MATERIALS INSTALLATION (COMPOST-FILLED SOCKS) 5. IF SEVERE SOIL EROSION OCCURS EITHER REMOVAL
UNDER OR AROUND THE CHECK DAMS, THEN
ROCK: 150 TO 300mm EQUIVALENT DIAMETER, 1. REFER TO APPROVED PLANS FOR LOCATION SEEK EXPERT ADVICE ON AN ALTERNATIVE 1. WHEN CONSTRUCTION WORK WITHIN THE
HARD, EROSION RESISTANT ROCK. AND INSTALLATION DETAILS. IF THERE ARE TREATMENT MEASURE. DRAINAGE AREA ABOVE THE CHECK DAMS
QUESTIONS OR PROBLEMS WITH THE HAS BEEN COMPLETED AND DISTURBED
SANDBAGS: GEOTEXTILE BAGS (WOVEN LOCATION OR METHOD OF INSTALLATION AREAS SUFFICIENTLY STABILISED TO
6. DE-SILT SEDIMENT TRAP IF THE SEDIMENT
SYNTHETIC, OR NON-WOVEN CONTACT THE ENGINEER OR RESPONSIBLE RESTRAIN EROSION, THE DAMS MUST BE
LEVEL EXCEEDS 1/3 THE CREST HEIGHT.
BIODEGRADABLE) FILLED WITH CLEAN ON-SITE OFFICER FOR ASSISTANCE. REMOVED, UNLESS THE SEDIMENT TRAPS ARE
COARSE SAND, CLEAN AGGREGATE, OR TO REMAIN AS A PERMANENT FEATURE.
7. DISPOSE OF COLLECTED SEDIMENT IN A
COMPOST. 2. PRIOR TO PLACEMENT OF THE SEDIMENT SUITABLE MANNER THAT WILL NOT CAUSE AN
TRAP, ENSURE THE DRAINAGE CHANNEL IS EROSION OR POLLUTION HAZARD. 2. REMOVE COLLECTED SEDIMENT AND
INSTALLATION (ROCK CHECK DAM) DEEP ENOUGH TO PREVENT WATER BEING DISPOSE OF IN A SUITABLE MANNER THAT WILL
UNSAFELY DIVERTED OUT OF THE DRAIN NOT CAUSE AN EROSION OR POLLUTION
1. REFER TO APPROVED PLANS FOR LOCATION
ONCE THE CHECK DAMS ARE INSTALLED. HAZARD.
AND INSTALLATION DETAILS. IF THERE ARE
QUESTIONS OR PROBLEMS WITH THE
3. LOCATE EACH SOCK AS DIRECTED WITHIN 3. REMOVE AND APPROPRIATELY DISPOSE OF
LOCATION OR METHOD OF INSTALLATION
THE APPROVED PLANS, OR OTHERWISE AT ALL MATERIALS INCLUDING ANY GEOTEXTILE
CONTACT THE ENGINEER OR RESPONSIBLE
SUCH A SPACING TO ACHIEVE THE REQUIRED FABRIC.
ON-SITE OFFICER FOR ASSISTANCE.
SEDIMENT TRAPPING OUTCOMES.
4. STABILISE THE DISTURBED CHANNEL WITH A
2. PRIOR TO PLACEMENT OF THE SEDIMENT
4. PLACE EACH SOCK TO THE LINES AND LINING OF FABRIC AND ROCK, OR ESTABLISH
TRAP, ENSURE THE DRAINAGE CHANNEL IS
PROFILE SHOWN IN THE APPROVED PLAN OR VEGETATION AS APPROPRIATE.
DEEP ENOUGH TO PREVENT WATER BEING
AS DIRECTED BY THE SITE SUPERVISOR.
UNSAFELY DIVERTED OUT OF THE DRAIN
ONCE THE CHECK DAMS ARE INSTALLED.
5. ENSURE EACH SOCK EXTENDS UP THE
CHANNEL BANKS (WHERE PRACTICAL) TO A
3. LOCATE EACH CHECK DAM SEDIMENT TRAP
LEVEL AT LEAST 100mm ABOVE THE CREST
AS DIRECTED WITHIN THE APPROVED PLANS,
LEVEL OF THE CHECK DAM.
OR OTHERWISE AT SUCH A SPACING TO
ACHIEVE THE REQUIRED SEDIMENT TRAPPING
MAINTENANCE
OUTCOMES.
1. INSPECT EACH CHECK DAM AND THE
4. IF THE CHECK DAMS ARE ALSO BEING USED DRAINAGE CHANNEL AT LEAST WEEKLY AND
TO CONTROL EROSION WITHIN THE DRAINAGE Pond surface area (As)
AFTER RUNOFF-PRODUCING RAINFALL.
CHANNEL, THEN LOCATE EACH SUCCESSIVE
CHECK DAM SUCH THAT THE CREST OF THE 2. CORRECT ALL DAMAGE IMMEDIATELY. IF
IMMEDIATE DOWNSTREAM DAM IS LEVEL WITH SIGNIFICANT EROSION OCCURS BETWEEN
THE CHANNEL INVERT AT THE IMMEDIATE ANY OF THE CHECK DAMS, THEN CHECK THE
UPSTREAM CHECK DAM. SPACING OF THE DAMS AND WHERE
NECESSARY INSTALL INTERMEDIATE CHECK
5. CONSTRUCT EACH CHECK DAM TO THE DAMS OR A SUITABLE CHANNEL LINER.
DIMENSIONS AND PROFILE SHOWN WITHIN
THE APPROVED PLAN. 3. CHECK FOR DISPLACEMENT OF THE CHECK
DAMS.
6. WHERE SPECIFIED, THE CHECK DAMS MUST
BE CONSTRUCTED ON A SHEET OF 4. CHECK FOR SOIL SCOUR AROUND THE
Catchments & Creeks Pty Ltd
GEOTEXTILE FABRIC USED AS A DOWNSTREAM ENDS OF EACH CHECK DAM. IF SUCH
SPLASH PAD. EROSION IS OCCURRING, CONSIDER Figure 1 - Placement of check dam sediment traps
EXTENDING THE WIDTH OF THE CHECK DAM
7. EACH CHECK DAM MUST BE EXTENDED UP TO AVOID SUCH PROBLEMS.
THE CHANNEL BANK (WHERE PRACTICABLE)
TO AN ELEVATION AT LEAST 150mm ABOVE THE Drawn: Date:
CREST LEVEL OF THE DAM. GMW Apr-10 Check Dam Sediment Trap CDT-01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.