and development makes a positive contribution to the streetscape, maintaining the low density and
low scale character;
(d) Predominantly detached housing on a range of lot sizes meet the needs of different households.
Comment
The proposed development meets the relevant outcomes of the Low Density Residential Zone Code, including (c) and (d) in that:
+ it would maintain the existing character of the street by maintaining a lot and dwelling house fronting Tulip Street and provide a rear lot; and
+ it would provide for appropriately sized residential lots suitable for the establishment of a dwelling house that meets the need for different households.
Page 21
Driveways and Parking Code
Table 9.4.1.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcome Assessment
Assessable development
PO1 AO1.1 AO1.1 – Complies
Vehicular access does not adversely impact on safety, Vehicular access is located and designed in accordance
capacity and operations of the existing or planned road with the current Australian Standards for Parking Facilities. Both Lots 1 and 2 will be accessed by a new driveway and
network, cycleways or pedestrian pathway systems
crossover within a 4.5m wide access handle along the
eastern boundary of the site, generally in the same
position as the existing driveway. The new driveway will
be designed to appropriate standards.
AO1.2 AO1.2 – Complies
Only one footpath crossing is provided. Only one crossing is provided.
Editor’s Note— Justification for additional driveways may
need to be supported by a detailed Traffic Study.
AO1.3 AO1.3 – Complies
Driveways, have a maximum grade in accordance with The new driveway will incorporate appropriate grades in
Council’s standard requirements. accordance with Council Standard Drawing RS-050.
PO2 AO2.1 AO2.1 – Complies
Driveways and crossovers Design and construction of driveways, including across The new driveway will be designed to comply with
a) are suitable and safe for their intended use; and the footpath, is in accordance with Council Standard Council Standard Drawings RS-049, RS-050.
b) match Council infrastructure.
Drawings as appropriate for the particular type of
development as annotated on the drawings.
Page 22
Driveways and Parking Code
AO2.2 – Complies
AO2.2 The grade changes of the driveway can be designed in
The change of grades in driveways and ramps is in accordance with Council’s Standard Drawings.
accordance with Council’s Standard Drawings.
PO3 AO3.1 AO3 – Not Applicable
The number of driveways across pedestrian footpaths is Design of multi-tenanted developments include shared
minimised. driveways and parking areas.
AO3.2
Driveways are located so they abut existing driveways of AO3.2 – Not Applicable
adjoining development where practicable and reciprocal
easements are created to reduce the sealed driveway
width.
PO4 AO4 AO4.1 – Complies
Vehicular access does not adversely impact on the Footpath and kerb crossings are located clear of existing The new crossover is clear of stormwater infrastructure.
capacity, operations and maintenance of the existing stormwater inlet structures, water and sewerage
infrastructure.
infrastructure fittings, any other exiting utility infrastructure,
existing landscaping and vegetation.
PO5 AO5 AO5- Complies
Vehicular access does not adversely impact on the health Vehicular access avoids disturbance to the tree protection The driveway is located in the same position of an existing
and integrity of existing landscaping or native vegetation, zone of trees on public land. driveway and will not impact on tree protection zones.
where possible.
Table 9.4.1.3 - Criteria for assessable development (part)
Not Applicable.
This table relates to parking and manoeuvring requirements associated with uses.
Page 23
Driveways and Parking Code Table 9.4.1.4 - Minimum parking requirements including end of trip facilities Not Applicable.