Council archive · source document
07/2023 - MCU - Detached House [As Published] · 132007.2023
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7 ape Noosa Council Conditions INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION General Conditions 1. 10. 11. 12. 13. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plan unnumbered, drawn Contract Design Staff, titled Proposed Site Plan and as may be amended by these conditions. Infrastructure including reticulated water, sewerage, stormwater, and electricity are protected from damage and made safe to the standard required by the regulatory authority; All infrastructure must be disconnected, capped or sealed including-- a) electricity meters removed and electrical wires disconnected; and b) telephone lines are disconnected; and c) high speed data cables and television provider boxes are disconnected and removed to the standard required by the regulatory authority; All building materials containing asbestos, ‘including asbestos cement sheeting or roofing and lagging, must be removed from the building and disposed of in accordance with industry best practice. Waste generated during construction must be stockpiled in a centralised location and covered as tequired to prevent material being blown onto adjoining properties including the road reserve or food waste from generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly or via an approved waste receptacle and ‘collection service. Storage areas are to be located near the temporary access to the site so that access can be gained with out damage to infrastructure. All building materials containing asbestos products must be disposed on in accordance with industry best practice. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel; Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions. Sediment and erosion control measures must be placed on site prior to the works commencing and shall be maintained until all works are complete. The erosion and sediment control measures shall be in accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by Healthy Waterways (copy attached or available at www.healthywaterways.org). All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed areas are revegetated using species identified in PSP3 — Landscaping Plants and Guidelines The transportation of all materials to and from the site must be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle The works must be undertaken in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or Council's Local Law No. 12 — Control of Nuisances. Prior to the commencement of development, the following Development Permits must be obtained:- 13.1 Development Permit for building works. End of Conditions A c.\docume~T\bsa1~1.nooVocals~ 71\emp\q1341decnotice 151566.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2023 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.