9.6 The applicant is advised that burning off is an unacceptable method of disposal.
10. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
11. Sediment and erosion control measures must be in place prior to building works. If such
measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways.
Currency
12. The Development Permit for a material change of use lapses if the use has not happened by
25 August 2012, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
0719 1.2 TP07 Floor Plan - Ground Floor – SBT 3 September 2008
Designs
0719 1.3 TP06 Floor Plan - First Floor – SBT Designs 4 July 2008
0719 1.4 TP06 Site Cover Plan - GF & Site Cover Plan 4 July 2008
– FF – SBT Designs
0719 2.1 TP07 Eastern Elevation & Northern Elevation 3 September 2008
– SBT Designs
0719 2.2 TP07 Western Elevation & Southern 3 September 2008
Elevation – SBT Designs
6567-D-1 A Detail Survey – LAU Surveys 14 July 2008
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable).
3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2008.00000811.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.