Council archive · source document
07/2446 - Response to carparking survey Data [As Published] · 132007.2446
@ Page 2 Specific Outcomes Probable solutions (if code assessable) 07 Sufficient carparking is provided to accommodate the number and type of vehicles likely to be generated by the development having regard to the specifics of the use including— a) the type and intensity of land use; b) any existing parking available on the site; ¢) hours of operation; $7.1 The number of parking and loading bays is not less than the minimum number specified in Table 14-51 Vehicle Parking Requirements; OR $7.2 if insufficient carparking spaces are provided on-site a monetary contribution is made to Council in accordance with Section 6 of PSP13 Contributions in fieu of provision of off- d) likely numbers of users; @) the peak parking demand periods of uses on the site; and f) the availability of altemative carparking. Street carparking. Despite the proposal complying with carparking numbers as detailed by the planning scheme additional information in relation to the Specific Outcome O7 has been requested to be detailed. Sufficient carparking is provided to accommodate the number and type of vehicles likely to be generated by the development having regard to the specifics of the use including— &) the type and intensity of land use; - The applicant seeks approval to renovate and expand existing buildings on site to create a hostel of 48 beds. The planning scheme specifically identifies the site as being suitable for a back packer use noting its proximity to surrounding urban and recreational facilities. The Plan also details a population density of 320 persons per hectare for the site which effectively indicates a maximum of 54 beds on the site. The applicant proposes 48 beds which is less than the intensity envisaged by the Plan for a site of this size. The applicant has attempted to maintain the character of visual amenity of the site by the retention of the existing building and vegetation on site. Discussions with the proprietors of the two approved hostels in the Noosa area indicate that 60 to 70% of patrons arrive in the area via bus. It is considered reasonable then to assume that this hostel will have a similar vehicular pattern as the other hostels. b) any existing parking available on the site; Four carparking spaces are to be provided on site along with a space for a mini van and this carparking complies with Noosa Pian requirements. The proposed spaces are located at the front of the site and are readily visible and available for quests. The location of the parking at the front of the site also reduces the impact of vehicles on surrounding premises. ¢) hours of operation; The hostel will generaily be open 7 days a week with check in after 2pm and check out at 10.00am. Most patrons will generally vacate the premises at check out time and arrive late in the afternoon however this is dependant on arrival of buses at Noosa Heads. ) likely numbers of users; As Indicated above approximately 60 to 70% of patrons arrive at hostels via buses. Therefore the carparking proposed should be able to cater for the carparking demands of the users. It is noted that whilst the applicant originally indicated that they would be catering for family budget accommodation, this aspect has since changed as a result of design modifications and further discussions with industry professionals. The applicant intends to promote the hostel to individual budget travelers as well as sporting competitors who are utilising nearby venues such as the Noosa Aquatic Centre @) the peak parking demand periods of uses on the site; and The peak periods for the backpacker Industry generally occur during the warmer months of the year during the March, September and December quarters, it is noted that this part of this peak period partially coincides with peak holiday seasons of Queensland. The operator of the William Street backpackers indicate that they have been operating at full capacity for the whole year however acknowledged a peak over the summer months. With regard to the proposal it is noted that the peak demand for carparking will generally be in the late afternoon and early evening. At this time traffic in the area is reduced due to the completion of activities associated with the nearby school. Further it is noted that the opening of stage 3 of the Eenie Creek Road has reduced traffic flows in the area. As indicated previously a recent survey of the Williams Street backpackers and restaurant indicates adequate carparking even when the hostel is full. A) the availability of alternative carparking. As indicated above most patrons to the site will utilise the mini bus that picks up from the transit centre at Hastings Street. Further the peak carparking periods of the site are at a time when the nearby schools are closed and therefore demands for on street carparking reduced. There is no more room on site available for carparking however carparking is available across the street in the cul-de-sac located at the end of Ben Lexon Drive opposite the site. This area could be used in peak holiday times when the school was closed if necessary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2446 - Response to carparking survey Data [As Published]Related documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.