Original source · versioned page text
MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
The Noosa Plan Including amendments to 16 September 2013 Controlling Factors ed} Score Checking e Clay loam 2 e Clay soil 2 Anticipated duration of site disturbance: (see 2 below) e Duration < 2 weeks 0 * 2weeks # Duration < 3 months 2 5 e 3months # Duration <6 months 4 e Duration > 6 months 5 Month that works are undertaken: (see 3 below) e August, September 0 e April, May, June, July, November, October 1 2 e March December 2 e January February 3 Offsite sediment control (i.e. down slope of the soil disturbance): e Score 1 point if there is no purpose built, operational 1 and well maintained sediment traps (eg. sediment basin, gross pollutant trap or purpose built wetland) 0 to catch sediment before it enters a water body with environmental values (eg. creek, natural wetland, river or bay) (see 4 below) Run-off entering the site: e Score 1 point if stormwater run off entering the site is 1 1 not diverted away from the soil disturbance Extent of site disturbance: e Score 2 points if building work requires reshaping of the ground surface (eg. ‘cut and fill’ works) (see 5 2 below) 5 e Score 5 points if the area to be disturbed is greater 5 than 600m? Works within environmentally sensitive areas: e Score 11 points if the disturbance is within the banks of a watercourse (see 6 below) 11 e Score 5 points if the disturbance is within 50m of the top of bank of a watercourse 5 5 e Score 2 points if the disturbance is between 50m and 100m of the top of bank of a watercourse 2 TOTAL SCORE (See 7 & 8 below) 2 1 Notes: 1. Where there is more than one type of soil on the site, select the category with the highest point value. 2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will be fully stabilised (eg. grassing). 3. If this time span covers more than one category, select the category with the highest point value. Note that if there is no grass/vegetation cover on the site before building work has started, the time span Starts from the time this form is completed. 4. [f you are not sure, score 7 point. 5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining wall above and/or below the building slab, greater than 1 metre in height. If the building slab has already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points. 6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or intermittently. 7. Fora high risk site, the total score is = 14 points. 8. Fora low risk site, the total score is < 14 points. $2.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.