Original source · versioned page text
Minor Change Existing Approval MCU16 0079.02
Officer: Patrick Murphy Direct Telephone: 53296436 Our Reference: MCU16/0079.02 Your Reference: n/a 22 October 2018 Tewantin Noosa Rsl & Citizens Memorial Club Inc PO Box 15 TEWANTIN QLD 4565 [email protected] Dear Sir Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 22 May 2018, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: MCU16/0079.02 Street address: 5 Memorial Ave Tewantin Real property description: Lot 3 T 16319 Planning Scheme: The Noosa Plan (27 November 2017) Decision details The following type of approval was issued on 16 February 2017 Development Permit for Material Change of Use of Premises – Extensions to existing RSL Club In relation to the request to make a minor change to the existing approval, Council on 18 October 2018, decided to approve the requested changes. The changes are detailed below. A. Agee to amend conditions 2 and 3: currency period of approval The currency period for this development approval is 4 years starting the day that the original development approval MCU16/0079 took effect. assessment manager conditions PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1620/DA/1.02 D Existing/Demolition Ground Floor Plan 15/05/17 1620/DA/2.01 P Proposed Basement Plan – Stage 4 28/07/17 1620/DA/2.02 L Proposed Ground Floor Plan – Stage 4 28/07/17 1620/DA/2.05 K Proposed Roof Plan – Stage 4 28/07/17 1620/DA/3.01 G Sections – Stage 4 28/07/17 1620/DA/4.01 K Elevations – Stage 4 28/07/17 1620/DA/5.01 G Landscape Concept Strategy – Plan 28/07/17 1620/DA/5.02 E Landscape Concept Strategy 28/07/17 For clarity, in regard to Plan No. 1620/DA/2.02 Rev. L Proposed Ground Floor Plan – Stage 4 dated 28/07/17 the maximum number of gaming machines is limited to 195 machines. Nature and Extent of Approved Use 3. The proposed development provides for an extension to the Gaming Area (providing for a maximum of 195 gaming machines and limited to a maximum floor area of 565m2), Smokers Terrace, Store, Children’s Lounge, basement carpark area and other internal modifications as shown on the approved plans. 4. The proposed Children’s Lounge is to remain an enclosed structure and is not to be used as an open balcony or break out area in association with the Function Room. 5. The proposed development shall be setback at least 2m from the Pelican Street frontage and 4m from Doonella Street, with the exception of Stair 3, which is to be setback not less than 0.85m. The basement carpark area is to remain predominantly an open structure, where above ground level, with all openings fitted with open timber battens as shown on the approved plans. The building setback areas to the basement shall be densely landscaped to screen the basement area from both Doonella and Pelican Streets. 6. Access and egress to the existing Function Room is to be obtained via the main entry to the RSL building and is not via the doors providing access to the new service carpark area at this level. These doors are not to be used in association with an additional break out area by patrons using the Function Room. 7. All open space areas shown on the Overall Site Plan, prepared by Planit Consulting, dated September 2016 and Landscape Concept Strategy Plans 1620/DA/5.01 Rev E and 1620/DA/5.02 Rev C dated 30/01/17, are to be landscaped in accordance with the Statement of Landscape Intent provided. The applicant is required to provide the equivalent number of mature trees lost by the development of the site, in the landscaped open space areas. A number of larger trees are to be provided in the open space area to the north of the RSL development and behind the existing commercial buildings on the subject land. The landscaping of the open space areas is to be undertaken to the reasonable satisfaction of the Manager, Planning and Environment. 8. The length of the car park podium to the Pelican Street frontage must be broken up through the use of large feature trees at the Pelican Street/Doonella Street corner and again at the entrance to the car park from Doonella Street as shown on the Landscape Concept Strategy – Plan 1620/DA/5.01 Rev E dated 30/01/17. 9. The landscape planter boxes shown on the proposed ground floor plan Drawing No. 1620/DA/2.02 revision L dated 28/07/17 at the rear podium car park must provide for a minimum soil depth and width of 600mm and incorporate appropriate drainage and plumbed irrigation. The landscape planter boxes must be located immediately adjacent the approved building as shown on the Landscape Concept Strategy – Plan 1620/DA/5.01 Rev G dated 28/07/17 10. Security gates must be designed to reflect the overall architectural finishes of the building by using battening. 11. The access driveway to Doonella Street must be closed to all vehicles after 7pm at night, with a security gate installed for this purpose. 12. Prior to the installation of ‘timber look aluminium louvre screens’, ‘timber look aluminium rafters’ and ‘timber look aluminium batten screens’, a sample of the material must be provided to Council demonstrating to Council’s reasonable satisfaction that the material is reflective and in keeping with the heritage character of the area. Landscaping Works 13. The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan for that specific area and must include in particular: a. Local native species suitable for the site including advanced pot sizes of 25L, 45L and 100L. b. a 2 metre wide landscaping strip along the Pelican Street frontage of the subject site, exclusive of the access driveway, generally uncompromised by infrastructure items. The landscape design must include plants which screen the development to a minimum height of 4m. c. a 4 metre wide landscaping strip along the Doonella Street frontage of the subject site, exclusive of the access driveway, generally uncompromised by infrastructure items. The landscape design must include plants which screen the development to a minimum height of 4m. d. Planted grasses, shrubs and trees in landscaping beds to the existing grassed area in the car-park area servicing the post office. e. The existing trees located in the 2m Pelican Street frontage and the 4m Doonella Street frontage must be retained in accordance with an Arborist Report prepared by a qualified person* and endorsed through an Operational Works approval. Any trees nominated for removal must be replaced at a 2:1 ratio for each removed, with a minimum pot size of 100L. *(Refer to Advisory Note) 14. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. Building Height 15. The maximum height of the development must not exceed RL 17.880m (AHD) as shown on the approved plans for the development. Performance Bond 16. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000.00 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Sunset Clause for Completion of Approved Development 17. Pursuant to s342 of the Sustainable Planning Act 2009, the uncompleted aspects of this development approval lapses if the whole of the approved use has not happened by 19 January 2021. Building Appearance 18. All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. Noise 19. The applicant is to implement all of the recommended acoustic treatments provided in the Environmental Noise Impact Assessment, by CRG Acoustics, dated 11 July 2016, as they relate to Stage 4 of the development. The applicant is to provide additional noise attenuation for the smokers terrace area to prevent the reliance on staff having to manage subdued patrons using this area. Further, the applicant is to provide suitable sound attenuation for the bin storage area to reduce adverse noise impacts caused by rubbish being placed in the bins. These additional sound attenuation measures are to be certified by a suitably qualified and experienced noise expert. 20. The following specific acoustic treatments are to be applied to the building construction and design as outlined in the CRG Acoustics Report of 11 July 2016: a. Sound lock doors must be installed at the proposed smoker’s terrace as detailed in the development application plans (Rubicon: Proposed Ground Floor Plans: Stage 4 plan and Stage 5 & 6 plan). b. Driveways, ramps and car park areas must be finished with surface coatings which prevent tyre squeal (an uncoated surface is acceptable). c. All drainage grating over trafficable areas must be secured in a way that prevents rattling or nuisance noise. d. Car park exhaust ducting is to have acoustic insulation before and after any right angle bend (900) at the outlet end of the exhaust fan/s. e. Car park exhaust discharge riser is to be lined with 50mm thick insulation (hydrophobic fibreglass batts min. 32kg/m2 ) faced with perforated metal (min. 12% open face area) f. A minimum Rw 34 (i.e. 10.76mm laminate in acoustic grade frames and acoustic seals) must be used for all new external windows and glass doors of the function / dining extension, children’s lounge and the new alfresco lounge. g. New external walls of areas where amplified entertainment is proposed should be constructed to achieve a minimum Rw rating of 50. h. Roof/ceiling of areas where amplified entertainment is proposed should be constructed to achieve a minimum Rw rating of 50. i. At the time of installation, new mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors, pumps etc associated with Stage 4 of the development, should be installed within the building or suitably provided with noise reduction measures and located as to prevent a noise nuisance beyond the boundary of the site and not exceed the levels specified in Table 1. TABLE 1 NOISE LIMITS AT A SENSITIVE RECEPTOR PERIOD Noise level at noise sensitive place measured as the adjusted maximum sound pressure level (L10, adj,T) 7am – 6pm Background noise level (L90,T) plus 5 dB(A) 6pm – 10pm Background noise level plus 5 dB(A) 10pm – 7am Background noise level plus 3 dB(A) NOISE LIMITS AT A COMMERCIAL PLACE PERIOD Noise level at a commercial place measured as the adjusted maximum sound pressure level (L10, adj,T) 7am – 6pm Background noise level (L90,T) plus 10 dB(A) 6pm – 10pm Background noise level plus10 dB(A) 10pm – 7am Background noise level plus 8 dB(A) Acoustic Report 21. An acoustic report prepared by a suitably qualified person* is to be submitted to Council confirming assessment and certification of measured noise levels from the new mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors, pumps etc comply with the noise limits as set out in Table 1 and all other relevant noise conditions of this Decision Notice associated with Stage 4 of the development. 22. The report is to be submitted after commissioning any new equipment (with all plant and equipment operating at the same time) and when all building extensions are complete. 23. Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with Australian Standard AS1055.1 “Acoustics – Description and measurement of environmental noise – General procedures”. Suitably Qualified Person* - Certification For the purpose of measuring and certifying compliance with relevant noise conditions of this Decision Notice, a suitably qualified person is either: i. a Registered Professional Engineer of Queensland, or ii. an environmental consultant with a minimum of three (3) years current experience in the field of acoustics. Outdoor Lighting Devices 24. Lighting associated with the use must be designed, sited, installed and tested to comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting” using a control level of 1 and not cause a nuisance to the adjacent residential areas. 25. Vehicle headlight emissions from the carpark are to be adequately shielded to prevent spillage beyond the site into any adjacent residential buildings. External Works 26. The Doonella Street and Pelican Street frontages of the site must be upgraded for the full length to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. construction of a pedestrian footpath in accordance with the conditions of this Decision Notice b. removal of the existing property access points and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed c. relocation/reinstatement of existing on-street parking bays d. linemarking of the relocated/new on-street parking bays Site Access and Driveways 27. A sealed access driveway must be provided from Doonella Street and Pelican Street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. driveway crossovers in accordance with Council’s Standard drawing RS-051 b. suitable safety measures, including warning signage, to improve driver awareness of pedestrians and enhance pedestrian safety. Warning signage must be provided near the exit ramp from the underground parking area to warn motorists of pedestrian movement along the frontage street c. sight lines to pedestrians and vehicles in accordance with AS/NZS2890.1:2004. Certification of the design by an RPEQ must be provided as part of the Operational Works application Car Parking 28. A minimum of 120 car parking spaces and 4 motor cycle spaces must be provided and marked on the site and must be made available and accessible at all times while the use is open for business. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. provision of vandal resistant public lighting with intensities to satisfy the requirements of Australian Standard AS1158: Public Lighting Code b. Disabled parking spaces within the total c. dimensions, crossfalls and gradients in accordance with Australian Standard AS/NZS2890.1:2004 Parking Facilities 29. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. 30. Directional signage must be provided to direct visitors and customers to the car parking spaces provided on site Paving Treatment of Vehicle Movement Areas 31. Alternative materials, patterns, or threshold treatments must be used to articulate the pavement treatment of vehicle movement areas. Service Vehicles 32. Service vehicle parking, manoeuvring and standing spaces must be provided on the site. The works must be undertaken in accordance with an Operational Works approval and be in accordance with Council’s Planning Scheme Policy 9 – Waste Management. The development must include in particular delivery/service/waste areas that are accessible by a 12.5m vehicle. Pedestrian and Bicycle Facilities 33. Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. a 1.8 metre wide footpath within the road verge for the entire length of the site’s frontage to Pelican Street and Doonella Street. The path must be extended to the existing full width path in Memorial Avenue b. signage and lighting at strategic locations to direct people to building entries c. a total of 13 bicycle parking spaces Stormwater Drainage 34. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. a stormwater drainage system that collects and discharges runoff such that there is no net increase in stormwater runoff from the site. b. the use of gravity stormwater drainage and not surcharge pits. Stormwater Quality Management 35. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and achieve the pollution reduction targets of the State Planning Policy Appendix 2 Water Quality and be modelled in accordance with the Water by Design MUSIC modelling guidelines or the Water by Design deemed to comply solutions. 36. Stormwater quality treatment devices must be routinely checked, serviced and cleaned in accordance with the manufacturer’s recommendations or Water by Design “Maintaining Vegetated Stormwater Assets” guidelines. Records of all maintenance activities undertaken must be kept and made available to Council upon request. Where replacement cartridges or other necessary components for the system become unavailable, an alternative system is required to be retrofitted into the development to achieve an equivalent pollutant reduction outcome. 37. All primary stormwater quality treatment devices must be routinely checked, serviced and cleaned in accordance with the manufacturer’s recommendations. Records of all maintenance activities undertaken must be kept and made available to Council upon request. 38. The ongoing maintenance plan for the development must include the operations and maintenance manual for the water quality device/s and must include the full cost of maintaining the system. This maintenance plan must be provided as part of the subsequent operational works. Easements 39. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. 40. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. 41. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls 42. All excavation/filling and associated retaining structures must be undertaken in accordance with an Operational Works approval, and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. 43. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets 44. Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or b. where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. A lift must be provided for patrons to access the RSL from the basement car park. referral agencies Not Applicable Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). Noise Building Works Noise from building works associated with commercial and or industrial development should comply with the following – Limited to between 6:30am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays. Food Business Approval – Food Act 2006 For the new kitchen proposed in the development, the following is required: Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006 must obtain a Food Business License from council’s Environmental Health Section prior to use of those premises. Note: the business currently holds a Food Business licence no. FH10/ 0138. Plans and an application for amendment of Food Business Licence is to be made to council’s Environmental Health Section for approval prior to any building approval, fitting out or use of the premises. Note: a full plan assessment fee may apply if there are major alterations food preparation area. A statement indicating the purpose of the food premises, type of food sold, proposed menu and maximum number of patrons at any time, is to accompany the application for plan approval. Construction and use of the food premises must comply with the “Food Premises Design Construction and Fit-Out Guide” and the Food Safety Standards. Certification by a suitably qualified person* that the plan design and/or installation and operation of the mechanical exhaust ventilation system, complies with Australian Standard 1668 and the requirements of this Decision Notice must be submitted with the application for Licence. Completed Building Act 1975 Certificate Forms 15 and Form 16 must also be provided prior to commencement of food preparation. Horizontal hot air discharge from the mechanical exhaust ventilation system in the direction of neighboring properties and/or the street precincts is not desirable and may constitute an environmental nuisance under the Environmental Protection Act 1994. Toilets for customers and staff to be provided in accordance with the Building Code of Australia. Design advice is to be obtained from a building certifier on numbers and standards, including disabled access. For the purpose of certifying the kitchen mechanical exhaust ventilation system, a suitably qualified person is considered to be: a Registered Professional Engineer of Queensland; the manufacturer for the purposes of certifying the Building Act 1975 Certificate Form 15 a Qld Building Construction Commission Licenced Building Certifier for the purposes of certifying the Building Act 1975 Certificate Form 16 Environmental Protection Act It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware that a Notifiable Activity (as defined by Schedule 2 of the Act) is being carried out on the land, or that the land has been affected by a hazardous contaminant, they must, within 30 days after becoming so aware, give notice to the Department of Environment & Resource Management’s Contaminated Land Unit in the approved form. A person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm is defined as any adverse effect, or potential adverse effect whether temporary or permanent and of whatever magnitude, duration or frequency on an environmental value and includes environmental nuisance. Persons and entities, involved in the civil, earthworks, construction and operational phases of this development, are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. The development must not cause any interference with the environment or amenity of the area by reason of the emission of excessive noise or vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, atmospheric pollutants, waste water, waste products, grit, sediment, oil or otherwise, or cause hazards likely in the opinion of the administering authority to cause undue disturbance or annoyance to persons or affect property not connected with the use. All sand, silt, mud, paint, cement, concrete, builder’s waste, contaminants or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines under the Act apply for such offences. Kitchen exhaust points for the development must be located and operated in accordance with Australian Standard AS1668.2-2002 “The use of ventilation and air-conditioning in buildings” (specifically Section 5.10 – Air Discharges). Form 15 & Form 16 under the Building Code of Australia is required to be provided prior to use of the restraint starting operations where exhaust systems have been installed. property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required Development Permit for Building Works Development Permit for Operational Works (Earthworks, Stormwater, Access & Parking) self assessable codes Advertising Device Code submissions Nil reasons/grounds for approval Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully, Kerri Coyle Manager Development Assessment Enc: Appeal Rights Infrastructure Charge Notice Approved Plans/Documents cc. Unitywater DECISION NOTICE HISTORY Original Decision Notice – 16 February 2017. Decision Notice - Minor MCU16/0079.01 – 17 August 2017 - with an amendment to conditions 2, 9 & 12 and additional conditions 45 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 3 of 12 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 12 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image1.png (image text)] K Coy fs [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original