Approved Plan OPW21-0216

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                      SURVEY                                                                                                                                                                                                                                                 ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                                                                                                                                                                                      1.    THIS DESIGN IS BASED ON LIDAR AND SITE PHOTOS. REFER SURVEY NOTE.                                                       EROSION & SEDIMENT CONTROL                                                                                         8.    THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                                                                                                                                                                                      2.    ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                        OBJECTIVES:                                                                                                              TRENCHES AND STRUCTURES.

                                                                                                                                                                                                      3.    THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.                             1.    THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE                 9.    THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                                                                                                                                                                                                                                                                                                                          REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.                                                FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                                                                                                                                      4.    ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR
                                                                                                                                                                                                            AND ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.                                                         2.    THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND                 10.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                                                                                                                                                                                                                                                                                                                          MAINTENANCE PERIOD.                                                                                                STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.

                                                                                                                                                                                                                                                                                                                                    3.    EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.                        11.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                             CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                                                                                                                      EXISTING SERVICES                                                                                                                                                                                                                                      CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                                                                                                                                                                                                                                                                                                    MANAGEMENT PRINCIPLES:
                                                                                                                                                                                                      1.    THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL                                                                                                                                                  PARTIES.
                                                                                                                                                                                                            BEFORE YOU DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                               4.    THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                       12.   UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                                                                                                                                                                                                                                                                                                          EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                      2.    THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR                                                                                                                                                 BLOCKAGES.
                                                                                                                                                                                                                                                                                                                                          (IECA). THE BASIC PRINCIPLES ARE TO:
                                                                                                                                                                                                            THE ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.
                                                                                                                                                                                                                                                                                                                                              ● MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                                                                      3.    NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                             ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                      SUBSOIL DRAINAGE
                                                                                                                                                                                                      4.    THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING                                 ● MINIMISE EROSION;
                                                                                                                                                                                                                                                                                                                                                                                                                                                       13.   SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED IN ACCORDANCE WITH MRTS03.
                                                                                                                                                                                                            WORKS.                                                                                                                            ● MINIMISE SEDIMENTATION;
                                                                                                                                                                                                                                                                                                                                              ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.                                                    14.   SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                                                                                                                                                                      5.    NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                       15.   SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50m.
                                                                                                                                                                                                            APPROPRIATE AUTHORITIES.
                                                                                                                                                                                                                                                                                                                                    CONSTRUCTION PRE-START MEETING:                                                                                    16.   THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100m.
                                                                                                                                                                                                      6.    EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE
                                                                                                                                                                                                            NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.                                                                        5.    THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH        17.   THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE OUTLET.
                                                                                                                                         SITE                                                                                                                                                                                             AS:
                                                                                                                                                                                                                                                                                                                                              ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                                                                                                                                                                                                                                              ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                                                                                                                      CLEARING, GRUBBING AND DISPOSAL                                                                                                         ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;                                                      CONCRETE
                                                                                                                                                                                                      1.    CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND                                        ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;                                                       1.    CONCRETE WORKS SHALL BE IN ACCORDANCE WITH AS3600 CONCRETE STRUCTURES.
                                                                                                                                                                                                            SEDIMENT CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION                                    ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
                                                                                                                                                                                                                                                                                                                                                                                                                                                       2.    CONCRETE SHALL BE BATCHED USING BLENDED CEMENT: 25% FLYASH & 75% PORTLAND CEMENT. ANY ALTERNATIVE
                                                                                                                                                                                                            OF THESE CONTROL MEASURES.                                                                                                        ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                             PROPORTIONS SHALL BE SUBMITTED FOR APPROVAL.
                                                                                                                                                                                                      2.    CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                                                                                                                                            3.    CONCRETE TEMPERATURE AT PLACEMENT;
                                                                                                                                                                                                      3.    ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.                                                            SITE INSPECTION AND MONITORING:                                                                                            ● NO CONCRETE SHALL BE PLACED IF THE TEMP OF THE CONCRETE IS LESS THAN 10°C OR EXCEEDS 35°C.
                                                                                                                                                                                                      4.    WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.                                                6.    CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF                       ● CONCRETE SHALL BE PLACED AND COMPACTED WITHIN 1 HOUR OF CHARGING THE MIXER FOR CONCRETE
                                                                                                                                                                                                                                                                                                                                          CONTROL MEASURES (E.G. SITE FOREMAN).                                                                                   TEMPERATURES UP TO 32°C & WITHIN 45 MINUTES OF CHARGING THE MIXER FOR CONCRETE TEMPERATURES
                                                                                                                                                                                                      5.    CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.                                                                                                                                                      UP TO 35°C.
                                                                                                                                                                                                                                                                                                                                    7.    ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                                                                                                                      6.    A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.                                                                                                                                                                        4.    ALL CONCRETE SHALL BE VIBRATED UNO.
                                                                                                                                                                                                                                                                                                                                             ● AT LEAST DAILY WHEN RAIN IS OCCURRING;
                                                                                                                                                                                                      7.    CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE                                 ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);                                                5.    PROVIDE 20mm FILLETS OR CHAMFERS FOR EXPOSED CONCRETE EDGES HAVING CONTAINED ANGLE OF LESS THAN
                                                                                                                                                                                                            REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                                 ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;                                                                   120° UNO
                                                                                                                                                                                                      8.    DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE                               ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                       6.    SUPPORT REINFORCEMENT ON PLASTIC CHAIRS AND SPACERS TO GIVE CORRECT CONCRETE COVER.
                                                                                                                                                                                                            LOCAL AUTHORITY.                                                                                                        8.    CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW                   WHERE PLASTIC CHAIRS ARE TO BE TEMPORARILY SUPPORTED BY SOIL:
                                                                                                                                                                                                      9.    CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN                                    CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.                                            ● FOR MESH REINFORCEMENT, PROVIDE 'PIE PLATE' SUPPORT UNDER EACH CHAIR OR POUR 50mm MINIMUM
                                                                                                                                                                                                            INTERIM STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.                               9.    CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.                                          BLINDING CONCRETE

                                                                                           32 CAMPBELLS RD, COOTHARABA,                                                                                                                                                                                                             10.   WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE
                                                                                                                                                                                                                                                                                                                                          MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                       7.    POUR JOINTS
                                                                                                                                                                                                                                                                                                                                                                                                                                                               ● SCABBLE THE FACE OF POUR JOINTS AND CLEAN OFF DUST AND CONTAMINANTS BEFORE NEW POUR
                                                                                                    DAM DESIGN                                                                                        EARTHWORKS / EXCAVATION                                                                                                       11.   THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                       8.
                                                                                                                                                                                                                                                                                                                                                                                                                                                               ● COAT FACE WITH BONDING AGENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                             CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS AND WITH AS3600 CONCRETE
                                                                                                                                                                                                      GENERAL:                                                                                                                            CORRECTIVE ACTIONS TAKEN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                             STRUCTURES;
                                                                                                                                                                                                      1.    ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.                                                                                                                                                  PERFORMANCE CRITERIA:
                                                                                                                                                                                                      2.    ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE                                                                                                                                                ● CRACKS IN CONCRETE (90 DAYS AFTER PLACEMENT) SHOULD NOT EXCEED 0.3mm AT THE SURFACE.
                                                                                                                                                                                                            UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                         ROAD PAVEMENT                                                                                                                   CONCRETE WITH CRACKS EXCEEDING LIMIT SHALL BE REPAIRED.
                                                                                                                                                                                                            STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                                                                                                                                                          OBTAIN SUPERINTENDENT APPROVAL FOR REPAIR METHODS PREFERRED CURING METHOD.
                                                                                                CIVIL ENGINEERING DRAWINGS                                                                                  ENGINEER.
                                                                                                                                                                                                                                                                                                                                    GENERAL:
                                                                                                                                                                                                                                                                                                                                    1.    ASPHALT PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS30.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                ● WHILST PLACING, SPRAY CONCRETE WITH ALIPHATIC ALCOHOL AFTER FIRST SCREED & AGAIN DURING
                                                                                                                                                                                                                                                                                                                                                                                                                                                             FINISHING WORKS:
                                                                                                                                                                                                      3.    ALL EARTHWORK FILLING SHALL BE CARRIED OUT IN ACCORDANCE WITH LEVEL 1 AS3798 COMPACTION STANDARD.
                                                                                                  for TERRY ALLAN JOHNSON                                                                             4.    STOCKPILES SHALL BE COVERED WITH TARPS.
                                                                                                                                                                                                                                                                                                                                    2.    WHERE APPLICABLE, THE ASPHALT OVERLAY IS TO BE TIED-IN NEATLY TO THE KERB AND CHANNEL FOLLOWING EDGE
                                                                                                                                                                                                                                                                                                                                          PLANING.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                ● COMMENCE CURING TOP SURFACE OF SLABS ONCE FINISHING OPERATIONS COMPLETE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    COMMENCE CURING ALL OTHER SURFACES WITHIN 1 HR OF STRIPPING FORMWORK.
                                                                                                                                                                                                      5.    EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.                           3.    UNBOUND PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS05.                                             ● CURE FOR 7 DAYS MINIMUM.
                                                                                                                                                                                                      6.    ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF                        4.    BASE COURSE AND SUB BASE TO BE STEPPED, AT JOINT BETWEEN EXISTING AND PROPOSED PAVEMENT, IN
                                                                                                                                                                                                            EARTHWORKS.                                                                                                                   ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-170.
                                                                              DRAWING INDEX                                                                                                           7.    EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                       5.    ALL PAVING OPERATIONS INCLUDING MATERIAL SUPPLY, CONSTRUCTION PROCEDURES AND TESTING                         REINFORCEMENT
                                                                                                                                                                                                                                                                                                                                          REQUIREMENTS SHALL BE IN ACCORDANCE WITH TMR STANDARDS AND SPECIFICATIONS.                                   1.    REINFORCEMENT SHALL CONFORM WITH TMR MRTS71 'REINFORCEMENT STEEL' .
                                                                                        DRG NO                   REVISION                                DRAWING TITLE                                TOPSOIL:                                                                                                                                                                                                                                         2.    ALL REINFORCEMENT SHALL BE ACRS (AUSTRALIAN CERTIFICATION AUTHORITY FOR REINFORCING STEEL) CERTIFIED.
                                                                                                                                                                                                      8.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY                     EXISTING PAVEMENT:                                                                                                 3.    REINFORCEMENT SHALL BE 'N' GRADE D500N HOT ROLLED HIGH YIELD BARS TO AS 4671. U.N.O.
                                                                                      21513-C000                       A          LOCALITY PLAN, DRAWING INDEX & GENERAL NOTES                              ROOT AFFECTED AREAS MUST BE REMOVED.
                                                                                                                                                                                                                                                                                                                                    6.    WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS                  WHERE 'R' BARS ARE SPECIFIED, THESE SHALL BE ROUND BARS GRADE R250N.
                                                                                       21513-C001                      A          GENERAL ARRANGEMENT, SECTIONS & DETAILS                             9.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                            PER STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF         4.    BAR SHAPES SHALL BE PER TMR STANDARD DRAWING 1043, U.N.O. HOOKS AND COGS SHALL BE DETAILED PER TMR
                                                                                                                                                                                                            DISPOSED OF. TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                                THIS PROCEDURE.                                                                                                    STANDARD DRAWING 1044.
                                                                                                                                                                                                                                                                                                                                    7.    ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO             5.    DO NOT CUT REINFORCEMENT TO CLEAR PENETRATIONS, SLEEVES OR H.D BOLTS. DISPLACE REINFORCEMENT
                                                                                                                                                                                                      SUBSOILS:                                                                                                                           APPLICATION OF SEAL.                                                                                               SLIGHTLY AS NECESSARY AND PROVIDE CORRECT COVER TO THE PENETRATIONS, SLEEVES OR H.D BOLTS.
                                                                              GENERAL NOTES
                                                                              1. DO NOT SCALE DRAWINGS.                                                                                               10.   ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE                      8.    AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT            6.    REINFORCEMENT LAP SPLICE LENGTHS (mm) UNO ON DRAWINGS.
                                                                                                                                                                                                            THE RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                             WITH A MINIMUM THICKNESS OF 100mm.
                                                                              2.    ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.
                                                                                                                                                                                                                                                                                                                                    9.    IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE                                                                          D500N BAR DIAMETER (mm)
                                                                              3.    THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE
                                                                                                                                                                                                      SUBGRADES:                                                                                                                          AFFECTED AREA.
                                                                                    CLARIFICATION OF THE DISCREPANCY.                                                                                                                                                                                                                                                                                                                                            BAR LOCATION                  12           16               20          24    28          32
                                                                                                                                                                                                      11.   SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM 10T FLAT DRUM ROLLER AND ANY                                                                                                                                                                                                                  LAP LENGTH (mm)
                                                                              4.    THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE
                                                                                                                                                                                                            SOFT SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                                                                                                                                                                 ALL OTHER BARS               450          600              850        1200   1400        1750
                                                                                    SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.
                                                                                                                                                                                                      12.   SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE                               TRAFFIC MANAGEMENT                                                                                                           WELDED MESH                                                   225mm LAP
                                                                              5.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT
                                                                                                                                                                                                            ADEQUACY OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.
                                                                                    AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY                                                                                                                                               1.    NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED TRAFFIC
                                                                                    AND THE SUPERINTENDENT.                                                                                           13.   THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A LOADED WATER                             CONTROL PLAN.
                                                                                                                                                                                                            CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF
                                                                              6.    NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN                                                                                                                                            2.    THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE
                                                                                                                                                                                                            DEFORMATION UNDER PROOF-ROLLING.
                                                                                    OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                                                                                                                                      WITHIN THE APPROVED HOURS STIPULATED.
                                                                                    CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE                  14.   THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING
                                                                                                                                                                                                                                                                                                                                    3.    THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED
                                                                                    REQUIREMENTS THEREOF.                                                                                                   THIS INSPECTION.
                                                                                                                                                                                                                                                                                                                                          TRAFFIC CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
                                                                              7.    ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                                                                                                                                       4.    THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC
                                                                              8.    A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS.                                         STOCKPILE MANAGEMENT:                                                                                                               MANAGEMENT ISSUES.
                                                                              9.    THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF                15.   CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A                         5.    ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS,
                                                                                    THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                         GUTTER, DRAIN OR WATER BODY, SUCH AS:                                                                                         INCLUDING MOTORISTS AND PEDESTRIANS.
                                                                                                                                                                                                              ● ON A ROAD PAVEMENT;
                                                                              10.   WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE
                                                                                                                                                                                                              ● WITHIN AN OVERLAND FLOW PATH;
                                                                                    AND SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                              ● ADJACENT TO STREAM BANKS.
                                                                              11.   THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;                                                                                                                                                                                          STORMWATER DRAINAGE
                                                                                                                                                                                                      16.   CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM
                                                                                      ● CONSTRUCTION PRE-START MEETING
                                                                                                                                                                                                            STOCKPILES CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                   1.    EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH
                                                                                      ● SET OUT
                                                                                                                                                                                                      17.   ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT                             STANDARD DRAWING IPWEAQ DS-0030 (TYPE 2).
                                                                                      ● DEMOLITION
                                                                                      ● SUBGRADE PROOF-ROLLS                                                                                                CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.                                                                 2.    ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.
                                                                                      ● PRE-SEAL PROOF-ROLLS                                                                                                                                                                                                                                                                                                                                                                                                            -

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                    3.    ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                      ● CONCRETE PRE-POURS                                                                                            SITE REHABILITATION:                                                                                                                STANDARD DRAWING IPWEAQ DS-019.
                                                                                      ● FINAL INSPECTION
                                                                                                                                                                                                      18.   ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                        4.    ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                              12.   THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                   COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                             WITH STANDARD DRAWING IPWEAQ DS-020.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                APPROVED PLAN
J:\2021\21513ID1_32 Campbells Rd, Cootharaba\4.CADD\#ACAD\21513_CIVIL.dwg




                                                                                    ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF
                                                                                                                                                                                                      19.   SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                         5.    THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND

                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OPW21/0216 27 AUG 2021
                                                                                    PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                            MINIMUM DEPTH OF 300mm.                                                                                                       STRUCTURES.
                                                                              13.   FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE
                                                                                                                                                                                                      20.   TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                 6.    ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                    SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                      21.   ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                      7.    THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN




                                                                            COPYRIGHT ©                                                                                      Associated Consultants               Client                                                                                                            Drawn                    Verified                  Project                                                               Drawing Title                                                                    Scale               Sheet Size
                                                                                                                                                                                                                                                                                                                                    AR                       BD
                                                                            This drawing is subject to
                                                                            copyright in accordance with                                                                                                          TERRY ALLAN JOHNSON                                                                                                                                                  32 CAMPBELLS RD, COOTHARABA                                           LOCALITY PLAN, DRAWING INDEX                                                      AS SHOWN              A1
                                                                            the agreement between TOD                                                                                                                                                                                                                               Designed                 Verified
                                                                            Consulting Pty Ltd (tc) and tc's                                                                                                                                                                                                                        AR                       BD                        DAM DESIGN                                                            & GENERAL NOTES                                                                  Drawing Number
                                                                            client. This drawing shall only
                                                                            be used for this specific project.                                                                                                                                                                                                                      Approved                 RPEQ No                   RP DESCRIPTION      LOT 6 RP810777                                                                                                                             21513-C000
                                                                            This drawing shall not be used                                                                                                                                                                 Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   B. DOWNES                14873                     LOCAL AUTHORITY     NOOSA SHIRE COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                       MCU APPROVAL        -                   HORIZ DATUM GDA94 Z56                              0     10     20     30    40     50       60                Sheet                Revision
                                                                            for construction until marked as                                                                                                                                                                          PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                  A    27.07.21   FOR OPW APPROVAL                    AR                                                                                                   [email protected]     www.todconsulting.com                                                       ROL APPROVAL        -                   VERT DATUM AHD
                                                                            'Issued For Construction' in the
                                                                            revision description.                Rev    Date      Revision Description               Drawn                                                                                                                 ABN 39 128 805 336                                                               27.07.21   OPW APPROVAL        -                   RL DATUM    NA                                         MEASUREMENT BAR - INCREMENTS IN mm                              1 of 2         A
Log in to download the original file

Approved Plan OPW21-0216.pdf · 4.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

                                                                                                                                                                                                                                                                                                                                 LOT 7
                                                                                                                                                                                                                                                      EXTENTS OF EARTHWORKS
                                                                                                                                                                                                                                                      TIE IN NEATLY TO EXISTING SURFACE                                         RP810777




                                                                                                                                                                                                                                                                                                                       PR
                                                                                                                                                                                                                                                                                                                         OP
                                                                                                                                                                                                                                                                                                                            E
                                                                                                                                                                                                                                                                                                                           RT
                                                                                                                                                                                                                                                                                                                             YB
                                                                                                                                                                                                                                                                                                                                OU
                                                                                                                                                                                                                                                                                                                                   ND
                                                                                                                                                                                                                                                                                                                                    RYA
                                                                                                                                                                                                                                                                                                                                                                                                                                                    16




                                                                                                                                                                                                                                                                                                                                                                                                                                             17
                                                                                                                                                                                                                                       2.5




                                                                                                                                                                                                                                                                  5.0




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            15




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  16



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          17
                                                                                                                                                                                                                                             SP

                                                                                                                                                                                                                                               RO HRO
                                                                                                                                                                                                                                                ILL
                                                                                                                                                                                16




                                                                                                                                                                                                                                                   CK UG
                                                                                                                                                                                                                                                    T

                                                                                                                                                                                                                                                        H




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      OP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         E RT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             YB
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OU
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  AR
                                                                                                                         TOP OF DAM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Y
                                                                                                                                                              17




                                                                                                                         APPROX RL 17.0




                                                                                                                                                                                                                    08
                                                                                                                                                                                                                14.0                                                                                                                                                                     LOT 6
                                                                                                                                                                                                                BOTTOM OF DAM
                                                                                                                                                                                                                                                                                                                                                                                        RP810777
                                                                                                                                                                                                                APPROX RL 14.5
                                                                                                                                                                                                         23.2
                                                                                                                                                                                                          59




                                                                                                                                                     1m WIDE (MIN)
                                                                                                                                                                                                                                        15




                                                                                                                                                     GRASS STRIP
                                                                                                                                                                                                                                                                                                                                                                                         SPOIL TO BE RELOCATED
                                                                                                                                                                                                                                                                                                                                                                                         TO THE LOW SIDE OF THE LOT
                                                                                                                                                                                                                                                 16




                                                                                                                                                                                                                                                             17




                                                                                                             LOT 6
                                                                                                            RP810777




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           8.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 000
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            60.
                                                                                                                                                                                                                                                                                                                                                                                                  INDICATIVE EXTENTS BASED ON 1:2 BATTERS




                                                                                                                                                                                5m
                                                                                                                                                 0        1        2   3   4
                                                                                                                                                                                                  GENERAL ARRANGEMENT
                                                                                                                                                                                                                            1:100
                                                                                                                                                                                                                                                                                                                                                                       EARTHWORKS MOUND TO BE HYDROMULCHED




                                                                                                                                          1m WIDE (MIN)
                                                                                                                                          GRASS STRIP                                                                                                                                        APPROX EARTHWORKS                                                                                                                                                                     DA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      RY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 UN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Y   BO
                                                                                                                                                                                                                                                                                             CUT = 510m    3
                                                                                                                                                                                                                                                                                                                                                                     EROSION AND SEDIMENT CONTROL FENCE                                                            E RT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                OP
                                                                                                                                                                                                                                                                                                                                                                                                                                                              PR

                                                                                                   TIE IN NEATLY TO EXISTING SURFACE                                                                                     NATURAL SURFACE
                                                                                                                                                                                                                                                                                  TIE IN NEATLY TO EXISTING SURFACE




                                                                                                                                  TOP OF DAM                                                                                                                            TOP OF DAM
                                                                                                                                  APPROX RL 17.0                                                                                                                        APPROX RL 17.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        LOT 7
                                                                                                                                    -
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       RP810777
                                                                                         NOOSA COUNCIL                                                                                                                               BOTTOM OF DAM
                                                                                                                                                                                                                                     APPROX RL 14.5
J:\2021\21513ID1_32 Campbells Rd, Cootharaba\4.CADD\#ACAD\21513_CIVIL.dwg




                                                                                         APPROVED PLAN
                                                                                      OPW21/0216 27 AUG 2021                                     0        1        2   3   4    5m
                                                                                                                                                                                                     TYPICAL DAM SECTION                                                                                                                                                                  0              4             8   12 m
                                                                                                                                                                                                                                                                                                                                                                                                                                            EARTHWORKS, EROSION AND SEDIMENT CONTROL
                                                                                                                                                                                                                            1:100                                                                                                                                                                                                                                                              1:100


                                                                            COPYRIGHT ©                                                                                                Associated Consultants                       Client                                                                                                               Drawn               Verified                        Project                                                                             Drawing Title                                                                           Scale            Sheet Size
                                                                                                                                                                                                                                                                                                                                                         AR                  BD
                                                                            This drawing is subject to
                                                                            copyright in accordance with                                                                                                                            TERRY ALLAN JOHNSON                                                                                                                                                      32 CAMPBELLS RD, COOTHARABA                                                         GENERAL ARRANGMENT,                                                                      AS SHOWN            A1
                                                                            the agreement between TOD                                                                                                                                                                                                                                                    Designed            Verified
                                                                            Consulting Pty Ltd (tc) and tc's                                                                                                                                                                                                                                             AR                  BD                              DAM DESIGN                                                                          SECTIONS & DETAILS                                                                      Drawing Number
                                                                            client. This drawing shall only
                                                                            be used for this specific project.                                                                                                                                                                                                                                           Approved            RPEQ No                         RP DESCRIPTION       LOT 6 RP810777                                                                                                                                                 21513-C001
                                                                            This drawing shall not be used                                                                                                                                                                                      Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   B. DOWNES           14873                           LOCAL AUTHORITY      NOOSA SHIRE COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                                             MCU APPROVAL         -                   HORIZ DATUM GDA94 Z56                                            0         10   20    30    40     50      60                      Sheet             Revision
                                                                            for construction until marked as                                                                                                                                                                                               PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                  A    27.07.21   FOR OPW APPROVAL                              AR                                                                                                              [email protected]     www.todconsulting.com                                                        ROL APPROVAL         -                   VERT DATUM AHD
                                                                            'Issued For Construction' in the
                                                                            revision description.                Rev    Date      Revision Description                         Drawn                                                                                                                            ABN 39 128 805 336                                                            27.07.21       OPW APPROVAL         -                   RL DATUM    NA                                                        MEASUREMENT BAR - INCREMENTS IN mm                                   2 of 2       A

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.