Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/1490 Date of Decision: 18 January 2008
1. APPLICANT DETAILS
Name: Res Bella Pty Ltd
Postal address: CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Phone no: 5455 5425 Fax no: 5455 5725
2. PROPERTY DESCRIPTION
Street address: 37 Grant Street NOOSA HEADS, 35 Grant Street NOOSA HEADS, 33 Grant Street NOOSA
HEADS, 31 Grant Street NOOSA HEADS, 29 Grant Street NOOSA HEADS
Real property LOT: 1 SP: 179879, LOT: 2 SP: 179879, LOT: 3 SP: 179879, LOT: 4 SP: 179879, LOT: 5 SP:
description: 179879
3. OWNER DETAILS
Name: Res Bella Pty Ltd
Postal address: PO Box 376
SPIT JUNCTION NSW 2088
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Lot Reconfiguration - In accordance with the approved No Yes
Boundary Realignment & plan titled “Proposed
Amalgamation Reconfiguration of 5 Lots to 4 Lots –
Grant Street, Noosa Heads”
numbered 0703.0A4 prepared by Ian
Gorton Design except as modified
herein
6. DECISION DETAILS
Council decided to approve this application on 18 January 2008, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 10 N/A. 8. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. 9. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Operational Works Access, Stormwater and Sewer Reticulation 10. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 11. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 10
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. For the purpose of these conditions, the following definitions apply: -
1.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
1.2. A registered Professional Civil Engineer means an civil engineer who is registered in
Queensland pursuant to the Professional Engineers Act 1988.
1.3. The person acting on this permit means any person or company who undertakes development
pursuant to this permit.
1.4. Principal Contractor means the person nominated by the Applicant and approved by the Manager
- Land Development at a pre-start meeting as being responsible for the major component of works
associated with a Development Permit for Operational Works of any works on the site.
2. The lot reconfiguration shall be in accordance with the approved plan titled “Proposed Reconfiguration of
5 Lots to 4 Lots – Grant Street, Noosa Heads” numbered 0703.0A4 prepared by Ian Gorton Design except
as modified herein
3. Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the currency period is four (4) years
from the day this permit takes effect during which time all conditions must have been complied with,
operational works completed, and the Plan of Survey lodged with the Council for endorsement.
4. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
Council's adopted fee schedule.
5. Pursuant to Section 3.7.3(b) of the Integrated Planning Act, all outstanding rates and charges due and
payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
the Plan of Survey for each stage.
6. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.
7. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work: -
7.1. Access
7.2. Stormwater
7.3. Sewer reticulation including new mains, relocations, diversions, pump stations and rising mains.
8. The person acting on this permit shall apply and obtain for all other necessary permits including crane
permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals
required under any other Act.
9. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the proposed
development.
If any person acting under this permit damages any Council property or facilities (such as underground
drainage, water supply and sewerage) , through any cause whatsoever in the course of, directly or
indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
Development. Alternatively, the Applicant may request the Council to carry out the rectification works.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 10
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and where no
reasonable attempt has been made to complete the rectification works as part of the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement
of the Plan of Survey.
10. The Assessment Manager for building work shall ensure that all other permits required by this permit have
been obtained and outcomes from imposed conditions incorporated into the building plans prior to issue
of a Development Permit for Building Works.
Civil Works
11. All redundant vehicular crossings to the site shall be removed and replaced by kerb and channel and
footpath paving in accordance.
12. The existing access driveway at the rear of the sites shall be extended to the proposed common boundary
of proposed Lots 3 and 4. The access driveway shall be:
12.1. Constructed of similar materials as the existing driveway with a minimum width of 3.0 metres,
12.2. Designed and constructed in accordance with the requirements of Council’s Planning Scheme
Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks, shall reference
where applicable to Council’s Standard Drawings and shall incorporate best engineering practice.
13. All designs for engineering works involving the construction of sewerage reticulation shall be prepared in
accordance with the requirements of Council's Planning Scheme Policy PSP06 – Engineering Design
Standards – Water and Sewerage, shall reference where applicable to Council’s Standard Drawings and
shall incorporate best engineering practice. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
14. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
15. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
16. Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil Engineer
shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this
permit. The engineer shall certify that he has supervised those works and that they have been completed
in a workman like manner in accordance with good engineering practice and in accordance with that
permit.
17. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
Water
18. The site shall be connected to Council’s Water Supply and Sewerage reticulation systems to the Water
and Sewerage design guidelines and the requirements of the Manager - Land Development, at no cost to
Council.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 10
19. The existing water meters shall be relocated and disconnected where necessary to suit the approved lot
layout. The works shall be undertaken by Council at the applicant’s cost to facilitate compliance with
Council’s Planning Scheme Policy PSP06 – Engineering Design Standards – Water and Sewerage.
Water meters shall be located on opposite boundaries to Energex pillar boxes.
Sewer
20. Prior to Council endorsement of the Plan of Survey, the applicant shall submit to Council plans prepared
by a registered Professional Civil Engineer showing surface levels and calculations to verify existing
sewer house connections to proposed lots 2, 3 and 4 are suitably located and fully control the allotments
being served. Refer Noosa Shire Council Planning Scheme Policy 6 - Water and Sewerage Design
Standards.
21. The existing sewer within easements A and C in proposed lot 1 shall be modified such that the sewer
terminates in a manhole immediately south of the northern side of Easement E. All works are to comply
with Noosa Shire Council Planning Scheme Policy PSP06 – Engineering Design Standards – Water and
Sewerage.
An Operational Works - Sewer reticulation application must be submitted in respect to sewerage
modification works.
22. Detailed design drawings and calculations shall be submitted with an application for a Development
Permit for Operation Works in respect of water or sewer works. To avoid conflict with other underground
pipes or services, all existing and proposed services required by the development shall be shown on the
plans.
23. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council.
Stormwater
24. Roof and surface water is to be collected on site and is to be discharged through a single underground
drain line into the existing drainage structures at the rear of the lots and to the reasonable satisfaction of
the Manager - Land Development. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the drainage scheme.
25. The existing stormwater pits located adjacent to the rear boundaries of the lots shall be relocated such
that a pit and connection point is available in each new lot. The works shall be designed and constructed
in accordance with the requirements of Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks, shall reference where applicable to Council’s Standard
Drawings and shall incorporate best engineering practice.
26. All site drainage shall be by means of gravity systems.
Power/Telecommunications
27. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed designs shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
(prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
lots.
28. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
new telephone services to the proposed lots. In this regard written confirmation from an approved
telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
Survey.
29. Any alteration of a public utility or other facility necessitated by the development of the land or associated
construction works either internal or external to the site shall be at no cost to Council.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 10
Easements
30. The existing easements within Lots 1-5 on SP179879 shall be suitable modified to comply with the
approved plan or as otherwise required by conditions contained herein.
31. The proposed access easement across the rear of Lots 1, 2 and 3 shall be of sufficient width to allow
vehicles to pass on the rear driveway in those locations where the driveway surface extends into each lot
to service their individual garaging.
32. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of
Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
endorsing of the Plan of Survey.
33. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles
Office forms or requisitions requiring the consent of Council being attended to forthwith.
34. Registered easements are to be provided on the Plan of Survey over all sewerage mains within private
property. Easements are to be equivalent in width to twice the depth to invert level of the sewer at the
deepest point within the allotment. Easements are to be provided parallel to and centred over the sewer
line, with a minimum width of 3.0 metres.
Environmental
35. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
Management) Act 2002 are to be controlled on the site prior to Council endorsement of the plan of survey.
In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it
shall mean removal of the plants where they threaten environmentally significant areas of the site such as
riparian zones and areas of natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient natural
regeneration of native species, the areas shall be replanted with endemic native species so that a
sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the weed
treatment and replanting is complete.
36. The existing vegetation on the site shall be retained except where removal is required to enable
construction of services, pegging of surveyed boundaries or as otherwise approved under any subsequent
Development Permit. Particular care shall be taken not to disturb vegetation adjacent to existing creeks
and watercourses.
37. Cleared vegetation is to be suitably processed by one of the following methods and removed from the
site:-
37.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.
37.2. Disposal for firewood.
37.3. Disposal for landscaping purposes.
37.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application for a
Development Permit for Operational Work. The Applicant is advised that other methods may be
considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 10
Security
38. Prior to commencement of any operational works arising out of this permit, security in the sum of $5,000
must be lodged with Noosa Council, to secure performance of all conditions of this permit. The security
shall be in the form of cash or unconditional trading bank guarantee acceptable to the Manager - Land
Development.
The security will be returned upon satisfactory performance of all the conditions of this permit and any
other related development permits for operational works, less any costs incurred by Council in ensuring
compliance with these conditions or for any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
General
39. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particulate matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
40. A programme of works is to be submitted with any application for any Development Permit for Operational
Works detailing the construction schedule and proposed environmental protection measures.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be
submitted to Council’s Works Inspector within seven (7) days.
41. Operational works shall be carried out in a manner that prevents:-
41.1. Pollution of a waterway
41.2. Dust/sand nuisance to residents in the vicinity
41.3. Transfer of dirt and debris onto a public road
41.4. Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries)
41.5. Excessive traffic delays (less than 5 minute delays)
41.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of
construction equipment etc.)
42. Where operational works are likely to affect nearby residents, at least 3 days notice of commencement of
work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to
affected residents.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The following steps shall be undertaken prior to commencement of any construction:-
1.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
commence works.
1.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each
contractor has public liability insurance in the sum of $10,000,000 and copies of current public
liability insurance policies are submitted to Council’s inspector.
1.3. The Principal Contractor shall nominate a site representative and give a telephone number that
can reach the site representative at any time during a 24-hour day.
1.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
requirements for construction of access.
1.5. All signage, including that for safety during construction, shall be in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide.
2. Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
manager.
3. The development should be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
12 – Control of Nuisances.
4. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 10
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 10
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
Used in these records