Original source · versioned page text
Appendix D - Code Assessment
Reconfiguring a Lot Code
Movement Network Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Movement Network
Traffic No acceptable outcome provided PO14 – Complies
PO14 Traffic generated by an additional lot is consistent with the
Traffic generated by the development is within the acceptable Editor’s Note— Further detail on traffic and the road network is intention of the zone and existing road network. It will not cause
capacity of external roads and does not have an adverse impact addressed in Part 9.4.8 Transport Code adverse impact upon the functioning of the road network.
upon the functioning of the road network. underground.
Roads and Pathways AO15.1 AO15.1 – 15.4 – Not Applicable
PO15 Where involving the construction of a new road, road planning The proposed development does not involve the creation of any
Development involving the creation of new roads and pathways and design supports the hierarchy and functional aspects new roads.
ensures infrastructure— identified in Council’s Planning Scheme Policy PSP6 on
Engineering design standards – Roads, drainage and
a) provides convenient, safe and efficient movement for earthworks.
all modes of transport between land use activities;
b) prioritises pedestrian movement and bicycle use over Editor’s Note— Further detail on road and pathway networks is
vehicle movements; provided in Part 9.4.8 Transport Code
c) facilitates efficient, safe and accessible bus services
that connect to existing and future public passenger AO15.2
transport facilities; The street layout is generally rectilinear and does not rely on
d) provides through roads and minimises the use of culs- culs-de-sac, or where the use of a cul-de-sac is unavoidable
de-sac; because of the natural features of the site, it does not exceed a
e) minimises the extent of earthworks required by being length of 200 metres.
sympathetic to the terrain;
f) allows for unimpeded and practical access to each AO15.3
proposed lot; and Pathways and pedestrian routes are planned to provide clear,
g) provides for mature street trees. safe connections between residential, open space, transit stops
and retail areas, and are located along, or are visible from, streets
or other public spaces.
AO15.4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix D - Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.