Original source · versioned page text
Amended Stormwater Management Report
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
LEGEND
NOTES
W
W
V
SECTION
THE
ESPLANADE
SECTION
DESIGNED SURVEYOR DATUM DRAWING STATUS
PROJECT
BRISBANE T 07 3852 4333
DRAWN E [email protected]
CHECKED GOLD COAST T 07 5571 1599
LOCATION DRAWING NUMBER
E [email protected] USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES
APPROVED CHECK WITH THE PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT
SUNSHINE COAST T 07 5391 3777 WORK FROM REDUCED SCALE DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL
For and on behalf of E [email protected] DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN WESTERA PARTNERS
TITLE
DATE SHEET NUMBER REVISION
WESTERA PARTNERS PTY. LTD. AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! IT IS
NORTHERN NSW T 02 6674 8047 THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH
No. DATE REVISIONS DES DRN CHK APD DOCUMENT CONTROL APPROVED www.westerapartners.com.au ABN 52 097 417 975 E [email protected] DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.