Performance Outcomes                                                Acceptable Outcomes
Stormwater drainage infrastructure is planned, designed and         Stormwater drainage planning, design and construction is in
constructed to:                                                     accordance with PSP6 Engineering Design Standards ­ Roads,
(a)   incorporate allowance for increased flood risk and tidal      drainage and earthworks and the latest version of the
      inundation through pipework as a result of cilmate change     Queensland Urban Drainage Design Manual.
      and sea level rise;                                                                          Able to Comply
(b)   ensure the development is adequately drained; and             AO2.2
                                                                    The stormwater drainage system connects to a lawful point of
(c)   ensure stormwater is managed and lawfully discharged          discharge in accordance with PSP6 Engineering Design
      without altering stormwater drainage characteristics
      external to the site.                                         Standards ­ Roads, drainage and earthworks.
                                                                                             Able to Comply - water continues to
                                                                    AO2.3                  flow to creek (legal point of discharge)
                                                                    Stormwater flows discharging from the development are
                                                                    demonstrated to be consistent with pre­development
                                                                    characteristics.
                                                                                        Able to Comply - water continues to
                                                                                        flow to creek (legal point of discharge)
                                                                    AO2.4
                                                                    Development provides for the management of stormwater to
                                                                    incorporate appropriate allowance for climate change impacts
                                                                    (including rainfall intensity and sea level rise), in accordance with
                                                                    PSP6 Engineering Design Standards – Roads, Drainage and
                                                                    Earthworks.      Able to Comply - water continues to
                                                                                    flow to creek (legal point of discharge)
PO3                                                                 AO3.1
Stormwater drainage infrastructure conveys run­off in a manner      Stormwater drainage infrastructure meets the desired standards
that allows roads to deliver desired standards of service           of service for roads functionality set out in PSP6 Engineering
appropriate to the local conditions and local stormwater drainage   Design Standards ­ Roads, Drainage and Earthworks.
characteristics.                                                                      Able to Comply - no impacts to roads
PO4                                                                 AO4.1
Stormwater infrastructure is compatible with existing               The location, design and construction of stormwater drainage
infrastructure, allows for easy access for the ongoing              structures is in accordance with PSP6 Engineering Design
maintenance by Council, is cost effective across its design life.   Standards ­ Roads, drainage and earthworks.
                                                                                              Able to Comply
                                                                    AO4.2
                                                                    Where infrastructure is located on private land an easement is
                                                                    dedicated over the infrastructure in accordance with PSP6
                                                                    Engineering Design Standards ­ Roads, drainage and
                                                                    earthworks.
                                                                                 Not Applicable - related to new infrastructure
                                                                    AO4.3
                                                                    Any alterations or repairs to infrastructure as a result of the
                                                                    development are made at no cost to Council.
                                                                             Not Applicable - related to new infrastructure
                                                                    AO4.4
                                                                    Development avoids stormwater inflow and infiltration to the
                                                                    sewer infrastructure network.
                                                                               Not Applicable - Drains away from sewer
                                                                    AO4.5
                                                                    Stormwater infrastructure is designed to minimise maintenance
                                                                    costs and the requirement for specialized equipment for
                                                                    maintenance techniques.
                                                                                Not Applicable - related to new infrastructure
PO5                                                                 AO5.1
Stormwater drainage infrastructure is aligned to avoid crossing     Stormwater drainage infrastructure avoids crossing waterways,
waterways, wetlands, drainage lines and ecological important        wetlands drainage lines and ecologically important areas or
areas, or where it is demonstrated this is unavoidable, disturbed   follows the edge of existing disturbed areas.
areas are reinstated and revegetated upon completion of works.
                                                                                            Able to Comply

                                               NOOSA PLAN 2020 ­ AMENDED AT 25 SEPTEMBER 2020                                     Page 2 of 7
Log in to download the original file

water quality code.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.