Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
obstructions; S7.4 The provision of bicycle lanes at intersections is Not applicable for this development.
ii. an access area for vehicles onto properties; generally in accordance with AUSTROADS Part 14, section 5
iii. a corridor allocated for services and utilities; and the Manual of Urban Traffic Control Devices (MUTCD)
and Part 9.
iv. additional amenity for minor roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and The proposed development works will
planned, designed and constructed to— construction is in accordance with Section 4 of PSP5 comply with this requirement as
a) be accessible, cost effective and easily Engineering Design Standards – Roads, Drainage and shown on the preliminary civil
maintainable; Earthworks; engineering design drawings.
b) protect downstream capacity; AND
c) protect downstream water quality;
S8.2 As Constructed data is submitted in accordance with The proposed development works will
d) maximise on-site stormwater retention and
Section 6 of PSP5 Engineering Design Standards – Roads, comply with this requirement.
retardation; and
Drainage and Earthworks;
e) convey run-off to stormwater drainage in a
AND
manner that allows roads to be trafficable in
Q100 ARI local rainfall events. S8.3 Stormwater drainage planning, design and The proposed development works will
construction is in accordance with the Queensland Urban comply with this requirement as
Drainage Design Manual. shown on the preliminary civil
engineering design drawings.
S9.1 Roads and stormwater drainage infrastructure is The proposed development works will
O9 Roads and stormwater drainage infrastructure constructed in accordance with— comply with this requirement as
is constructed— a) Sections 2, 3 and 4 of PSP5 Engineering Design Standards shown on the preliminary civil
a) in accordance with appropriate engineering – Roads, Drainage and Earthworks; engineering design drawings.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.