CONSTRUCTION STRUCTURE (IF ANY), THEN MAKE ALL
NECESSARY REPAIRS AND MAINTENANCE L = 2.4 m (min)
1. REFER TO APPROVED PLANS FOR TO RESTORE THE DESIRED FLOW
LOCATION AND CONSTRUCTION DETAILS. CONDITIONS.
MAKE PIT SAFE BY
IF THERE ARE QUESTIONS OR PROBLEMS Fabric may need to be
FENCING OR OTHER MEANS
WITH THE LOCATION, OR METHOD OF 4. CHECK THE STRUCTURE AND placed on the inflow bank
INSTALLATION, CONTACT THE ENGINEER SURROUNDING CHANNEL BANKS FOR Flow
to provide scour protection
OR RESPONSIBLE ON-SITE OFFICER FOR DAMAGE FROM OVERTOPPING FLOWS
ASSISTANCE. AND MAKE REPAIRS AS NECESSARY.
0.6 m (min)
2. CLEAR THE FOUNDATION AREA OF THE 5. REMOVE SEDIMENT AND RESTORE 1.0 m (max)
OUTLET STRUCTURE (IF ANY), AND ORIGINAL SEDIMENT STORAGE VOLUME Excavated
INSTALL AS PER SEPARATE WHEN COLLECTED SEDIMENT EXCEEDS sediment trap
INSTRUCTIONS. 30% OF THE PIT VOLUME.
3. EXCAVATE THE SETTLING POND IN 6. DISPOSE OF SEDIMENT AND DEBRIS IN
ACCORDANCE WITH THE APPROVED A MANNER THAT WILL NOT CREATE AN
(a) Excavated sediment trap located within a
PLANS. UNLESS OTHERWISE SPECIFIED, EROSION OR POLLUTION HAZARD. minor drainage path
THE EXCAVATED PIT SHOULD HAVE A
SIDE SLOPE OF 2:1(H:V) OR FLATTER. REMOVAL
4. APPROPRIATELY STABILISE ANY BANK 1. WHEN THE UP-SLOPE DRAINAGE AREA
SUBJECT TO DIRECT INFLOW. HAS BEEN STABILISED, REMOVE ALL
MATERIALS INCLUDED DEPOSITED L1 = 5D (min) L2 = 2.4 m or 7D (min)
5. ESTABLISH ALL NECESSARY UP-SLOPE SEDIMENT AND DISPOSE OF IN A ideal: 10D (min) (whichever is the greater)
DRAINAGE CONTROL MEASURES TO SUITABLE MANNER THAT WILL NOT
ENSURE THAT SEDIMENT-LADEN RUNOFF CAUSE AN EROSION OR POLLUTION
IS APPROPRIATELY DIRECTED INTO THE HAZARD. MAKE PIT SAFE BY
SEDIMENT TRAP. FENCING OR OTHER MEANS
Flow
2. ALL WATER AND SEDIMENT SHOULD BE D
6. TAKE ALL NECESSARY MEASURE TO REMOVED FROM THE BASIN PRIOR TO
MINIMISE THE SAFETY RISK CAUSED BY THE DAM’S REMOVAL. DISPOSE OF
THE STRUCTURE. SEDIMENT AND WATER IN A MANNER
THAT WILL NOT CREATE AN EROSION OR 0.6 m (min)
MAINTENANCE POLLUTION HAZARD. 1.0 m (max)
Excavated
sediment trap
1. CHECK EXCAVATED SEDIMENT TRAPS 3. BRING THE DISTURBED AREA TO A
AFTER EACH RUNOFF EVENT AND MAKE PROPER GRADE, THEN SMOOTH,
REPAIRS IMMEDIATELY. COMPACT AND STABILISE AND/OR Where space is not available, make optimum use of the available space
REVEGETATE AS REQUIRED.
2. INSPECT THE BANKS FOR SLUMPING
Catchments & Creeks Pty Ltd
OR EXCESSIVE SCOUR.
(b) Excavated sediment trap located downstream
of a stormwater outlet
3. IF FLOW THROUGH THE STRUCTURE IS
REDUCED TO AN UNACCEPTABLE LEVEL Drawn: Date:
DUE TO BLOCKAGE OF THE OUTLET
GMW Apr-10 Excavated Sediment Trap EST-01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.