Skip to the record
Beware of cheap imitations.

Council archive · source document

SITE Traffic - Noosa Shores Resort Car Park FINAL · 51901.3969.02

of 7

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

As part of preparing this design we have also carried out vehicle swept path analysis
of a B99 vehicle manoeuvring from the new visitor car park # V8.
The vehicle swept analysis options are provided in attached plans, and demonstrate
adequate room is available for manoeuvring.




Figure 3:       Proposed New Parking Space Area # V8


Following our assessment, we advise that incorporating the above
recommendations will maintain adequate compliance with your DA
conditions and relevant Australian Standards.


                                         ~~~


Please do not hesitate to contact me should you wish to discuss or clarify any elements
of this assessment or attached plans.



Yours Faithfully,
SITE Traffic Pty Ltd




Marko Mrsic
Managing Director
Principal Traffic Engineer




                                                                               Page | 4

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SITE Traffic - Noosa Shores Resort Car Park FINAL.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.