MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
d. MUSIC Model Results
Using the MUSIC software. The individual treatment trains for each of the four catchment
areas were designed to comply with the water quality objectives (WQO). It was determined
that the water quality objectives for the whole proposed development where met as shown in
the table below:
Pre- Post- Reduction Complying
POLLUTANT TYPES
Development Development (%) With WQO
Total Suspended Solids (kg/yr) 18300 3250 82.2
Total Phosphorus (kg/yr) 35.8 14.1 60.7
Total Nitrogen (kg/yr) 194 101 47.9
Litter/gross pollutants (kg/yr) 989 0 100.0
Table 5.9: Water Quality Treatment Results
As shown by the above results, the proposed stormwater treatment train adopts best practise
stormwater treatment and will achieve the required Water Quality Objectives.
e. Service Station and Car Wash Treatment
The treatment of the water runoff from the service station and car wash areas has been
excluded from the MUSIC model as these areas will be treated separately.
Service Station and Car Wash Assessment
While the site is not within Brisbane City Council, the acceptable solutions from the BCC
Guidelines for Stormwater from Service Stations & Fuel Dispensing Areas (FDA) will be used as
a reference for stormwater treatment for the service station and car wash areas under the
building canopy and areas outside of the canopy.
Under Canopy Areas:
• All ground surfaces within the FDA shall be constructed of concrete with all gaps
and/or cracks filled so that the impervious barrier and integrity is maintained.
• The FDA shall be delineated by painted line-work on the ground. Other methods of
delineating the FDA may be used e.g. Roll-over bunds, different colour concretes, etc.
• Signs indicating fate of flow such as “flows to containment vessel” shall be provided in
locations around the under-canopy area
• The area shall be graded to a suitable underground containment vessel (i.e.
sump/tank) compatible with petroleum products and other likely chemicals. The tank
shall have no connections to stormwater or sewer. The containment vessel shall be
constructed of precast concrete with a minimum certified design life of 50 years and
be designed in accordance with AS 3600 - “Concrete Structures”. All internal concrete
surfaces that may be exposed to contact with petroleum hydrocarbons shall be coated
with an epoxy resin, to a minimum dry film thickness of 200 microns, applied in
accordance with the supplier’s recommendations. Joints shall be made with epoxy or
rubber ring seals. Epoxy joints shall be Megapoxy P1 or approved equivalent and used
in accordance with supplier’s recommendations. For joints using a rubber ring seal,
A PO Box 26, Carina Q 4152 14 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.