Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence Department of State Schedule 10, Part 17, The agency provided its
Development, Division 1 – Tidal Works response on 14 June
Manufacturing, or work in a Coastal 2024 (Reference No.
Infrastructure, and Management District 2405-40643 SRA). A
Planning (SARA) copy of the response is
SARA – SEQ North attached
Region Office (07)
5352 9701 or email:
[email protected]
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
3. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
4. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Aboriginal Cultural Heritage Act 2003
6. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
Page 4 of 15
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)Related documentApplication case desk ↗
About this file
- File size
- 673 KB (small file)
- File type
No other editions are linked here.