Original source · versioned page text
Design Report
Very large file: it may take a few minutes
The original of this document is very large (125 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
DES I G N PRINCIPL ES
S E RVI C I N G, PA R K I N G, LOADI N G & S TAFF FAC I LI TI ES
EASTERN ACCESS WESTERN ACCESS
(FRONT OF HOUSE) (BACK OF HOUSE)
Guest and visitor entry into the Resort Loading dock – the Resort loading dock
will be via the roundabout at the end of will be accessed via the cul-de-sac at the
Grant Street, obviating the need to enter end of Serenity Close. This will be the
Serenity Close and improving the safety, lowest point of the Site enabling sufficient
amenity, and privacy of residents. Resort basement height to receive larger delivery
guests will be directed to the generous and refuse vehicles.
set-down area on Level 3 of the complex,
to be met by the Resort’s concierge and Time restrictions for deliveries and
valet staff. Valet parking will be reserved refuse collections will be put in place
on Level 3 while visitors will be invited and managed to minimise disruption to
to enter the ramp down to the Level 2 surrounding residents. Significant waste
basement carpark. reduction measures will be implemented
(refer Waste Management Report) to
reduce the number and frequency of LEVEL 1 LEVEL 2
STAFF FACILITIES refuse collections from the Resort.
(BACK OF HOUSE)
The dock and refuse operations will be
Located within Level 2 of the western internalised to enable any associated
wing, staff amenities will be located with noise to be enclosed and controlled.
convenient access to all Resort levels. Ample delivery parking will be provided
Facilities will include admin spaces, with all vehicle manoeuvres on site.
male and female bathrooms (including Storage of bins and linen will be within
showers, change rooms, end of trip the dock and co-located with the primary
facilities) uniform store, kitchenette, break- service lift. A roller shutter will provide
out space, meeting rooms and Resort security and acoustic attenuation.
administration.
Staff carparking will be accessed via the
dock with links through to Level 2 carpark.
The 28 car parking spaces will have
convenient access to the Resort offices
and amenities on the same level.
LEVEL 3
THE CALILE NOOSA | CALILE MALOUF INVESTMENTS | DEVELOPMENT APPROVAL - DESIGN REPORT 42 2100014 | REV A | RICHARDS & SPENCE | CONLON GROUP THE CALILE NOOSA | CALILE MALOUF INVESTMENTS | DEVELOPMENT APPROVAL - DESIGN REPORT 43 2100014 | REV A | RICHARDS & SPENCE | CONLON GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.