                                                             Officer:            Mark Lewis
                                                             Direct Telephone:   07 53296290
                                                             Our Reference:      MCU24/0069 OPW24/0070
                                                             Your Reference:     04808

               9 July 2024


               LVS Capital P/L TTE
               C/- The Jetty Specialist
               18 Ron Parkinson Cres
               CORBOULD PARK QLD 4551
               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 2 July 2024, Council decided to approve the
               application, subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU24/0069 & OPW24/0070

                   Street address:              22 Noosa Pde Noosa Heads Qld 4567

                   Real property description:   Lot 10 N 21841

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Material Change of Use - Landing – Residential and
               •       Development Permit for Operational Works – Prescribed Tidal Works – Pontoon and
                       Gangway
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                       Approved Plans
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.




               ABN 97.969.214.121                                                                    PO Box 141
               noosa.qld.gov.au                                                               Tewantin QLD 4565
               [email protected]                                                               07 5329 6500
                                                                                                         Page 1 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024
Full text of the other 14 pages

Page 2

                         Plan No.           Rev.   Plan/Document Name                        Date

                         TJS-04808-01       A      Site Plan & Water Allocation prepared 18 April 2023
                                                   by EDGE Consulting Engineers

                         TJS-04808-02       A      Layout Plan prepared        by   EDGE 18 April 2023
                                                   Consulting Engineers

                         TJS-04808-03       A      Elevation   prepared       by    EDGE 18 April 2023
                                                   Consulting Engineers

                         TJS-04808-04       A      Foam Details; Flat Deck Type with 18 April 2023
                                                   Deck Beams prepared by EDGE
                                                   Consulting Engineers

                         JSP-GW-006         M      Standard      Catwalk  Construction 14 January 2021
                                                   prepared     by   EDGE  Consulting
                                                   Engineers

                         JSP-SC-045         B      Steel Pile & H.D.P.E. Sleeve Detail 14 January 2019
                                                   prepared    by  EDGE     Consulting
                                                   Engineers

                         JSP-SD-212         D      FRP Reinforced Pontoon Construction 9 September 2020
                                                   Standard Flat Deck and Float A Boat
                                                   Pontoons     prepared  by     EDGE
                                                   Consulting Engineers

                         JSP-SD-142         F      Pile Bracket Construction to Suit 400 – 9 September 2020
                                                   450 Piles & 8 Roller Bracket prepared
                                                   by EDGE Consulting Engineers

                      Currency Period
               2.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with by 2 July 2026, unless an application to extend the currency period is
                      approved by Council.
                      Performance Bond
               3.     Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      commencement of the works. The cash bond or trading bank guarantee will be returned on
                      performance of the conditions of this approval less any costs incurred by Council in respect
                      of enforcing performance of this permit. Council reserves the right to call upon the bond or
                      guaranteed sum to effect compliance with conditions.
                      General Conditions
               4.     The maximum number of vessels that may be berthed, moored, attached or stored on the
                      structure must not exceed 2.
               5.     The use of the pontoon must not cause any adverse effects on the amenity of the surrounding
                      areas including changes to light, views, air quality and noise.
               6.     Vessels berthed/moored at the pontoon and mooring pile must be located a minimum of 1.0
                      metre from the prolongation of the property boundaries.
               7.     The pontoon is to be used for private purposes only with no commercial operations to be
                      undertaken.



                                                                                                    Page 2 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 3

               8.     Boat repair activities are not permitted on site.
               9.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall
               10.    All structures must have no detrimental effects on stormwater drains and/or easements.
               11.    A rigid handrail must be fitted on at least one side of the walkway. The handrail must be of
                      an open design and in accordance with the approved plans.
               12.    No boatlifting devices are to be attached or moored at the pontoon structure for the purpose
                      of elevating a vessel above the water without Council approval.
               13.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               14.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               15.    The pontoon is to be used for private purposes only with no commercial operations to be
                      undertaken.
               16.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               17.    The mooring facility must not be utilised for live-aboard purposes.
               18.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               19.    Certification by a Registered Professional Engineer of Queensland that states that the
                      pontoon and gangway are constructed in accordance with best practice methods and are
                      structurally sound must be submitted to Council. This certification must be submitted to
                      Council within three (3) months of the completion of the works. A final inspection and
                      approval of the structure by Council’s Inspector is also required. Please contact Council’s
                      Development Assessment Branch on 5329 6500 to arrange the inspection.
               20.    This approval lapses where the construction of the pontoon and gangway has not
                      commenced within two (2) years of the date of issue of the approval, unless application is
                      made and approved by Council for an extension.
               21.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans




                                                                                                    Page 3 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 4

               5.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status        Referral Agency and Referral Trigger                  Response
                                       Address

                Concurrence            Department of State      Schedule 10, Part 17,        The agency provided its
                                       Development,             Division 1 – Tidal Works     response on 14 June
                                       Manufacturing,           or work in a Coastal         2024 (Reference No.
                                       Infrastructure, and      Management District          2405-40643 SRA). A
                                       Planning (SARA)                                       copy of the response is
                                       SARA – SEQ North                                      attached
                                       Region Office (07)
                                       5352 9701 or email:
                                       [email protected]

               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Aboriginal Cultural Heritage Act 2003
               6.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.


                                                                                                        Page 4 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 5

               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,




               Mark Lewis
               Coordinator - Engineering


               Enc:   Appeal Rights
                      Referral Agency Response
                      Approved Plans/Documents

               cc.    SARA at DILGP
                      Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/
                      (for assistance, contact DILGP at 5352 9701 or email [email protected])

                      Unitywater




                                                                                                            Page 5 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 6

                                       Referral Agency Response
                                       PLANNING ACT 2016 & PLANNING REGULATION 2017




                                                                                      Page 6 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 7

 

 

Queensland
Government

‘SARA reference: 2405-40643 SRA
Council reference: MCU24/0069 & OPW24/0070
Applicant reference: 04808

14 June 2024

Chief Executive Officer
Noosa Shire Council
PO Box 141

Tewantin QLD 4565
[email protected]

Attention: Mark Lewis

Dear Mark

SARA referral agency response—22 Noosa Parade, Noosa
Heads QLD 4567

(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 4 June 2024.

 

 

Response
Outcome: Referral agency response — with conditions
Date of response: 14 June 2024
Conditions: The conditions in Attachment 1 must be attached to any
development approval
Advice: Advice to the applicant is in Attachment 2
Reasons: The reasons for the referral agency response are in Attachment 3
Development details
Description: Development permit Material Change of Use - Landing —
Residential
Operational Works — Prescribed Tidal
Works (pontoon and gangway)
SARA role: Referral agency
Brisbane regional office
Level 13, 1 Wilkam Street. Brisbane
Page 1 of 7 PO Box 15009 CITY EAST QLD 4002

 

 

Document Set ID: 23098815 Page 7 of 15

Version: 2, Version Date: 10/07/2024

Page 8

 

2405-40643 SRA

SARA trigger: Schedule 10, Part 17, Division 3, Table 1, Item 1
(Planning Regulation 2017) Operational work that is tidal works or work in a coastal management
district

Schedule 10, Part 17, Division 3, Table 2, Item 1
Operational work that is tidal works or work in a coastal management
district in tidal waters (maritime safety)

SARA reference: 2405-40643 SRA
Assessment manager: Noosa Shire Council
Street address: 22 Noosa Parade, Noosa Heads QLD 4567
Real property description: Lot 10 on N21841
Applicant name: LVS Capital Pty Ltd A.C.N 653 078 570
Applicant contact details: Cl- The Jetty Specialist
18 Ron Parkinson Crecent
Corbould Park QLD 4551
[email protected]
Human Rights Act 2019 Consideration of the Human Rights Act 2019 sections 15 to 37 has
considerations: been undertaken as part of this decision. It has been concluded that

this decision does not limit human rights.

Representations

An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.

 

Acopy of this response has been sent to the applicant for their information.

For further information please contact David Collins, Senior Planner, on 3452 7677 or via email
[email protected] who will be pleased to assist.

Yours sincerely

par her

Rebecca Carpenter
Principal Planner

cc LVS Capital Pty Ltd A.C_N 653 078 570 C/- The Jetty Specialist, [email protected]

Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant

Attachment 3 - Reasons for referral agency response

Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions

‘State Assessment and Referral Agency Page 2 of 7

 

Document Set ID: 23098815 Page 8 of 15

Version: 2, Version Date: 10/07/2024

 

Page 9

2405-40843 SRA

Attachment 1—Referral agency conditions

(Under section 56(1)(b)(i) of the Planning Act 2076 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

 

No. | Conditions Condition timing
Operational Works - Prescribed Tidal Works (pontoon and gangway)

10.17.3.1.1 — Operational work that is tidal works or work in a coastal management district— The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Environment, Science and Innovation to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following conditions:

 

 

 

 

 

1. The pontoon must be carried out generally in accordance with the For the duration of
following plans: works and to be
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, maintained
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
2. The works to which this approval relates are to be for a private purpose | At all times
only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:

(a) be provided a copy of these referral agency conditions

(b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval

(c) maintain such measures, plant and equipment in a proper and
efficient condition

(4) operate such measures, plant and equipment in a proper and
efficient manner.

4. For the pontoon works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.

5. Should the works become damaged as a result of erosion, flooding or | At all times
storm tide inundation, the registered landowner(s) of the subject land
shail be responsible for the removal of all debris at their own expense.

Operational Works - Prescribed Tidal Works (pontoon and gangway)

10.17.3.2.1 — Operational work that is tidal works or work in a coastal management district in tidal waters

(maritime safety) — The chief executive administering the Planning Act 2016 nominates the Director-

General of the Department of Transport and Main Roads to be the enforcement authority for the

development to which this development approval relates for the administration and enforcement of any

matter relating to the following conditions:

6. The development must be carried out generally in accordance with the | At all times

following plans:

(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02,
Revision A

(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A

 

 

 

 

 

 

 

 

 

 

 

 

State Assessment and Referral Agency Page 3 of 7

 

 

Document Set ID: 23098815 Page 9 of 15

Version: 2, Version Date: 10/07/2024

Page 10

 

2405-40843 SRA

 

(a) Light’mark all vessels, structures, plant and equipment
associated with:
i. the works, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights
ii. operations, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights.

(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the
effectiveness of navigational lighting.

For the duration of
works and for operation
to be maintained at all
times

 

The construction, operation and maintenance of pontoon and any
ship berthed, moored or attached to the structure, must not:

{a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone or

(c) impede the safe navigation of other ships or boats or

(d) restrict safe access to or from neighbouring structures.

For the duration of
works, and at all times

 

 

 

 

 

 

 

9 Remove and dispose of any debris or similar obstruction encountered | For the duration of
whilst undertaking the work at an appropriately licensed facility. works

10. | All piles and/or structures to be demolished, both above and below the | Prior to the completion
waterline must be completely extracted/removed. of the works

‘State Assessment and Referral Agency Page 4 of 7

Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 10 of 15

Page 11

 

2405-40643 SRA

Attachment 2—Advice to the applicant

 

 

General advice

1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.0). If a word remains
undefined it has its ordinary meaning.

 

 

 

 

 

State Assessment and Referral Agency Page 5 of 7

 

 

 

Document Set ID: 23098815 Page 11 of 15

Version: 2, Version Date: 10/07/2024

Page 12

 

2405-40643 SRA

Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

 

The reasons for the SARA's decision are:

The development can comply with State code 7: Maritime safety if carried out in accordance with the

attached conditions. Specifically, the development:

* will not compromise the viable operation of aids to navigation or the safe operation of vessels in
navigable waterways.

The development can comply with State code 8: Coastal development and tidal works, if carried out in

accordance with the attached conditions. Specifically, the development:

* protects life, buildings and infrastructure from the impacts of coastal erosion

* protects and maintains coastal processes, resources, and public access to and along state coastal
land

* accounts for the projected impacts of climate change

* avoids impacts to matters of state environmental significance

* does not result in a significant residual impact on a matter of state environmental significance

Material used in the assessment of the application:

the development application material and submitted plans
Planning Act 2016

Planning Regulation 2017

the SDAP (version 3.0), as published by SARA

the Development Assessment Rules

SARA DA Mapping system

section 58 of the Human Rights Act 2019

Attachment 4—Representations about a referral agency response
provisions

 

(page left intentonaby blank)

State Assessment and Referral Agency Page 6 of 7

Document Set ID: 23098815 Page 12 of 15

Version: 2, Version Date: 10/07/2024

 

Page 13

 

2405-40643 SRA

Attachment 5—Documents referenced in conditions

 

(page left intensonally blank)

State Assessment and Referral Agency Page 7 of 7

Document Set ID: 23098815 Page 13 of 15

Version: 2, Version Date: 10/07/2024

 

Page 14

 

 

PLANS AND DOCUMENTS
referred to in the REFERRAL
AGENCY RESPONSE
SARA ret: 0840862 5RA

Date: 14.Jone 2024

 

we

 

 

 

 

 

 

 

 

 

     

FLAT DBCK
TYPE PONTOON

 

+

 

1 = =e

 

 

 

 

 

 

 

LOT 10
CP N21841

LAYOUT PLAN
SCALE 1:75

 

 

 

 

 

71S CAPITAL PTY LTD (SEROUR)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

LOT 10 (22) NOOSA POE
er mesos EE "
ce wan sa ‘morose PONTOON A TWA A
. :
zi tere Bo “athe A* = g
: (ma test 0 To sues
nm
no 4M I #
? wen ‘ ,
Yetta ttt ; som |
—,
oe 7 _
5 i
, a)
'
PLANS AND DOCUMENTS wt
reterred to in the REFERRAL -
: AGENCY RESPONSE
SIDE_ELEVATION i" SARA ref. 2408 4084) SRA,
‘SCALE 1:50
Date 14g 28
Ll o4
t m ROT Seo ELEVATION
t  Weota ets = |
fre ea wut PROFOSED PONTOONA CATWAK "SSS oes 3 A

 

 

 

 

 

Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Page 14 of 15

 

 

Page 15

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 15 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024

Used in these records

About this file

File size
673 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority MCU24_0069 & OPW24_0070 (AS PUBLISHED).pdf · 673 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.