Council archive · source document
Civil Engineering Drawings · OPW24/0025
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PROPOSED DE ELOPMENT
EASTERN RANCH
A
Engineering PTY LTD
RD KIN KIN LD
DA ID LOW WAY PEREGIAN EACH LD
IN O A ENGINEERING COM AU
Operational Works Application
RE CONSTRUCTION
NORTH POINT
DRAWING SCHEDULE
Table
List
Sheet
NUM ER TITLE
304-001-001 COVER SHEET
304-001-002 GENERAL NOTES
304-001-100 SITE LAYOUT PLAN
304-001-200 EARTHWORKS LAYOUT PLAN
304-001-201 EARTHWORKS SECTIONS
SITE LOCATION 304-001-250
304-001-251
SEDIMENT & EROSION CONTROL PLAN
SEDIMENT AND EROSION DETAIL SHEET 1 OF 3
304-001-252 SEDIMENT AND EROSION DETAIL SHEET 2 OF 3
304-001-253 SEDIMENT AND EROSION DETAIL SHEET 3 OF 3
304-001-300 OVERALL ROADWORKS LAYOUT PLAN
304-001-301 ROADWORKS LAYOUT PLAN SHEET 1 OF 2
304-001-302 ROADWORKS LAYOUT PLAN SHEET 2 OF 2
304-001-310 ROADWORKS LONGITTUDINAL SECTIONS SHEET 1 OF 2
304-001-311 ROADWORKS LONGTIDUDINAL SECTIONS SHEET 2 OF 2
304-001-320 ROADWORKS CROSS SECTIONS SHEET 1 OF 3
304-001-321 ROADWORKS CROSS SECTIONS SHEET 2 OF 3
304-001-323 ROADWORKS CROSS SECTIONS SHEET 3 OF 3
304-001-800 SWEPT PATH LAYOUT PLAN - SHEET 1 OF 3
304-001-801 SWEPT PATH LAYOUT PLAN - SHEET 2 OF 3
304-001-802 SWEPT PATH LAYOUT PLAN - SHEET 3 OF 3
LOCALITY PLAN
PROPERTY DESCRIPTION PROJECT DESCRIPTION
LOT: PROJECT NAME:
218 332 EASTERN BRANCH RD, KIN KIN
PLAN: PROJECT NO:
MCH186 304-001
LOCAL AUTHORITY: REVISION DATE:
NOOSA SHIRE COUNCIL 18.10.23
LOCAL AUTHORITY APPROVAL NO: PLAN ISSUE:
MCU 22-052
FOR APPROVAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
GENERAL EARTHWORKS/ROADWORKS SEDIMENT AND EROSION
STORMWATER
·
·
·
·
·
·
LINEMARKING
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL
ERGON. AUSTRALIA
IT IS THE RESPONSIBILITY OF THE PRINCIPAL
ENERGY
energex ' yes' Telstra visionstream
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION GENERAL NOTES
DATUM: AHD
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-002 REVISION B A1
Page 3
E ISTING LAYOUT PLAN PROPOSED LAYOUT PLAN
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SITE LAYOUT PLAN
DATUM: AHD
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-100 REVISION B A1
Page 4
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION EARTHWORKS LAYOUT PLAN
DATUM: AHD
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-200 REVISION B A1
Page 5
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION EARTHWORKS SECTIONS
DATUM: AHD
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-201 REVISION B A1
Page 6
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SEDIMENT & EROSION CONTROL PLAN
DATUM: AHD
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-250 REVISION B A1
Page 7
STA ILISED SITE ACCESS
SEDIMENT ENCE
ARRIER ENCE
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SEDIMENT AND EROSION
DATUM: AHD DETAIL SHEET 1 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY LTD
PROJECT:
332 EASTERN BRANCH RD,
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
DA ID LOW WAY PEREGIAN EACH
IN O A ENGINEERING COM AU
LD
KIN KIN PLAN No 304-001-251 REVISION B A1
Page 8
GRA EL INLET ILTER
SAND AG TEMPORARY UND
CONCENTRATED LOW CATCH DRAIN ATTER SHEET LOW
STOCKPILES
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SEDIMENT AND EROSION
DATUM: AHD DETAIL SHEET 2 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY LTD
PROJECT:
332 EASTERN BRANCH RD,
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
DA ID LOW WAY PEREGIAN EACH
IN O A ENGINEERING COM AU
LD
KIN KIN PLAN No 304-001-252 REVISION B A1
Page 9
CLEAN WATER CATCH DRAIN
.
SEED ED PREPARATION
ROCK CHECK DAM
EARTH ANK HIGH LOWS EARTH ANK LOW LOW CATCH DRAINS REPLACING TOPSOIL
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SEDIMENT AND EROSION
DATUM: AHD DETAIL SHEET 3 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY LTD
PROJECT:
332 EASTERN BRANCH RD,
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
DA ID LOW WAY PEREGIAN EACH
IN O A ENGINEERING COM AU
LD
KIN KIN PLAN No 304-001-253 REVISION B A1
Page 10
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION OVERALL ROADWORKS
DATUM: AHD LAYOUT PLAN
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-300 REVISION B A1
Page 11
LEGEND
NO VEHICLE
PAST THIS POINT
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS LAYOUT
DATUM: AHD PLAN SHEET 1 OF 2
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-301 REVISION B A1
Page 12
LEGEND
NO VEHICLE
PAST THIS POINT
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS LAYOUT
DATUM: AHD PLAN SHEET 2 OF 2
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-302 REVISION B A1
Page 13
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS LONGITTUDINAL
DATUM: AHD SECTIONS SHEET 1 OF 2
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-310 REVISION B A1
Page 14
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS LONGTIDUDINAL
DATUM: AHD SECTIONS SHEET 2 OF 2
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-311 REVISION B A1
Page 15
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS CROSS
DATUM: AHD SECTIONS SHEET 1 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-320 REVISION B A1
Page 16
2.5% 2.5% 2.5%
2.5%
2.5% 2.5%
3
2.5% 2.5% 1 in
DATUM R.L.82.00
DATUM R.L.80.00 DATUM R.L.79.00
DATUM R.L.87.00
0.00
0.07
0.06
0.02
0.00
DEPTH
0.00
0.05
0.01
0.03
0.00
-0.05
-0.02
DEPTH
0.00
0.08
0.00
DEPTH
-0.07
0.00
0.00
0.04
0.00
DEPTH
FINISHED
83.66
83.60
83.62
83.65
83.66
FINISHED
80.64
80.60
80.62
80.65
80.68
FINISHED SURFACE LEVEL
81.06
81.12
81.15
81.12
81.24
SURFACE LEVEL SURFACE LEVEL FINISHED
89.02
89.09
89.07
89.04
89.08
SURFACE LEVEL
EXISTING
83.66
83.67
83.68
83.66
83.66
EXISTING
80.64
80.64
80.63
80.68
80.68
EXISTING SURFACE LEVEL
81.06
81.07
81.13
81.20
81.24
SURFACE LEVEL SURFACE LEVEL EXISTING
89.02
89.02
89.07
89.08
89.08
SURFACE LEVEL
OFFSET FROM
-1.20
-1.00
OFFSET FROM
0.00
1.00
1.04
OFFSET FROM CONTROL LINE
-1.13
-1.00
0.00
1.00
1.11
-1.19
-1.00
CONTROL LINE
0.00
1.00
1.34
CONTROL LINE OFFSET FROM
-1.21
-1.00
0.00
1.00
1.10
CONTROL LINE
CH 280.00 CH 340.00
CH 220.00
CH 400.00
2.5% 2.5% 2.5%
2.5%
2.5% 2.5%
3 2.5% 2.5%
1 in
DATUM R.L.81.00
DATUM R.L.78.00 DATUM R.L.84.00
0.00
0.06
0.04
0.02
0.00
DATUM R.L.77.00 DEPTH
-0.11
-0.10
-0.07
-0.03
-0.13
-0.04
0.00
0.00
0.00
0.00
DEPTH DEPTH
-0.00
-0.02
0.00
0.05
0.00
DEPTH
FINISHED
82.64
82.59
82.62
82.64
82.66
FINISHED SURFACE LEVEL FINISHED
85.33
85.47
85.49
85.47
85.39
79.57
79.59
79.61
79.59
79.55
SURFACE LEVEL SURFACE LEVEL
FINISHED
79.07
79.02
79.04
79.02
78.99
SURFACE LEVEL EXISTING
82.64
82.65
82.66
82.66
82.66
EXISTING SURFACE LEVEL EXISTING
85.33
85.35
85.39
85.40
85.39
79.57
79.56
79.49
79.55
79.55
SURFACE LEVEL SURFACE LEVEL
EXISTING
79.07
79.07
79.04
79.00
78.99
SURFACE LEVEL OFFSET FROM
-1.16
-1.00
0.00
1.00
1.07
OFFSET FROM CONTROL LINE OFFSET FROM
-1.40
-1.00
-1.06
-1.00
0.00
1.00
1.22
0.00
1.00
1.10
CONTROL LINE CONTROL LINE
OFFSET FROM -1.15
-1.00
0.00
1.00
1.08
CONTROL LINE
CH 320.00
CH 200.00 CH 380.00
CH 260.00
2.5% 2.5%
2.5% 2.5% 1 in
3 2.5% 2.5%
2.5% 2.5%
DATUM R.L.79.00 DATUM R.L.79.00 DATUM R.L.81.00 DATUM R.L.83.00
-0.04
-0.07
-0.06
-0.07
-0.08
-0.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.00
0.00
0.15
0.10
0.06
0.00
DEPTH DEPTH DEPTH DEPTH
FINISHED FINISHED FINISHED FINISHED
80.50
80.54
80.57
80.54
80.48
80.18
80.26
80.29
80.26
80.16
82.67
82.66
82.69
82.71
82.74
84.58
84.44
84.46
84.49
84.54
SURFACE LEVEL SURFACE LEVEL SURFACE LEVEL SURFACE LEVEL
EXISTING EXISTING EXISTING EXISTING
80.50
80.50
80.50
80.48
80.48
80.18
80.19
80.21
80.17
80.16
82.67
82.67
82.69
82.73
82.74
84.58
84.59
84.57
84.55
84.54
SURFACE LEVEL SURFACE LEVEL SURFACE LEVEL SURFACE LEVEL
OFFSET FROM OFFSET FROM OFFSET FROM OFFSET FROM
-1.12
-1.00
-1.24
-1.00
-1.01
-1.00
-1.44
-1.00
0.00
1.00
1.19
0.00
1.00
1.31
0.00
1.00
1.08
0.00
1.00
1.16
CONTROL LINE CONTROL LINE CONTROL LINE CONTROL LINE
CH 180.00 CH 240.00 CH 300.00 CH 360.00
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS CROSS
DATUM: AHD SECTIONS SHEET 2 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-321 REVISION B A1
Page 17
3
2.5% 2.5% 1 in
DATUM R.L.96.00
0.00
0.02
0.10
0.13
0.00
DEPTH
FINISHED
98.11
98.10
98.12
98.10
98.23
SURFACE LEVEL
EXISTING
98.11
98.11
98.22
98.23
98.23
SURFACE LEVEL
OFFSET FROM
-1.03
-1.00
0.00
1.00
1.40
CONTROL LINE
CH 460.00
3 2.5% 2.5%
1 in
2.5% 2.5%
DATUM R.L.94.00
-0.11
-0.10
-0.04
DATUM R.L.97.00
0.00
0.00
DEPTH
-0.04
0.00
0.00
0.09
0.00
DEPTH
FINISHED
95.57
95.72
95.75
95.72
95.69
SURFACE LEVEL
FINISHED
98.33
98.37
98.39
98.37
98.46
SURFACE LEVEL
EXISTING
95.57
95.61
95.64
95.68
95.69
SURFACE LEVEL
EXISTING
98.33
98.33
98.40
98.46
98.46
SURFACE LEVEL
OFFSET FROM
-1.44
-1.00
0.00
1.00
1.09
CONTROL LINE
OFFSET FROM
-1.12
-1.00
0.00
1.00
1.28
CONTROL LINE
CH 440.00
CH 480.83
2.5% 2.5%
2.5% 2.5%
DATUM R.L.91.00 DATUM R.L.97.00
-0.00
-0.02
0.08
0.04
0.04
0.00
0.00
0.00
0.08
0.00
DEPTH DEPTH
FINISHED FINISHED
92.64
92.54
92.52
92.49
92.53
98.34
98.36
98.38
98.36
98.44
SURFACE LEVEL SURFACE LEVEL
EXISTING EXISTING
92.64
92.62
92.56
92.53
92.53
98.34
98.34
98.39
98.43
98.44
SURFACE LEVEL SURFACE LEVEL
OFFSET FROM OFFSET FROM
-1.20
-1.00
-1.06
-1.00
0.00
1.00
1.12
0.00
1.00
1.25
CONTROL LINE CONTROL LINE
CH 420.00 CH 480.00
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION ROADWORKS CROSS
DATUM: AHD SECTIONS SHEET 3 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-323 REVISION B A1
Page 18
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SWEPT PATH LAYOUT PLAN -
DATUM: AHD SHEET 1 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-800 REVISION B A1
Page 19
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SWEPT PATH LAYOUT PLAN -
DATUM: AHD SHEET 2 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-801 REVISION B A1
Page 20
LEGEND
A
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
QRE CONSTRUCTION SWEPT PATH LAYOUT PLAN -
DATUM: AHD SHEET 3 OF 3
B 18.10.23 AMENDMENTS TO LAYOUT
A 28.11.22 ISSUED FOR INFORMATION
QT
QT
GWA
GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
DA ID LOW WAY PEREGIAN EACH LD
PTY LTD
PROJECT:
332 EASTERN BRANCH RD, KIN KIN
No. DATE REVISIONS BY CKD MCU 22-052 DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. IN O A ENGINEERING COM AU PLAN No 304-001-802 REVISION B A1
Used in these records
Civil Engineering Drawings.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.