Original source · versioned page text
Reps on conditions
Attached to the e-mail Representations on Conditions of Approval- MCU16/0012.
4. Condition 40- “Operating stormwater harvesting tanks must be provided for the development and
must include re-use of harvested rainwater for internal non-potable uses and outdoor uses”.
Representations- Given the basement configuration and invert levels for the piped stormwater flow
through the site, the provision of stormwater harvesting tanks within the basement is not practicable.
The provision of tanks at surface is considered undesirable given the nature of the development and its
location within the business centre of Cooroy.
Should you wish to discuss, please contact undersigned on (07) 3251 9421 or email:
[email protected]
Yours faithfully
Saunders Havill Group
Eddie Venturini
Principal Town Planning
page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.